Whole building & multi-floor projects161 West 16th Street Coop1 filing
Exterior facade repairs as per the plans filed including: Localized facade repairs, including brick masonry and terra cotta replacement, pointing, joint sealant replacement, terracotta / limestone coating.
On file for this project
7 documents
Roof161 West 16th St Owners CORP2p · 3 filings · 13 docs
EquipmentMechanicalStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
Filing application for renovation to apartment 11JL on the 11th floor. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
FILE MECHANICAL APPLICATION TO INSTALL NEW MITSUBISHI UNITS FOR APT. #20A AT THE ROOF TERRACE. OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
BulkheadSlab openings and framingUnder Construction2p · 1 filing · 5 docs
DMStructural
Existing 19 Story building proposed slab openings on 3rd floor through lower roof. proposed work consists of installing steel columns, steel beams, steel frames, composite steel deck and reinforcement of existing building, structure.
On file for this project
5 documents · 2 drawing sheets
Floor 20Unit 20A2 filings · 17 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction
interior renovation in apt 20A
On file for this project
8 documents
plumbing work in apt 20A
On file for this project
9 documents
Floor 19Unit 20A, Unit PH12 filings · 7 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
FILE MECHANICAL APPLICATION TO INSTALL NEW MITSUBISHI UNITS FOR APT. #20A AT THE ROOF TERRACE. OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 181 filing · 3 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Floor 17Unit 17C6 filings · 13 docs
ArchitectureEquipmentMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Renovation to apartment 17C on the 17th Floor. Minor outside terrace work which includes replacement of floor pavers. This permit also includes an addition of an awning on the terrace. Architectural /Construction. No change of use, egress, occupancy.
On file for this project
9 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
interior plumber work only inside apt#17C on the 17th floor.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 16
Floor 15
Floor 14Unit 14A, Unit 14B, Unit 14F6p · 4 filings · 13 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN APT 14F
On file for this project
7 documents · 1 drawing sheet
INTERIOR RENOVATION OF APT 14F.
On file for this project
3 documents
COMBINATION OF APARTMENT 14A&14B ON THE 14TH FLOOR OF AN EXISTING RESIDENTIAL BUILDING. INSTALL (1) NEW WASHER, REPLACE (1) LAV, (1)WC AND (1)TUB, AND CAP AND REMOVE (1) KITCHEN SINK, (1) DISHWASHER AND (1) GAS RANGE.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 13
Floor 12Unit 12C, Unit 12KUnder Construction3 filings · 18 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
HEREBY FILING FOR THE INSTALLATION, REPLACEMENT AND REMOVAL OF FIXTURES IN EXISTING APARTMENT 12K. NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this project
8 documents
interior renovation in apt 12C
On file for this project
7 documents
No filed description on record for this project.
On file for this project
3 documents
Floor 11Unit 11B, Unit 11JL4 filings · 13 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Filing application for renovation to apartment 11JL on the 11th floor. No change in use, egress or occupancy.
On file for this project
6 documents
Plumbing work related to interior renovation of apartment 11jl on the 11th floor. No change in use, egress or occupancy.
On file for this project
6 documents
PLUMBING RENOVATIONS AT APT 11B AS PER PLANS.
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 10
Floor 9Unit 9CUnder Construction1 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
REMOVAL + RELOCATION OF NON LOAD BEARING INTERIOR PARTITIONS AS PER PLANS.
On file for this project
4 documents
Floor 8Unit 8L2 filings · 6 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction
INSTALLING WASHING MACHINE IN APT 8L
On file for this project
3 documents
PLUMBING WORK IN APT 8L
On file for this project
3 documents
Floor 7
Floor 6
Floor 5Unit 5C2 filings
Architecture
Issued Permit Scope
General Construction
Project M01472371Approved
interior renovation of apt 5C
Project M01472517Approved
PLUMBING WORK IN APT 5C
Floor 4Slab openings and framingUnder Construction7p · 2 filings · 18 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction
Existing 19 Story building proposed slab openings on 3rd floor through lower roof. proposed work consists of installing steel columns, steel beams, steel frames, composite steel deck and reinforcement of existing building, structure.
On file for this project
5 documents · 2 drawing sheets
Structural work in conjunction with DOB Job #M01309850-I1
On file for this project
13 documents · 12 drawing sheets
Floor 3Slab openings and framingUnder Construction5p · 2 filings · 18 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction
Existing 19 Story building proposed slab openings on 3rd floor through lower roof. proposed work consists of installing steel columns, steel beams, steel frames, composite steel deck and reinforcement of existing building, structure.
On file for this project
5 documents · 2 drawing sheets
Structural work in conjunction with DOB Job #M01309850-I1
On file for this project
13 documents · 12 drawing sheets
Floor 2Slab openings and framingUnder Construction9p · 7 filings · 20 docs
ArchitectureGeneralStructural
Issued Permit Scope
General Construction
Existing 19 Story building proposed slab openings on 3rd floor through lower roof. proposed work consists of installing steel columns, steel beams, steel frames, composite steel deck and reinforcement of existing building, structure.
On file for this project
5 documents · 1 drawing sheet
Structural work in conjunction with DOB Job #M01309850-I1
On file for this project
13 documents · 12 drawing sheets
No filed description on record for this project.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1Proposed Alteration at7p · 7 filings · 17 docs
ArchitectureElectricalGeneral
Issued Permit Scope
General Construction
Structural work in conjunction with DOB Job #M01309850-I1
On file for this project
13 documents · 12 drawing sheets
No filed description on record for this project.
On file for this project
2 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
2 documents
Latest 3 of 7 filings on this floor.
CellarProposed Alteration at3p · 1 filing · 13 docs
Structural work in conjunction with DOB Job #M01309850-I1
On file for this project
13 documents · 12 drawing sheets
Site & exteriorConstruction fenceUnder Construction3 filings · 11 docs
ArchitectureCivilEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · Sidewalk Shed · Supported Scaffold
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. STORAGE OF MATERIALS ARE ALLOWED IN AREAS INDICATED ON THE DRAWINGS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 5 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 4 drawing sheets