← Back
Primarily 2 family with 1 store or office
1607 CORTELYOU ROAD
BROOKLYN · BIN 3118465
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R6AZoning
3,468 sfGross Floor Area
3Units
8 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: CHEN GROUP REALTY LLC · 990 sf lot · 3.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Floor 1Under Construction9p · 1 filing · 12 docs
CellarUnder Construction9p · 2 filings · 18 docs
1 job · most recent 08/14/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026Permit IssuedKALE CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Ventilation
__Junk__ NCA24FA 8,400 CFM · Exhaust Fan ×3
Cooling
Gree GS18HP230V1ASI 18,000 BTU · Fan Coil Indoor ×1
GS18HP230V1ASO 18,000 BTU · Condensing Unit ×1
1 job · most recent 08/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/14/2026Signed-offJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
2 jobs · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026Permit IssuedJ Y ELECTRIC INC4 meters, 4 new_meters
02/27/2026Permit IssuedJ Y ELECTRIC INCGeneral Wiring
Building Lifecycle
All (56)Filed (9)Permit Issued (4)Violation (12)Inspection (8)Special Inspection (23)
08/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/24/2026
Filed — Alteration
INSTALL (1) NEW BOILER FOR EXISTING 2-FAMILY DWELLING IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01390540-P2
08/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/21/2026
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
08/21/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
08/21/2026
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
08/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
08/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
08/14/2026
Filed — Alteration
INSTALL (1) NEW BOILER FOR EXISTING 2-FAMILY DWELLING IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01390540-P1
08/14/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR WITH GENERAL CONSTRUCTION AND MECHANICAL WORKS: NEW PARTITIONS, FLOOR/WALL FINISHES. MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL SPACE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN U
B01356698-P2
08/14/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN 1ST FLOOR AND CELLAR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01356713-P2
07/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/01/2026
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/01/2026
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/04/2026
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
05/08/2026
Permit issued — Boiler Equipment
B01390540-I1-BE
05/06/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/30/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN 1ST FLOOR AND CELLAR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01356713-P1
04/22/2026
Filed — Alteration
INSTALL (1) NEW BOILER FOR EXISTING 2-FAMILY DWELLING IN CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01390540-I1
04/22/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR WITH GENERAL CONSTRUCTION AND MECHANICAL WORKS: NEW PARTITIONS, FLOOR/WALL FINISHES. MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL SPACE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN U
B01356698-P1
04/21/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
04/21/2026
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
04/21/2026
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/30/2026
Violation issued (HPD, closed)
I
03/25/2026
Violation issued (HPD, open)
C
03/25/2026
Violation issued (HPD, open)
C
03/15/2026
Violation issued (HPD, open)
B
03/15/2026
Violation issued (HPD, open)
C
03/15/2026
Violation issued (HPD, open)
B
03/15/2026
Violation issued (HPD, open)
B
03/11/2026
Violation issued (ECB, closed)
Construction
03/02/2026
Permit issued — Plumbing
B01356713-I1-PL
02/11/2026
Permit issued — General Construction
B01356698-I1-GC
02/11/2026
Permit issued — Mechanical Systems
B01356698-I1-MS
02/10/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR AND CELLAR WITH GENERAL CONSTRUCTION AND MECHANICAL WORKS: NEW PARTITIONS, FLOOR/WALL FINISHES. MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL SPACE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN U
B01356698-I1
02/09/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN 1ST FLOOR AND CELLAR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01356713-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHEN GROUP REALTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/23/2022$1.4M—— → —$398/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI908/24/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor204/09/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394308/14/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJOHN FITZGERALD PLBG &HTG05/08/2026
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG03/02/2026
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC02/11/2026
DOB NOWMechanical SystemsPermit IssuedKALE CONSTRUCTION INC02/11/2026
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/04/2026No Access-Final Boiler Equipment InspectionNo AccessView ↗
05/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/26/2026Tenant Protection Plan Compliance—special
08/24/2026Tenant Protection Plan Compliance—special
08/21/2026Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
08/21/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/21/2026FinalFARHAD BASSIRI-TEHRANIprogress
08/21/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
08/21/2026Tenant Protection Plan Compliance—special
08/21/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/03/2026Tenant Protection Plan Compliance—special
07/01/2026FinalFARHAD BASSIRI-TEHRANIprogress
07/01/2026Tenant Protection Plan Compliance—special
07/01/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/01/2026Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
07/01/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/01/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/01/2026Tenant Protection Plan Compliance—special
04/21/2026Tenant Protection Plan Compliance—special
04/21/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
04/21/2026Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
04/21/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
04/21/2026FinalFARHAD BASSIRI-TEHRANIprogress
04/21/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
04/21/2026Tenant Protection Plan Compliance—special
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026B01390540-P1Request digital key ↗
09/03/2026B01390540-I1Request digital key ↗
09/03/2026B01390540-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026B01390540-P2Open ↗
08/18/2026B01356713-P2Open ↗
08/18/2026B01356713-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026B01356698-P2Open ↗
08/28/2026B01356698-I1Open ↗
08/24/2026B01356698-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B01356698-P2Open ↗
08/28/2026B01356698-I1Open ↗
08/24/2026B01356698-P1Open ↗