← Back
Two stories - detached, small or mid-size
161-32 119 DRIVE
QUEENS · BIN 4265772
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R3AZoning
1,536 sfGross Floor Area
1Units
Rent StabilizedFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 1 filing · 20 docs
Floor 1Under Construction1p · 1 filing · 20 docs
CellarUnder Construction1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT909/13/2026
DEKEL26 LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2025$611K—Private party → DEKEL 26 LLC$398/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN406/08/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor407/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616206/08/2026
AA BUILDING & INSPECTION1519104/20/2026
Building Lifecycle
All (46)Filed (4)Permit Issued (5)Signed Off (1)Inspection (6)Special Inspection (30)
07/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Chimneys and vents
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
07/14/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Structural Wood Frame
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Electric vehicle service equipment requirements
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Permanent certificate
SHAHRIAR QUAYYUM
07/14/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
07/12/2026
Signed off — Alteration
Installation of a temporary construction wood fence. Filed in conjunction with ALT CO #01333517-I1
Q01389508-I1
06/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/08/2026
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01333517-I1
Q01333517-P1
06/03/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
06/03/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
06/03/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/03/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
06/03/2026
Special inspection requirement — Electric vehicle service equipment requirements
SHAHRIAR QUAYYUM
06/03/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
06/03/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
06/03/2026
Special inspection requirement — Chimneys and vents
SHAHRIAR QUAYYUM
06/01/2026
Permit issued — Construction Fence
Q01389508-I1-FN
05/29/2026
Permit issued — Foundation
Q01333517-I1-GC-CX
05/07/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/07/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2026
Permit issued — Plumbing
Q01333517-S1-PL
04/23/2026
Permit issued — Construction Fence
Q01389508-I1-FN
04/20/2026
Filed — Alteration
Installation of a temporary construction wood fence. Filed in conjunction with ALT CO #01333517-I1
Q01389508-I1
04/20/2026
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01333517-I1
Q01333517-S1
04/17/2026
Permit issued — Foundation
Q01333517-I1-GC-CX
02/06/2026
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01333517-I1
Q01333517-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-off26 BONIM LLC06/01/2026
DOB NOWFoundationPermit Issued26 BONIM LLC05/29/2026
DOB NOWPlumbingSigned-offPLBG P & H INC04/24/2026
DOB NOWConstruction FenceSigned-off26 BONIM LLC04/23/2026
DOB NOWFoundationPermit Issued26 BONIM LLC04/17/2026
1 project · most recent 06/08/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/08/2026Signed-offPLBG P & H INCGas, Storm, Water/Sanitary
1 project · most recent 12/23/2025
General Wiring
FiledStatusContractorScope
12/23/2025Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 04/20/2026
Fence
FiledStatusContractorScope
04/20/2026Signed-off26 BONIM LLCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/07/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/07/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
07/14/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/14/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
07/14/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
07/14/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
07/14/2026Chimneys and ventsSHAHRIAR QUAYYUMspecial
07/14/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
07/14/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
07/14/2026Structural Wood FrameSHAHRIAR QUAYYUMprogress
07/14/2026FinalSHAHRIAR QUAYYUMprogress
07/14/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
07/14/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
07/14/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
07/14/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
07/14/2026MeteringSHAHRIAR QUAYYUMenergy_progress
07/14/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
07/14/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
07/14/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
07/14/2026Electric vehicle service equipment requirementsSHAHRIAR QUAYYUMenergy_progress
07/14/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
07/14/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
07/14/2026Permanent certificateSHAHRIAR QUAYYUMenergy_progress
07/14/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
06/03/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
06/03/2026MeteringSHAHRIAR QUAYYUMenergy_progress
06/03/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 50.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01333517-P1Request digital key ↗
08/17/2026Q01333517-S1Request digital key ↗
08/17/2026Q01333517-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01333517-P1Open ↗
08/13/2026Q01333517-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01333517-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q01333517-P1Open ↗
09/01/2026Q01333517-P1Open ↗
08/29/2026Q01333517-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q01333517-P1Open ↗
09/01/2026Q01333517-P1Open ↗
08/29/2026Q01333517-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01333517-P1Open ↗
08/17/2026Q01333517-S1Open ↗
08/17/2026Q01333517-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/17/2026Q01333517-P1Open ↗
08/13/2026Q01333517-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01333517-P1Open ↗
08/17/2026Q01333517-S1Open ↗
08/17/2026Q01333517-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/17/2026Q01333517-P1Open ↗
08/13/2026Q01333517-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01333517-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/17/2026Q01333517-P1Open ↗
08/13/2026Q01333517-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026Q01333517-P1Open ↗
08/13/2026Q01333517-I1Open ↗
▸DOB NOWPlot Diagram2
08/17/2026Q01333517-P1Open ↗
08/13/2026Q01333517-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01333517-I1Open ↗
08/17/2026Q01333517-P1Open ↗