← Back
BuildNYC
Two family converted from one family
1610 PARKER STREET
BRONX · BIN 2042025
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R5AZoning
1,484 sfGross Floor Area
2Units
Two family converted from one family · 2,375 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect110/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854110/05/2026
Building Lifecycle
10/26/2026
Objection resolved — Resolved
10/22/2026
Objection raised — Other
10/05/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01469676-I1
10/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
2 projects · most recent 10/05/2026
FiledStatusContractorScope
10/05/2026Permit IssuedSolar Electric Contractng—
10/05/2026Permit IssuedSolar Electric Contractng—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/05/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
10/05/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
10/05/2026Energy Code Compliance InspectionsTOM PETERSENprogress
10/05/2026FinalTOM PETERSENprogress
10/05/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account