← Back
Two stories - detached, small or mid-size
1609 AVENUE P
BROOKLYN · BIN 3181924
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R4-1Zoning
1,824 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: ELAYNE TESSER 2020 TRUST · 2,900 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1 filing · 4 docs
Floor 1Under Construction1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AHT ENGINEERING PLLC108/28/2026
Building Lifecycle
All (3)Filed (1)Permit Issued (1)Special Inspection (1)
09/03/2026
Permit issued — General Construction
B01452970-I1-GC
08/28/2026
Filed — Alteration
MINOR RENOVATION OF INTERIOR NON-LOAD BEARING AND NON-RATED PARTITIONS WITHIN EXISTING 1-FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01452970-I1
08/28/2026
Special inspection requirement — Final
ABRAHAM TAWIL
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPR09/03/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/28/2026FinalABRAHAM TAWILprogress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/15/2026B01452970-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/10/2026B01452970-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B01452970-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/10/2026B01452970-I1Open ↗