← Back
Two family converted from one family
161 HAGAMAN PLACE
STATEN ISLAND · Port Richmond · BIN 5025154
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3AZoning
1,512 sfGross Floor Area
2Units
Two family converted from one family · 5,042 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 17 docs
Cellar1p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GARFINKEL ARCHITECT, PLLC103/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.R.P. ELEC'L CONTRG INCElectrical103/22/2026
Building Lifecycle
All (40)Filed (1)Objection (20)Special Inspection (19)
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
04/23/2026
Objection raised — Inspections
04/23/2026
Objection raised — Scope
04/23/2026
Objection raised — Zoning
04/23/2026
Objection raised — Scope
04/23/2026
Objection raised — Scope
04/23/2026
Objection raised — Structural
04/23/2026
Objection raised — Admin
04/23/2026
Objection raised — Fire_Protection
04/23/2026
Objection raised — Fire_Protection
04/23/2026
Objection raised — Fire_Protection
03/26/2026
Filed — Alteration
S01364761-I1
03/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/19/2026
Special inspection requirement — Insulation placement and R values
03/19/2026
Special inspection requirement — Air barrier - visual inspection
03/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/19/2026
Special inspection requirement — Interior lighting power
03/19/2026
Special inspection requirement — Maintenance information
03/19/2026
Special inspection requirement — Fenestration air leakage
03/19/2026
Special inspection requirement — Fenestration areas
03/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/19/2026
Special inspection requirement — Permanent certificate
03/18/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/18/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/18/2026
Special inspection requirement — Subgrade Inspections
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
03/18/2026
Special inspection requirement — Concrete - Cast-In-Place
02/26/2026
Special inspection requirement — Footing and Foundation
02/26/2026
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 10/16/2020
General Wiring
FiledStatusContractorScope
10/16/2020CompleteD.R.P. ELEC'L CONTRG INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/19/2026HVAC-R and service water heating system controls—energy_progress
03/19/2026Insulation placement and R values—energy_progress
03/19/2026Air barrier - visual inspection—energy_progress
03/19/2026Fenestration and door U-factor and product ratings—energy_progress
03/19/2026Interior lighting power—energy_progress
03/19/2026Maintenance information—energy_progress
03/19/2026Fenestration air leakage—energy_progress
03/19/2026Fenestration areas—energy_progress
03/19/2026HVAC-R and service water piping design and insulation—energy_progress
03/19/2026Permanent certificate—energy_progress
03/18/2026Subsurface Investigations (Borings/Test Pits)—special
03/18/2026Excavations - Sheeting, Shoring, and Bracing—special
03/18/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Structural Stability – Alterations of existing buildings—special
03/18/2026Subgrade Inspections—special
03/18/2026Energy Code Compliance Inspections—progress
03/18/2026Concrete - Cast-In-Place—special
02/26/2026Footing and Foundation—progress
02/26/2026Final—progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01364761-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026S01364761-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026S01364761-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01364761-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01364761-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/17/2026S01364761-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026S01364761-I1Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026S01364761-I1Open ↗
▸Other Documents1
▸DOB NOWPlot Diagram1
08/17/2026S01364761-I1Open ↗