DOB12/17/2021FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB04/05/20192017 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS)
DOB09/15/20172016 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
DOB12/01/20162015 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
DOB06/10/20152014 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
DOB03/31/20142012 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
DOB10/01/20122011 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS)
DOB12/13/20112010 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS)
DOB06/29/2011V-DOB VIOLATION - ACTIVE
DOB06/13/2011FEU
DOB01/12/2011V-DOB VIOLATION - ACTIVE
DOB11/12/2010VIOLATION ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS (1 OR 2 FAMILY DWELLINGS)
HPD04/22/2005SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT WALL AT BLDG REAR , 4th STORY
HPD04/22/2005SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT FACADE AT FRONT EAST PARAPHET , 4th STORY
ECB03/20/2013WORK W/O PERMIT. WORK NOTED:GROUNDFLOW REMOVED A SECTION OF CEILING 18X 20 2ND FLOOR REMOVED A SECTION OF CEILING 18' X 15' APPROX FOR NEW ELE WORK. STOP ALL WORK. RMDY: OBTAIN A PERMIT OR RESTORE PREMISES TONothing owed — awaiting certificate of correction
ECB02/05/2011SEC. 28-104.7.11"FAILURE TO COMPLY W/A COMMISSIONER.'S ORDER"ON 1/12/11,A "FAILURE TO MAINTAIN" COMMISSIONER'S ORDER WAS WRITTEN TO YOU TO MAINTAIN THE FACADE OF THE ROW HOUSE LOCATED AT 161 E 64ST NY NY. THENothing owed — awaiting certificate of correction
ECB01/26/2010FAILURE TO MAINTAIN PROPERTY IN WIDE - COMPLIANT MANNER FOLLOWING DEFECTS NOTED: 1-SOUTH ELEVATION EXTERIOR WALL HAS SEVERAL CRACKS ABOVE 2ND & 3FL WINDOWS.2-NORTH ELEVATION EXTERIOR WALL HAS CRACKED & DELAMINANothing owed — awaiting certificate of correction
ECB02/12/2009FAILURE TO MAINTAIN EXTERIOR FOLLOWING DEFECTS NOTED 1) SOUTH ELEVATION EXTERIOR WALL HAS SEVERAL CRACKS ABOVE 2ND AND 3RD FL WINDOWS 2) NORTH ELEVATION EXTERIOR WALL HAS CRACKED AND DELAMINATING STUCCO ALONG 2Nothing owed — awaiting certificate of correction
ECB09/17/2008FAILURE TO MAINTAIN EXTERIOR. FOLLOWING DEFECTS NOTED: SOUTH ELEVATIONEXTERIOR WALL HAS SEVERAL CRACKS ABOVE 2ND AND 3RD FLR WINDOWS. NORTH ELEVATION EXTERIOR WALL HAS CRACKED AND DELAMINATING STUCCO ALONG 2NDNothing owed — awaiting certificate of correction
ECB09/17/2008FAILURE TO COMPLY W/ THE COMMISSIONERS ORDER TO FILE A CERT OF CORRECTION W/ THE DOB FOR NOV #34679827P AT TIME OF INSPECTION CONDITION CITED IN NOV #34579827P STILL EXIST. REMEDY: MAKE ALL NECESSARY REPAIRS ANNothing owed — awaiting certificate of correction
ECB06/14/2007FAILURE TO MAINTAIN EXTERIOR WALL. DEFECTS IS CRACKS ON EXTERIOR WALL THRU-OUT VARIOU LOCATION AT EXPOSURE #1. DEFECTIVE WINDOW SILL AT 2 FLALSO PULLING AWAY AROUND WINDOWS, LEADER NOT PROPERLY CONNECTED TONothing owed — awaiting certificate of correction