← Back
Three families
1608 11 AVENUE
BROOKLYN · Windsor Terrace-South Slope · BIN 3027074
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R5BZoning
3,288 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Three families · 1,212 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
Architecture
Roof5p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/20/2021$2.4M—Private party → Private party$722/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STAGGS YANCEY ARCHITECTS112/05/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKLYN GREENROOF, LLCGeneral Contractor104/09/2026
Building Lifecycle
All (22)Filed (1)Permit Issued (1)Signed Off (1)Violation (17)Special Inspection (2)
04/30/2026
Violation issued (HPD, open)
A
03/12/2026
Signed off — Alteration
Green Roof installation on roof of 3-story 3 family dwelling. No change to use, occupancy or egress. The green roof installation does not disturb the existing newly re-roofed building in any way. The green roof utilizes a gravity weighted system only.
B01128208-I1
11/19/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
01/15/2025
Permit issued — Green Roof
B01128208-I1-GR
12/05/2024
Filed — Alteration
Green Roof installation on roof of 3-story 3 family dwelling. No change to use, occupancy or egress. The green roof installation does not disturb the existing newly re-roofed building in any way. The green roof utilizes a gravity weighted system only.
B01128208-I1
11/26/2024
Violation issued (HPD, open)
I
10/16/2024
Special inspection requirement — Final
INGER YANCEY
10/16/2024
Special inspection requirement — Maintenance information
INGER YANCEY
04/03/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
03/20/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, open)
I
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
06/01/2021
Violation issued (HPD, closed)
C
04/05/2021
Violation issued (HPD, closed)
A
10/12/2018
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
05/08/1987
Violation issued (HPD, open)
B
05/08/1987
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGreen RoofSigned-offBROOKLYN GREENROOF01/15/2025
1 project · most recent 05/13/2021
General Wiring
FiledStatusContractorScope
05/13/2021CompleteRIVIERA ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/16/2024FinalINGER YANCEYprogress
10/16/2024Maintenance informationINGER YANCEYenergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026B01128208-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026B01128208-I1Open ↗
08/30/2026B01128208-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026B01128208-I1Open ↗
▸Other Documents1
▸DOB NOWGreen Roof Maintenance Plan1
08/23/2026B01128208-I1Open ↗