Elevator apt, fireproof without stores
Bronx River (NYCHA)
1609 EAST 174 STREET · Soundview-Bruckner-Bronx River · BIN 2092906
💬 Discuss this project
1952Year Built
14Stories
D3Building Class
R6Zoning
1,214,370 sfGross Floor Area
1,251Units
LL97 Covered26 Open Violations 11 unresolved · 15 paperwork only ▸FISP: No Report Filed
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 570,383 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction19p · 3 filings · 20 docs
CellarUnder Construction76p · 1 filing · 20 docs
Site & exteriorUnder Construction63p · 5 filings · 20 docs
Filed — no permit issued1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA5809/13/2026
NYC Housing Authority2807/08/2026
SKYWORX CONTRACTING603/21/2026
NEW YORK CITY HOUSING AUTHORITY503/21/2026
NEELAM CONSTRUCTION CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK CONSULTING SERVICES, INC208/08/2026
H2M ARCHITECTS AND ENGINEERS1808/15/2025
ROBERT BEE, RA401/22/2025
JOEL PHAGOO P.E. PLLC305/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY WIDE EXPEDITING4403/21/2026
JOEL PHAGOO P.E. PLLC303/21/2026
AE DESIGN SOLUTION203/21/2026
JOEL PHAGOO P E303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC CONTRACTING CORPPlumbing1007/16/2026
DYNAMIC US, INCGeneral Contractor807/08/2026
VIKRANT CONTRACTING & BUILDERGeneral Contractor707/08/2026
ZORIA HOUSING, LLCGeneral Contractor607/08/2026
TRISTATE PLBG SVCS CORPPlumbing407/02/2026
MNK ENTERPRISES LLCGeneral Contractor208/11/2026
Q.Y. ELECTRIC, INCElectrical103/22/2026
SIEGEL, SElectrical103/21/2026
AMMITZBOLL, PAULElectrical103/21/2026
SUTTON, ALEXElectrical103/21/2026
STEPHENS, KENNETHElectrical103/21/2026
ANZELM KRYSAElectrical103/21/2026
BAKER, WElectrical103/21/2026
COLE, VINCENTElectrical103/21/2026
LADIKOS, DIMITRIOSElectrical103/21/2026
LOCAL 40 IRON WORKERS UNIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198108/26/2026
360 ENGINEERING P.C.7496206/26/2026
TECTONIC ENGINEERING CONS1061908/15/2025
Building Lifecycle
All (184)Filed (30)Permit Issued (34)Signed Off (4)Facade (FISP) (14)Violation (32)Inspection (16)Objection (24)Special Inspection (30)
08/26/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE REPAIR WORK AND INSPECTION AT 1575 EAST 174 STREET, BRONX, NY 10472.
X01450302-I1
08/26/2026
Special inspection requirement — Post-installed Anchors
WALIUR RAHMAN
08/26/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
WALIUR RAHMAN
08/10/2026
Permit issued — Construction Fence
X01442303-I1-FN
08/10/2026
Permit issued — Sidewalk Shed
X01442313-I1-SH
08/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1575 EAST 174 STREET BRONX NY 10472 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01442303-I1
08/08/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 1575 EAST 174 STREET BRONX NY 10472 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01442313-I1
07/29/2026
Signed off — Alteration
Installation of suspended scaffold for facade work or inspection. we are not changing any drawing , we are only changing special inspection agency to a different engineer
X01281022-I1
07/21/2026
Violation issued (ECB, open)
Construction
07/15/2026
Permit issued — Boiler Equipment
X00648556-S4-BE
07/06/2026
Special inspection requirement — Post-installed Anchors
PETER FOSTER
07/06/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
PETER FOSTER
06/30/2026
Permit issued — Boiler Equipment
X00648556-S7-BE
06/26/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. we are not changing any drawing , we are only changing special inspection agency to a different engineer
X01281022-P1
06/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
PETER FOSTER
06/23/2026
Special inspection requirement — Post-installed Anchors
PETER FOSTER
05/08/2026
Permit issued — Plumbing
X00648556-S2-PL
04/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/24/2026
Permit issued — Boiler Equipment
X00648556-S6-BE
04/08/2026
Permit issued — Suspended Scaffold
X01281022-I1-SC
04/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2026
Permit issued — Boiler Equipment
X00648556-Z1-BE
03/24/2026
Permit issued — Plumbing
X00648556-S8-PL
03/19/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/17/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/16/2026
Permit issued — Plumbing
X00648556-S8-PL
03/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/09/2026
Objection resolved — Addressed
01/05/2026
Permit issued — Structural
X00648556-S1-ST
12/29/2025
Permit issued — General Construction
X00648556-I1-GC
12/29/2025
Permit issued — Mechanical Systems
X00648556-S3-MS
10/03/2025
Objection raised — Admin
10/01/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. we are not changing any drawing , we are only changing special inspection agency to a different engineer
X01281022-I1
10/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/15/2025
Filed — Alteration
Modification to mechanical system in conjunction with Domestic hot water heating system upgrade and boiler upgrade as per plans.
