← Back
Three families
1609 CROSBY AVENUE
BRONX · BIN 2046030
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R7-1Zoning
3,192 sfGross Floor Area
3Units
0 Open Violations
Three families · Owner of record: 1609 CROSBY AVE LLC · 2,467 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivil
Roof4p · 1 filing · 14 docs
Bulkhead1p · 1 filing · 14 docs
Floor 81p · 1 filing · 14 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 14 docs
Floor 12p · 1 filing · 14 docs
1 job · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
1 job · most recent 03/27/2026
Concrete Masonry
FiledStatusContractorScope
03/27/2026——Concrete, Masonry
1 job · most recent 08/19/2026
Fence
FiledStatusContractorScope
08/19/2026——Fence
Building Lifecycle
All (43)Filed (6)Violation (1)Objection (6)Special Inspection (30)
08/19/2026
Filed — Alteration
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01447459-I1
04/27/2026
Objection raised — Other
04/27/2026
Objection raised — Other
04/20/2026
Objection raised — Other
04/20/2026
Objection resolved — Open
03/27/2026
Filed — New Building
PROPOSED NEW 36 UNIT UAP RESIDENTIAL USE GROUP II APARTMENT BUILDING. TWO TAX LOTS TO BE MERGED INTO ONE ON ONE ZONING LOT. 8-STORY WITHOUT CELLAR. CONSTRUCTION CLASS I-B.
X01374029-I1
03/27/2026
Filed — New Building
PROPOSED NEW 36 UNIT UAP RESIDENTIAL USE GROUP II APARTMENT BUILDING. TWO TAX LOTS TO BE MERGED INTO ONE ON ONE ZONING LOT. 8-STORY WITHOUT CELLAR. CONSTRUCTION CLASS I-B.
X01374029-S2
03/27/2026
Filed — New Building
PROPOSED NEW 36 UNIT UAP RESIDENTIAL USE GROUP II APARTMENT BUILDING. TWO TAX LOTS TO BE MERGED INTO ONE ON ONE ZONING LOT. 8-STORY WITHOUT CELLAR. CONSTRUCTION CLASS I-B.
X01374029-S3
03/26/2026
Special inspection requirement — Subgrade Inspections
03/26/2026
Special inspection requirement — Masonry
03/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/26/2026
Special inspection requirement — Concrete - Cast-In-Place
03/26/2026
Special inspection requirement — Concrete - Cast-In-Place
03/26/2026
Special inspection requirement — Structural Cold-Formed Steel
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — Footing and Foundation
03/18/2026
Special inspection requirement — Air barrier - visual inspection
03/18/2026
Special inspection requirement — Concrete - Cast-In-Place
03/18/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/18/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
03/18/2026
Special inspection requirement — Subgrade Inspections
03/18/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
03/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/18/2026
Special inspection requirement — Electrical motors and elevators
03/18/2026
Special inspection requirement — Lighting controls
03/18/2026
Special inspection requirement — Fenestration air leakage
03/18/2026
Special inspection requirement — Lighting in dwelling units
03/18/2026
Special inspection requirement — Fenestration areas
03/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/18/2026
Special inspection requirement — Maintenance information
03/18/2026
Special inspection requirement — Metering
03/18/2026
Special inspection requirement — Exterior lighting power
03/18/2026
Special inspection requirement — Insulation placement and R values
03/18/2026
Special inspection requirement — Interior lighting power
03/18/2026
Special inspection requirement — Air barrier — testing
01/27/2026
Objection resolved — Addressed
01/09/2026
Objection raised — Other
12/22/2025
Filed — Full Demolition
Full demolition to a two story house
X01320988-I1
10/17/2025
Filed — New Building
PROPOSED NEW RESIDENTIAL APARTMENT BUILDING
X01301172-I1
04/05/2019
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1609 CROSBY AVE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2019$570K—Private party → Private party$179/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADROIT ENGINEERING PLLC108/19/2026
BADALY ARCHITECTS403/27/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
03/26/2026Subgrade Inspections—special
03/26/2026Masonry—special
03/26/2026Subsurface Investigations (Borings/Test Pits)—special
03/26/2026Concrete - Cast-In-Place—special
03/26/2026Concrete - Cast-In-Place—special
03/26/2026Structural Cold-Formed Steel—special
03/25/2026Final—progress
03/25/2026Final—progress
03/25/2026Footing and Foundation—progress
03/18/2026Air barrier - visual inspection—energy_progress
03/18/2026Concrete - Cast-In-Place—special
03/18/2026Excavations - Sheeting, Shoring, and Bracing—special
03/18/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/18/2026Subgrade Inspections—special
03/18/2026Subsurface Investigations (Borings/Test Pits)—special
03/18/2026Energy Code Compliance Inspections—progress
03/18/2026Fire-Resistance Rated Construction—progress
03/18/2026Electrical motors and elevators—energy_progress
03/18/2026Lighting controls—energy_progress
03/18/2026Fenestration air leakage—energy_progress
03/18/2026Lighting in dwelling units—energy_progress
03/18/2026Fenestration areas—energy_progress
03/18/2026Fenestration and door U-factor and product ratings—energy_progress
03/18/2026Maintenance information—energy_progress
Latest 25 of 54.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026X01447459-I1Request digital key ↗
08/17/2026X01320988-I1Request digital key ↗
08/17/2026X01374029-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026X01374029-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X01374029-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026X01447459-I1Open ↗
08/17/2026X01374029-I1Open ↗
08/17/2026X01374029-S3Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026X01374029-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026X01374029-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/17/2026X01374029-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/17/2026X01374029-I1Open ↗
08/13/2026X01320988-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026X01374029-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01320988-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026X01374029-I1Open ↗