← Back
Primarily 3 family with 1 store or office
161 HESTER STREET
MANHATTAN · BIN 1003112
💬 Discuss this project
1920Year Built
4Stories
S3Building Class
C6-2GZoning
4,605 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: HESTER HOLDINGS 161 NY LLC · 1,439 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL CONSTRUCTION807/08/2026
HESTER HOLDINGS 161 NY LLC1307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2022$5.2M—SUN HON REALTY CORP. → HESTER HOLDINGS 161 NY LLC$1,118/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX ENGINEERING, PLLC306/15/2023
ENTHINK ENGINEERS LLC204/28/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL CONSTRUCTION LLCGeneral Contractor407/08/2026
F M ALLIANCE GROUP LLCGeneral Contractor307/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118202/14/2023
Building Lifecycle
All (54)Filed (5)Permit Issued (5)Signed Off (5)Violation (4)Inspection (4)Objection (16)Special Inspection (15)
10/25/2023
Signed off — Alteration
Interior renovation at the 2nd, 3rd and 4th floor apartments of an existing 4-story mixed-use building. No change in use, egress or occupancy.
M00812562-I1
10/13/2023
Signed off — Alteration
Interior renovation at the 2nd, 3rd and 4th floor apartments of an existing 4-story mixed-use building. No change in use, egress or occupancy.
M00812562-S1
10/13/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/10/2023
Signed off — Alteration
Interior renovation at the 2nd, 3rd and 4th floor apartments of an existing 4-story mixed-use building. No change in use, egress or occupancy.
M00812562-S2
10/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2023
Signed off — Alteration
M00867127-I1
08/07/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00867113-I1
07/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/29/2023
Permit issued — Construction Fence
M00812562-S2-FN
06/15/2023
Filed — Alteration
Interior renovation at the 2nd, 3rd and 4th floor apartments of an existing 4-story mixed-use building. No change in use, egress or occupancy.
M00812562-S2
04/29/2023
Permit issued — Supported Scaffold
M00867127-I1-SF
04/29/2023
Permit issued — Sidewalk Shed
M00867113-I1-SH
04/28/2023
Filed — Alteration
M00867127-I1
04/28/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00867113-I1
03/15/2023
Permit issued — Plumbing
M00812562-S1-PL
03/15/2023
Violation issued (HPD, closed)
A
03/08/2023
Permit issued — General Construction
M00812562-I1-GC-CX
02/17/2023
Objection raised — Scope
02/17/2023
Objection resolved — Addressed
02/14/2023
Filed — Alteration
Interior renovation at the 2nd, 3rd and 4th floor apartments of an existing 4-story mixed-use building. No change in use, egress or occupancy.
M00812562-S1
02/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
02/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
02/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
02/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
02/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
02/03/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Xiao Huang
02/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xiao Huang
02/01/2023
Objection raised — Scope
02/01/2023
Objection resolved — Addressed
02/01/2023
Objection raised — Scope
02/01/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Scope
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Admin
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Scope
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Scope
01/31/2023
Objection resolved — Addressed
01/31/2023
Objection raised — Scope
01/31/2023
Objection resolved — Addressed
01/26/2023
Filed — Alteration
Interior renovation at the 2nd, 3rd and 4th floor apartments of an existing 4-story mixed-use building. No change in use, egress or occupancy.
M00812562-I1
01/26/2023
Special inspection requirement — Structural Cold-Formed Steel
Xiao Huang
01/16/2023
Special inspection requirement — Fenestration air leakage
Xiao Huang
01/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Xiao Huang
01/16/2023
Special inspection requirement — Fenestration areas
Xiao Huang
01/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
01/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
01/13/2023
Special inspection requirement — Final
YUNHO LEE
01/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
02/15/2022
Violation issued (HPD, closed)
A
10/25/2016
Violation issued (HPD, closed)
I
08/03/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offF M ALLIANCE GROUP LLC06/29/2023
DOB NOWSupported ScaffoldSigned-offSTEEL CONSTRUCTION LLC04/29/2023
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC04/29/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC03/15/2023
DOB NOWGeneral ConstructionSigned-offF M ALLIANCE GROUP LLC03/08/2023
BISPLISSUEDCATMAN PLUMBING INC06/13/2014
BISEQISSUEDK&C BROTHERS CONSTRUCTION06/13/2014
BISOTISSUEDK&C BROTHERS CONSTRUCTION06/13/2014
2 projects · most recent 04/28/2023
General Wiring
FiledStatusContractorScope
04/28/2023CompleteRICHARD NEU—
03/08/2023CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/13/2023Fire-Resistant Penetrations and JointsXiao Huangspecial
02/13/2023Energy Code Compliance InspectionsXiao Huangprogress
02/13/2023HVAC-R and service water heating equipmentXiao Huangenergy_progress
02/13/2023HVAC-R and service water piping design and insulationXiao Huangenergy_progress
02/13/2023HVAC-R and service water heating system controlsXiao Huangenergy_progress
02/03/2023Construction Operations Influencing Adjacent StructuresXiao Huangspecial
02/03/2023Structural Stability – Alterations of existing buildingsXiao Huangspecial
01/26/2023Structural Cold-Formed SteelXiao Huangspecial
01/16/2023Fenestration air leakageXiao Huangenergy_progress
01/16/2023Fenestration and door U-factor and product ratingsXiao Huangenergy_progress
01/16/2023Fenestration areasXiao Huangenergy_progress
01/16/2023Energy Code Compliance InspectionsXiao Huangprogress
01/13/2023Fire-Resistance Rated ConstructionXiao Huangprogress
01/13/2023FinalYUNHO LEEprogress
01/13/2023Fire-Resistant Penetrations and JointsXiao Huangspecial
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026M00867127-I1Request digital key ↗
08/31/2026M00867113-I1Request digital key ↗
08/30/2026M00812562-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
06/20/2014122004981Open ↗
06/20/2014122004981Open ↗
06/20/2014122004981Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
08/21/2014122004981Open ↗
05/13/2014122004981Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/08/2014122004981Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/08/2014122004981Open ↗
09/08/2014122004981Open ↗
05/13/2014122004981Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026M00867127-I1Open ↗
08/30/2026M00812562-S2Open ↗
08/30/2026M00812562-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M00812562-S1Open ↗
09/01/2026M00812562-S1Open ↗
08/29/2026M00812562-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00812562-S1Open ↗
08/29/2026M00812562-I1Open ↗
08/29/2026M00812562-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE3
09/08/2014122004981Open ↗
09/05/2014122004981Open ↗
08/16/2014122004981Open ↗
▸BISEQUIPMENT USE PERMITS2
08/29/2014122004981Open ↗
08/29/2014122004981Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
08/29/2014122004981Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/13/2014122004981Open ↗
▸Safety & Tenant Protection1
▸BISDS1-Demolition Submittal Certification Form1
06/10/2014122004981Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026M00812562-S1Open ↗
08/15/2026M00812562-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/13/2014122004981Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/08/2014122004981Open ↗
05/13/2014122004981Open ↗
▸BISEN2 - As Built Energy Analysis1
09/08/2014122004981Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/08/2014122004981Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/08/2014122004981Open ↗
05/13/2014122004981Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
08/28/2014122004981Open ↗
08/21/2014122004981Open ↗
▸BISEFILING COVER SHEET1
05/13/2014122004981Open ↗