X00648556-Z2
08/14/2025
Permit issued — Boiler Equipment
X00648556-S4-BE
08/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
07/30/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
06/30/2025
Permit issued — Boiler Equipment
X00648556-S7-BE
06/20/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
06/20/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
06/20/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
06/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
06/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/11/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/09/2025
Filed — Alteration
Modification to mechanical system in conjunction with Domestic hot water heating system upgrade and boiler upgrade as per plans.
X00648556-A5
06/09/2025
Filed — Alteration
Modification to mechanical system in conjunction with Domestic hot water heating system upgrade and boiler upgrade as per plans.
X00648556-A4
06/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
06/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
06/03/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
06/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
06/03/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC08/10/2026
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC08/10/2026
DOB NOWBoiler EquipmentPermit IssuedDYNAMIC CONTRACTING CORP07/15/2026
DOB NOWBoiler EquipmentPermit IssuedTRISTATE PLBG SVCS CORP06/30/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP05/08/2026
DOB NOWBoiler EquipmentPermit IssuedDYNAMIC CONTRACTING CORP04/24/2026
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC04/08/2026
DOB NOWBoiler EquipmentPermit IssuedDYNAMIC CONTRACTING CORP04/01/2026
DOB NOWPlumbingPermit IssuedDYNAMIC CONTRACTING CORP03/24/2026
DOB NOWPlumbingPermit IssuedDYNAMIC CONTRACTING CORP03/16/2026
DOB NOWStructuralPermit IssuedDYNAMIC US, INC01/05/2026
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC12/29/2025
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC12/29/2025
DOB NOWBoiler EquipmentPermit IssuedDYNAMIC CONTRACTING CORP08/14/2025
DOB NOWBoiler EquipmentPermit IssuedTRISTATE PLBG SVCS CORP06/30/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP05/15/2025
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP05/09/2025
DOB NOWBoiler EquipmentPermit IssuedDYNAMIC CONTRACTING CORP05/01/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP04/29/2025
DOB NOWBoiler EquipmentPermit IssuedDYNAMIC CONTRACTING CORP04/23/2025
DOB NOWPlumbingPermit IssuedDYNAMIC CONTRACTING CORP04/11/2025
DOB NOWStructuralPermit IssuedDYNAMIC US, INC01/31/2025
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC US, INC01/28/2025
DOB NOWMechanical SystemsPermit IssuedDYNAMIC US, INC01/27/2025
DOB NOWBoiler EquipmentPermit IssuedDYNAMIC CONTRACTING CORP10/10/2024
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC11/07/2019
DOB NOWSupported ScaffoldSigned-offZORIA HOUSING, LLC11/07/2019
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI09/10/2019
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI07/01/2019
DOB NOWSupported ScaffoldSigned-offZORIA HOUSING, LLC05/29/2019
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC04/19/2019
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI03/13/2019
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI01/16/2019
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC01/16/2019
BISOTISSUEDZORIA HOUSING, LLC03/20/2020
BISOTISSUEDZORIA HOUSING, LLC01/10/2020
BISEQISSUEDNEELAM CONSTRUCTION CORP02/17/2017
BISEQISSUEDSKYWORX CONTRACTING INC02/16/2017
BISOTISSUEDROMA SCAFFOLDING INC02/11/2015
BISEQISSUEDROMA SCAFFOLDING INC01/05/2015
+ 19 more permits on file
1 project · most recent 08/15/2025
Associated Ducts and Piping
FiledStatusContractorScope
08/15/2025Permit IssuedDYNAMIC US, INCAssociated Ducts and Piping
1 project · most recent 08/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/15/2025Permit IssuedDYNAMIC CONTRACTING CORPGas, Water/Sanitary
5 projects · most recent 08/07/2026
General Wiring
FiledStatusContractorScope
08/07/2026Permit IssuedLIT MODE ELECL CONTG INC—
01/09/2025Permit IssuedDYNAMIC ELEC. SYSTEM INCGeneral Wiring
09/13/2024Permit IssuedDYNAMIC ELEC. SYSTEM INC—
03/25/2019CompleteQ.Y. ELECTRIC, INC—
01/14/2019CompleteQ.Y. ELECTRIC, INC—
2 projects · most recent 08/08/2026
Steel Concrete
FiledStatusContractorScope
08/08/2026Permit IssuedMNK ENTERPRISES LLC1 scope_items
08/15/2025Permit IssuedDYNAMIC CONTRACTING CORPSteel, Concrete
2 projects · most recent 08/08/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/08/2026Permit IssuedMNK ENTERPRISES LLCSidewalk Shed
08/08/2026Permit IssuedMNK ENTERPRISES LLCFence
1 project · most recent 06/26/2026
Suspended Scaffold
FiledStatusContractorScope
06/26/2026Signed-offSKYLINE RESTORATION INCSuspended Scaffold
2 projects · most recent 08/26/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/26/2026——Suspended Scaffold (SC)
06/26/2026Signed-offSKYLINE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
04/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/17/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/11/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
08/26/2026Post-installed AnchorsWALIUR RAHMANspecial
08/26/2026Alternative Materials - OTCR Buildings Bulletin NumberWALIUR RAHMANspecial
07/06/2026Post-installed AnchorsPETER FOSTERspecial
07/06/2026Alternative Materials - OTCR Buildings Bulletin NumberPETER FOSTERspecial
06/23/2026Alternative Materials - OTCR Buildings Bulletin NumberPETER FOSTERspecial
06/23/2026Post-installed AnchorsPETER FOSTERspecial
08/08/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
07/30/2025Heating SystemsGEORGE GHEBRYALspecial
06/20/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/20/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
06/20/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
06/20/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
06/20/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
06/20/2025Maintenance informationGEORGE GHEBRYALenergy_progress
06/20/2025Post-installed AnchorsGEORGE GHEBRYALspecial
06/03/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
06/03/2025Post-installed AnchorsGEORGE GHEBRYALspecial
06/03/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
06/03/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
06/03/2025Tenant Protection Plan Compliance—special
06/03/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/03/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
06/03/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
06/03/2025Maintenance informationGEORGE GHEBRYALenergy_progress
06/03/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
Latest 25 of 96.
