← Back
BuildNYC
Elevator cooperative
161-08 JEWEL AVENUE
QUEENS · BIN 4451560
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R6Zoning
363,265 sfGross Floor Area
383Units
LL97 CoveredRent Stabilized93 Active Violations 91 unresolved · 2 paperwork only ▸
Elevator cooperative · Owner of record: Electchester 1 Hous C · 463,139 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarThird Housing Company, INC.1p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
First Housing Company1003/21/2026
Third Housing Company707/08/2026
Second Housing Co203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company211/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Commercial Comb Service & InsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851111/04/2022
Building Lifecycle
05/11/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
01/14/2026
Boiler inspection report filed
Initial · no defects · Accepted
11/21/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
06/16/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
05/09/2025
§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE…
HPD violation · open
36 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCommercial Combustion Services12/09/2022
DOB NOWGeneral ConstructionSigned-offCommercial Comb Service Ins12/09/2022
BISOTISSUEDAmerican Solar Partners05/23/2023
BISOTISSUEDAmerican Solar Partners07/12/2022
BISOTISSUEDAmerican Solar Partners01/12/2022
BISOTISSUEDRelated Services11/26/2018
BISOTISSUEDRelated Services07/20/2018
BISPLISSUEDVarsity Plumbing & Heating12/17/2014
BISPLISSUEDCC Controlled Plumbing Co09/09/2014
BISBLISSUEDCC Controlled Plumbing Co09/09/2014
BISEQISSUEDCobra Kitchen Ventilation06/10/2014
BISEQISSUEDArsenal Scaffold01/08/2013
4 projects · most recent 07/15/2024
General Wiring
FiledStatusContractorScope
07/15/2024Permit IssuedHylan Datacom & Electrical—
11/16/2023CompleteEldor Electric—
01/08/2021CompleteEldor Electric—
09/13/2019CompleteEldor ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/10/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/13/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
116 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account