← Back
BuildNYC
Two stories - detached, small or mid-size
161-34 120TH AVENUE
QUEENS · BIN 4265847
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
1,200 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: NY Equities of NY · 4,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
Site & exteriorTemporary wood fence installation8p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/01/2025$370K—Private party → NY EQUITIES OF NY INC$308/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.k.design609/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yafe MeodGeneral Contractor104/09/2026
Yafe MeodScaffold104/09/2026
BT's Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519509/28/2026
Building Lifecycle
All (50)Filed (6)Permit Issued (3)Signed Off (3)Violation (2)Inspection (6)Special Inspection (30)
10/09/2026
Signed off — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01241438-i1
Q01241438-I1
09/28/2026
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01241438-i1
Q01241438-P3
09/24/2026
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
09/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
09/24/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
09/24/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
09/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/24/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
09/24/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
09/24/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
09/24/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
09/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
09/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
09/24/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
09/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/24/2026
Special inspection requirement — Final
NAVEEN KUMAR
09/24/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
09/24/2026
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
09/24/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
09/24/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
09/24/2026
Special inspection requirement — Metering
Younes Abouyaala
09/24/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
09/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
09/15/2026
Signed off — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01241438-i1
Q01241438-S1
08/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/03/2026
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01241438-i1
Q01241438-P2
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
08/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
08/03/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Younes Abouyaala
08/03/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
08/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/16/2026
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01241438-i1
Q01241438-P1
06/09/2026
Signed off — Alteration
Q01224675-I1
01/08/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/08/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/08/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/22/2025
Violation issued (ECB, closed)
Construction
12/22/2025
Violation issued (ECB, closed)
Construction
12/16/2025
Permit issued — Plumbing
Q01241438-S1-PL
11/27/2025
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01241438-i1
Q01241438-S1
08/25/2025
Permit issued — General Construction
Q01241438-I1-GC-CX
06/24/2025
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units. Filed in conjunction with ALT I app#Q01241438-i1
Q01241438-I1
05/13/2025
Filed — Alteration
Q01224675-I1
05/13/2025
Permit issued — Construction Fence
Q01224675-I1-FN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBT's Plumbing and Heating12/16/2025
DOB NOWGeneral ConstructionPermit IssuedYafe Meod08/25/2025
DOB NOWConstruction FenceSigned-offYafe Meod05/13/2025
1 project · most recent 09/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/28/2026Signed-offBT's Plumbing and HeatingGas, Storm, Water/Sanitary
1 project · most recent 10/01/2025
General Wiring
FiledStatusContractorScope
10/01/2025CompleteIndy ElectricGeneral Wiring
1 project · most recent 09/28/2026
Concrete Wood
FiledStatusContractorScope
09/28/2026Signed-offBT's Plumbing and HeatingConcrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/08/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/08/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
09/24/2026FinalNAVEEN KUMARprogress
09/24/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
09/24/2026Footing and FoundationYounes Abouyaalaprogress
09/24/2026Structural Wood FrameYounes Abouyaalaprogress
09/24/2026Maintenance informationYounes Abouyaalaenergy_progress
09/24/2026Permanent certificateYounes Abouyaalaenergy_progress
09/24/2026Fenestration areasYounes Abouyaalaenergy_progress
09/24/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
09/24/2026Fenestration air leakageYounes Abouyaalaenergy_progress
09/24/2026MeteringYounes Abouyaalaenergy_progress
09/24/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
09/24/2026Interior lighting powerYounes Abouyaalaenergy_progress
09/24/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
09/24/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
09/24/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
09/24/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
09/24/2026Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
09/24/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/24/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
09/24/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
09/24/2026Subgrade InspectionsYounes Abouyaalaspecial
09/24/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
09/24/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/03/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/03/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
Latest 25 of 77.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01224675-I1Request digital key ↗
08/18/2026Q01241438-P2Request digital key ↗
08/18/2026Q01241438-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
10/04/2026Q01241438-P3Open ↗
08/18/2026Q01241438-P1Open ↗
08/13/2026Q01241438-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
10/04/2026Q01241438-P3Open ↗
08/13/2026Q01241438-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
10/04/2026Q01241438-P3Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature11
10/04/2026Q01241438-P3Open ↗
10/04/2026Q01241438-P3Open ↗
10/04/2026Q01241438-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/04/2026Q01241438-P3Open ↗
10/04/2026Q01241438-P3Open ↗
08/27/2026Q01241438-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/04/2026Q01241438-P3Open ↗
08/20/2026Q01224675-I1Open ↗
08/18/2026Q01241438-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
10/04/2026Q01241438-P3Open ↗
08/18/2026Q01241438-I1Open ↗
08/18/2026Q01241438-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
10/04/2026Q01241438-P3Open ↗
08/18/2026Q01241438-P1Open ↗
08/18/2026Q01241438-P2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
10/04/2026Q01241438-P3Open ↗
08/18/2026Q01241438-P1Open ↗
08/13/2026Q01241438-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01241438-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
10/04/2026Q01241438-P3Open ↗
08/18/2026Q01241438-P1Open ↗
08/13/2026Q01241438-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
10/04/2026Q01241438-P3Open ↗
08/18/2026Q01241438-P1Open ↗
08/13/2026Q01241438-I1Open ↗
▸DOB NOWPlot Diagram3
10/04/2026Q01241438-P3Open ↗
08/18/2026Q01241438-P1Open ↗
08/13/2026Q01241438-I1Open ↗
▸DOB NOWProperty Ownership Certification3
10/04/2026Q01241438-P3Open ↗
08/18/2026Q01241438-I1Open ↗
08/18/2026Q01241438-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01241438-I1Open ↗