← Back
Car sales or rental lots without showroom
161-10 HILLSIDE AVENUE
QUEENS · Jamaica · BIN 4209004
💬 Discuss this project
1964Year Built
1Stories
GUBuilding Class
C4-4DZoning
300 sfGross Floor Area
2Units
4 Open Violations 1 unresolved · 3 paperwork only ▸FDNY Report ↗
Car sales or rental lots without showroom · Owner of record: HP MURAL HILLSIDE AVENUE HOUSING DEVELOP MENT FUND · 22,682 sf lot · 0.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionCivilGeneral
Roof6p · 1 filing · 15 docs
Bulkhead2p · 1 filing · 15 docs
Floor 152p · 1 filing · 15 docs
Floor 148p · 1 filing · 15 docs
Floor 136p · 1 filing · 15 docs
Floor 124p · 1 filing · 15 docs
Floor 115p · 1 filing · 15 docs
Floor 107p · 1 filing · 15 docs
Floor 95p · 1 filing · 15 docs
Floor 85p · 1 filing · 15 docs
Floor 75p · 1 filing · 15 docs
Floor 65p · 1 filing · 15 docs
Floor 55p · 1 filing · 15 docs
Floor 45p · 1 filing · 15 docs
Floor 35p · 1 filing · 15 docs
Floor 24p · 1 filing · 15 docs
Floor 19p · 1 filing · 15 docs
Cellar6p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MURAL REAL ESTATE PARTNERS509/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CURTIS + GINSBERG ARCHITECTS LLP308/07/2026
ETTINGER ENGINEERING ASSOCIATES303/06/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES403/21/2026
Building Lifecycle
All (61)Filed (6)Violation (4)Objection (21)Special Inspection (30)
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/11/2026
Objection resolved — Resolved
09/11/2026
Objection resolved — Resolved
09/11/2026
Objection resolved — Resolved
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/07/2026
Filed — New Building
Install new sprinkler standpipe system in conjunction with NB
Q01289631-S2
08/07/2026
Filed — New Building
Install new sprinkler standpipe system in conjunction with NB
Q01289631-S1
08/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
08/06/2026
Special inspection requirement — Structural Steel - Welding
08/06/2026
Special inspection requirement — Concrete - Cast-In-Place
08/06/2026
Special inspection requirement — Post-installed Anchors
04/05/2026
Objection raised — Zoning
04/05/2026
Objection raised — Plumbing
04/05/2026
Objection raised — Scope
04/05/2026
Objection raised — Energy
04/05/2026
Objection raised — Fire_Protection
04/05/2026
Objection raised — Admin
04/05/2026
Objection raised — Plumbing
04/05/2026
Objection raised — Inspections
04/05/2026
Objection raised — Fire_Protection
04/05/2026
Objection raised — Zoning
04/05/2026
Objection raised — Energy
04/05/2026
Objection raised — Mechanical
03/31/2026
Objection resolved — Resolved
03/06/2026
Filed — New Building
Install new sprinkler standpipe system in conjunction with NB
Q01289631-S3
03/06/2026
Filed — New Building
Install new sprinkler standpipe system in conjunction with NB
Q01289631-S4
03/06/2026
Filed — New Building
Install new sprinkler standpipe system in conjunction with NB
Q01289631-S5
03/03/2026
Objection raised — Other
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
02/16/2026
Special inspection requirement — Lighting in dwelling units
02/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/16/2026
Special inspection requirement — Shutoff dampers
02/16/2026
Special inspection requirement — Exterior lighting power
02/16/2026
Special inspection requirement — Maintenance information
02/16/2026
Special inspection requirement — Interior lighting power
02/16/2026
Special inspection requirement — Metering
02/16/2026
Special inspection requirement — Lighting controls
02/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/16/2026
Special inspection requirement — Maintenance information
02/16/2026
Special inspection requirement — Electrical motors and elevators
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/16/2026
Special inspection requirement — Heating Systems
02/16/2026
Special inspection requirement — Post-installed Anchors
02/16/2026
Special inspection requirement — Permanent certificate
12/12/2025
Filed — New Building
Install new sprinkler standpipe system in conjunction with NB
Q01289631-I1
12/01/2025
Special inspection requirement — Combustible Exterior Wall Coverings
12/01/2025
Special inspection requirement — Air barrier continuity plan testing
11/23/2025
Special inspection requirement — Fenestration areas
11/23/2025
Special inspection requirement — Vestibules
11/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
11/23/2025
Special inspection requirement — Protection of exposed foundation insulation
05/05/2021
Violation issued (ECB, open)
Construction
04/09/2021
Violation issued (ECB, open)
Construction
04/09/2021
Violation issued (ECB, open)
Construction
Latest 60 of 61 events.
Nothing on file for this building.
1 project · most recent 08/07/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg REYA120AATJA 120,000 BTU · Vrf Outdoor ×1
REYA192AATJA 192,000 BTU · Vrf Outdoor ×1
Daikin FXMA36AAVJU 36,000 BTU · Vrf Indoor ×1
Ventilation
Swegon GOLD RX 011 1,960 CFM · Erv ×5
GOLD RX 012 2,450 CFM · Erv ×1
Greenheck AX-103-400-0608-A150 12,150 CFM · Exhaust Fan ×2
1 project · most recent 08/07/2026
Sprinkler System
FiledStatusContractorScope
08/07/2026——Sprinkler System
1 project · most recent 08/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/07/2026——Gas, Storm, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
08/06/2026Structural Steel - High Strength Bolting—special
08/06/2026Structural Steel - Welding—special
08/06/2026Concrete - Cast-In-Place—special
08/06/2026Post-installed Anchors—special
02/26/2026Energy Code Compliance Inspections—progress
02/16/2026Lighting in dwelling units—energy_progress
02/16/2026HVAC-R and service water piping design and insulation—energy_progress
02/16/2026Shutoff dampers—energy_progress
02/16/2026Exterior lighting power—energy_progress
02/16/2026Maintenance information—energy_progress
02/16/2026Interior lighting power—energy_progress
02/16/2026Metering—energy_progress
02/16/2026Lighting controls—energy_progress
02/16/2026HVAC-R and service water heating equipment—energy_progress
02/16/2026HVAC-R and service water heating system controls—energy_progress
02/16/2026HVAC-R and service water piping design and insulation—energy_progress
02/16/2026HVAC-R and service water heating system controls—energy_progress
02/16/2026HVAC-R and service water heating equipment—energy_progress
02/16/2026Maintenance information—energy_progress
02/16/2026Electrical motors and elevators—energy_progress
02/16/2026Fire-Resistant Penetrations and Joints—special
02/16/2026Heating Systems—special
02/16/2026Post-installed Anchors—special
02/16/2026Permanent certificate—energy_progress
12/01/2025Combustible Exterior Wall Coverings—special
Latest 25 of 41.
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01289631-S3Request digital key ↗
08/17/2026Q01289631-S5Request digital key ↗
08/17/2026Q01289631-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01289631-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01289631-S4Open ↗
08/17/2026Q01289631-S1Open ↗
08/17/2026Q01289631-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026Q01289631-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/15/2026Q01289631-I1Open ↗