Roof6p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 1 drawing sheet
Boiler work as per plans filed. Filed in conjunction with NB 420667497
On file for this project
13 documents · 1 drawing sheet
Plumbing work as per plans filed. Filed in conjunction with NB #
On file for this project
50 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Bulkhead2p · 1 filing · 11 docs
Structural
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 103p · 2 filings · 19 docs
Fire ProtectionStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 93p · 2 filings · 19 docs
Fire ProtectionStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 83p · 2 filings · 19 docs
Fire ProtectionStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 74p · 2 filings · 19 docs
Fire ProtectionStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 2 drawing sheets
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 64p · 2 filings · 19 docs
ArchitectureFire ProtectionStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 2 drawing sheets
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 53p · 2 filings · 19 docs
ArchitectureFire ProtectionStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 43p · 2 filings · 19 docs
ArchitectureFire ProtectionStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 33p · 2 filings · 19 docs
ArchitectureFire ProtectionStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 25p · 3 filings · 20 docs
Fire ProtectionPlumbingStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 2 drawing sheets
Plumbing work as per plans filed. Filed in conjunction with NB #
On file for this project
50 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Floor 14p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Install sprinkler standpipe as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #420667497.
On file for this project
8 documents · 1 drawing sheet
Mechanical work as per plans filed. Filed in conjunction with NB #420667497
On file for this project
41 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 2 drawing sheets
Cellar4p · 4 filings · 20 docs
MechanicalPlumbingStructural
Plumbing work as per plans filed. Filed in conjunction with NB #
On file for this project
50 documents · 1 drawing sheet
Mechanical work as per plans filed. Filed in conjunction with NB #420667497
On file for this project
41 documents · 1 drawing sheet
Structural work for ten story residential building G per plans filed. Filed in conjunction with NB # 420667497
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.