▾Documents — 325 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch26
08/20/2026X00648556-P7Request digital key ↗
08/20/2026X00648556-P1Request digital key ↗
08/20/2026X00648556-S6Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00119740-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00172926-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00119739-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION18
11/18/2020240236026Open ↗
09/17/2020240236026Open ↗
02/21/2020240269455Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION9
03/20/2020240269455Open ↗
07/30/2019240236026Open ↗
02/15/2017240173628Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications110
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/26/2026X00119740-I1Open ↗
08/26/2026X00172926-I1Open ↗
08/16/2026X01442313-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/29/2026X00648556-A1Open ↗
09/23/2026X00648556-S9Open ↗
09/23/2026X01450302-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/29/2026X00648556-A1Open ↗
09/29/2026X00648556-A1Open ↗
09/12/2026X00648556-S3Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
02/15/2017240173628Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
02/15/2017240173628Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
02/15/2017240173628Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/28/2016240085028Open ↗
06/28/2016240086241Open ↗
06/28/2016240086009Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/28/2016240085028Open ↗
06/28/2016240086241Open ↗
06/28/2016240086009Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/27/2010220046288Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/29/2015240036527Open ↗
11/26/2014240036527Open ↗
11/26/2014240036527Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
09/14/2018240236026Open ↗
09/23/2013240036527Open ↗
01/27/2010220046288Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
04/22/2015240036527Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES4
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
02/15/2017240173628Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/26/2026X00172926-I1Open ↗
08/13/2026X00648556-S9Open ↗
08/13/2026X00648556-A5Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/09/2015240086009Open ↗
09/23/2013240036527Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/27/2010220046288Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0233BX201
04/06/2021240269455Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0815BX191
12/10/2020240236026Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
04/06/2021240269455Open ↗
12/10/2020240236026Open ↗
02/21/2020240269455Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
02/09/2015240086009Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/06/2021240269455Open ↗
12/10/2020240236026Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
02/14/2017240173263Open ↗
12/22/2014240085028Open ↗
▸BISNYCECC ANALYSIS2
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/28/2016240086009Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY14
04/06/2021240269455Open ↗
12/10/2020240236026Open ↗
12/08/2020240236026Open ↗
Showing 3 of 14 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
02/09/2015240086009Open ↗
12/31/2014240086241Open ↗
12/22/2014240085028Open ↗
▸Approvals, Objections & Sign-offs52
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter30
09/10/2026X01450302-I1Open ↗
08/18/2026X01281022-P1Open ↗
08/16/2026X01442313-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/13/2026X00648556-I1Open ↗
08/13/2026X00648556-A5Open ↗
08/13/2026X00648556-S4Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/06/2021240269455Open ↗
12/18/2020240236026Open ↗
07/16/2015240036527Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/20/2020240269455Open ↗
07/30/2019240236026Open ↗
05/27/2011220046288Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/27/2010220046288Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00648556-Z2Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT9
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
06/28/2016240086009Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
04/06/2021240269455Open ↗
12/10/2020240236026Open ↗
▸Filing & Intake Forms15
▸BISEFILING JOB APPLICATION COVER SHEET8
02/21/2020240269455Open ↗
09/14/2018240236026Open ↗
02/15/2017240173628Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
06/29/2016240085028Open ↗
06/28/2016240086241Open ↗
06/28/2016240086009Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET1
01/27/2010220046288Open ↗
▸Other Documents10
▸DOB NOWCalculations3
09/10/2026X01450302-I1Open ↗
08/18/2026X01281022-P1Open ↗
08/13/2026X01281022-I1Open ↗
▸DOB NOWManufacturer's Specifications3
09/10/2026X01450302-I1Open ↗
08/18/2026X01281022-P1Open ↗
08/13/2026X01281022-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION2
02/21/2020240269455Open ↗
02/09/2015240086009Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026X00648556-P7Open ↗
08/13/2026X00648556-I1Open ↗