Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHalstead Management1p · 1 filing · 2 docs
Structural
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
Floor 35Unit 35E1p · 1 filing · 5 docs
Plumbing
Issued Permit Scope
Plumbing
REPLACEMENT OF PLUMBING FIXTURES AT APT. 35E (35TH FLOOR).
On file for this project
5 documents
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30Unit 31E4p · 2 filings · 12 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK OF PAT 31E ON THE 30TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
8 documents
ARCHITECTURAL RENOVATION WORK OF APT 31E ON THE 30TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Floor 29
Floor 28
Floor 27
Floor 26Unit 26FG6p · 1 filing · 14 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing work for associated initial application
On file for this project
14 documents · 2 drawing sheets
Floor 25Unit 25C7p · 1 filing · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Apt. 25C: relocate sink and shower controls in one bathroom, shower head and toilet to remain in existing locations, filed in conjunction with general construction.
On file for this project
10 documents
Floor 24
Floor 23
Floor 22Unit 22C10p · 1 filing · 2 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith interior renovation of existing 22nd floor apartment space, Apt 22C, Lease Wood Residence. No change in use, egress or occupancy.
On file for this project
2 documents
Floor 21Unit 21C13p · 2 filings · 14 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
REPLACE (1) TUB, (1) TOILET, (1) LAVATORY, (1) NEW WASHER & (1) LAUNDRY STANDPIPE ON EXISTING ROUGHING. RELOCATE (1) SINK, (1) GAS RANGE & (1) DISH WASHER. PROVIDE (1) NEW SHOWER AT 21ST FLOOR. CAP & REMOVE (1) TUB AT 21ST FLOOR
On file for this project
8 documents · 3 drawing sheets
INTERIOR RENOVATION OF APARTMENT 21C AT 21ST FLOOR. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 20Unit 20F, Unit 20G, Unit 20H7p · 3 filings · 18 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Combine Apts. 20F and 20G, scope of work: combine 2 kitchens into one, renovate 3 bathrooms, no work in powder room, renovate 1 powder room into a laundry room; filed in conjunction with general construction.
On file for this project
12 documents
PLUMBING RENOVATIONS TO EXIST. MULTI-FAMILY DWELLING AT UNIT 20H-20TH FLOOR. PLUMBING RENOVATIONS INCLUDE CHANGING AN EXISTING TUB TO A SHOWER. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
3 documents
INTERIOR RENOVATIONS TO EXIST. MULTI-FAMILY DWELLING AT UNIT 20H-20TH FLOOR. INTERIOR RENOVATIONS INCLUDE NEW FLOORING AND FINISHES THROUGHOUT. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
3 documents
Floor 19Unit 19H1p · 2 filings · 7 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR RENOVATION TO APARTMENT 19H, WORK INCLUDE UPDATE IN KITCHEN CABINETS AND BATHROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 18Unit 18A1p · 1 filing · 8 docs
Architecture
Issued Permit Scope
General Construction
MINOR INTERIOR RENOVATION OF APT #18A PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Floor 17
Floor 16Unit 16A, Unit 17A1 filing · 6 docs
Apartment renovation on 16th floor. 16A
On file for this project
6 documents · 8 drawing sheets
Floor 15
Floor 14Unit 14A, Unit 14B1 filing · 6 docs
Plumbing work for the combination of adjacent apartments 14A and 14B, including replacement of all plumbing fixtures in 14B and the capping and removal of all gas appliances in both apartments.
On file for this project
6 documents · 6 drawing sheets
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Unit 6G3p · 2 filings · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Renovate Apt. 6G- relocate 1 (`) kitchen and one(1) bathroom, renovate one bath,
On file for this project
8 documents
Apt. 6G- replace and install plumbing fixtures, filed in conjunction with GC #M00782712
On file for this project
3 documents
Floor 5
Floor 4Unit 4HUnder Construction5p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Rough and finish plumbing changes.
On file for this project
12 documents
replacement of two water closets, two lavatories, one bath tub, one gas range, one kitchen sink and one washing machine on new roughing, minor relocation of one dishwasher.
On file for this project
10 documents
Floor 3Unit 3A, Unit 3FUnder Construction4p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
TO PROPOSE INTERIOR RENOVATION IN UNIT #3F WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
On file for this project
20 documents
Rough and finish plumbing changes.
On file for this project
12 documents
Floor 2
Floor 1Glenwood Management CORP.23p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Supported Scaffold
limited garage repairs. no change to egress, occupancy.
On file for this project
5 documents · 2 drawing sheets
Office layout has changed. Door for Office 1 has been removed. IT closet has been removed. Storage door has been removed. Existing ceiling has been removed and reinstalled with new ceiling tiles. Slatpanel for aesthetic decoration has been removed.
On file for this project
10 documents
Interior renovation of existing office space removal and installation of non-load bearing partitions. No change in use, egress, or occupancy.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
CellarGlenwood Management CORP.3p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
limited garage repairs. no change to egress, occupancy.
On file for this project
5 documents · 1 drawing sheet
Site & exteriorFacade, Balcony & Railing Restoration11p · 2 filings · 16 docs
ArchitectureElectricalEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Sidewalk Shed
Brick Replacement and concrete patching, including railing repair at all facade all floors, no change in use, occupancy or egress.
On file for this project
6 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
10 documents · 8 drawing sheets