← Back
BuildNYC
Elevator apt, semi-fireproof with stores
1610 MAHAN AVENUE
BRONX · BIN 2046183
💬 Discuss this project
1928Year Built
6Stories
D7Building Class
R7-1Zoning
51,000 sfGross Floor Area
57Units
LL97 CoveredRent Stabilized27 Active Violations 25 unresolved · 2 paperwork only ▸FISP: No Report Filed
Elevator apt, semi-fireproof with stores · Owner of record: Mahan Avenue Associates · 11,206 sf lot · 4.55 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Sub-Basement1 filing
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
R.A. Cohen & Associates2509/13/2026
Mahan Ave Associates1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Magaram Engineering Services105/06/2026
Rigid Structural Design210/06/2025
Walsh107/22/2025
Azimuth Engineering208/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services203/21/2026
Rigging Consultants403/21/2026
Rigid Structural Design403/21/2026
PCS Engineering103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Optimum Building RestorationGeneral Contractor404/09/2026
J&A SolutionsGeneral Contractor303/21/2026
Patagonia Electrical ContractingElectrical103/21/2026
Aurora Electrical ContgElectrical103/21/2026
Himalaya TowersGeneral Contractor106/28/2026
Redgrave Electl MaintnceElectrical103/21/2026
Intersystems Installation S&SScaffold104/09/2026
Applied ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M + K Development Venture8486105/06/2026
PCS Engineering3745201/20/2026
Walsh Engineering9393107/22/2025
Jeremy K McKeon, P.E7263408/05/2024
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 10, sub-cycle C)
The filing window opened 02/21/2027. 1 Cycle 10 filing on record, latest 07/14/2026, status No Report Filed
09/28/2026
Elevator Category 1 inspection report filed
09/18/2026
Signed off — Alteration
Modification to T-Mobile site. Installing 3 antennas and 9 RRU's on the roof. Replace 9 antennas on the roof. Remove 1 cabinet and install 2 cabinets on existing steel platform on the roof.
X01247722-I1
07/14/2026
Cycle 10 facade report submitted
07/10/2026
Cycle 10 facade inspection completed
243 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Himalaya Towers—
DOB NOW—SPD Construction—
DOB NOW—Optimum Building Restoration—
DOB NOW—Optimum Building Restoration—
DOB NOW—Optimum Building Restoration—
DOB NOW—Intersystems Installation S&S—
DOB NOW—Optimum Building Restoration—
DOB NOW—SPD Construction—
DOB NOW—J&A Solutions—
BIS—Gotham Communications—
BIS—Ted Contracting—
BIS—Master Fire Systems—
BIS—Squan Construction Services—
BIS—Express Plumbing Sewr and WTR—
BIS—Pelham Bay Construction—
BIS—Advanced Chimney—
BIS—AP Plumbing & HVAC—
BIS—Mmi Mechanical—
BIS—Everest Scaffolding—
BIS—Adelphi Restoration—
BIS—Adelphi Restoration—
BIS—Everest Scaffolding—
BIS—Max Sisla & Associates—
BIS—Costrotta Construction—
BIS—Mmi Mechanical—
BIS—Apllied Electric—
BIS—GJF Construction—
BIS—New Plumbing & Heating—
BIS—S & F General Contracting—
Nothing on file for this building.
Nothing on file for this building.
164 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account