Elevator apt, semi-fireproof without stores
Soundview (NYCHA)
1610 RANDALL AVENUE · Soundview-Clason Point · BIN 2092608
💬 Discuss this project
1954Year Built
7Stories
D1Building Class
R6Zoning
395,500 sfGross Floor Area
484Units
LL97 CoveredRent Stabilized26 Open Violations ▸FISP: UNSAFE
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 519,774 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 4 docs
CellarUnder Construction31p · 1 filing · 16 docs
BasementUnder Construction2p · 2 filings · 12 docs
Sub-BasementUnder Construction8p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2209/01/2026
NYCHA1603/22/2026
NYCHA 04103/22/2026
NYCHA 99403/22/2026
NYC HOUSING AUTHORITY403/22/2026
NAVTECH CONSTRUCTION CORP103/21/2026
LILLY CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HOWARD I. SHAPIRO & ASSOCIATES, P.C304/01/2026
SUPERSTRUCTURES ENG. + ARCH.210/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH203/21/2026
HOWARD I SHAPIRO ASSOCIATES403/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIA GENERAL CONTRUCTION IGeneral Contractor609/01/2026
ALLY HAZRATElectrical103/21/2026
HAZRAT ALLYElectrical103/21/2026
TRU-VAL ELECTRIC CORP.Electrical103/22/2026
WDF INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983504/01/2026
AK CONSULTING SERVICES, I6198107/11/2024
Building Lifecycle
All (102)Filed (6)Permit Issued (8)Facade (FISP) (13)Violation (47)Inspection (3)Special Inspection (25)
08/31/2026
Permit issued — Structural
X01300804-I1-GC-CX
08/31/2026
Permit issued — General Construction
X01069159-I1-GC-CX
08/31/2026
Permit issued — Structural
X01300804-S1-ST
04/06/2026
Permit issued — General Construction
X01300804-I1-GC-CX
04/01/2026
Filed — Alteration
BUILDING #10: PARTIAL DEMOLITION USING HAND-HELD EQUIPMENT AS PER PLANS.
X01300804-P1
03/26/2026
Special inspection requirement — Final
James Scheld
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
02/20/2026
Permit issued — General Construction
X01069159-I1-GC-CX
02/05/2026
Permit issued — Structural
X01300804-S1-ST
01/02/2026
Filed — Alteration
BUILDING #10: PARTIAL DEMOLITION USING HAND-HELD EQUIPMENT AS PER PLANS.
X01300804-S1
01/02/2026
Filed — Alteration
BUILDING #10: PARTIAL DEMOLITION USING HAND-HELD EQUIPMENT AS PER PLANS.
X01300804-I1
12/03/2025
Special inspection requirement — Final
James Scheld
12/03/2025
Special inspection requirement — Structural Steel - Welding
ALEXIS SCHLESSINGERMAN
12/03/2025
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
12/03/2025
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
12/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
09/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2025
Cycle 10 facade report submitted
04/13/2025
Cycle 10 facade report signed — UNSAFE
04/09/2025
Cycle 10 facade inspection completed
10/22/2024
Filed — Alteration
Soundview Bldg 10, Remove & Replace existing slab-on-grade, interior non load bearing CMU partition walls and spalled/cracked CMU block. Coat concrete walls, floors and ceilings. Patch/repair conc. columns, foundation wall & ceiling spalls & cracks.
X01069159-I1
07/17/2024
Permit issued — Suspended Scaffold
X01079708-I1-SC
07/11/2024
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 1704 RANDALL AVENUE, BRONX, NY 10473 FOR EXTERIOR FACADE INSPECTION.
X01079708-I1
06/19/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
06/19/2024
Special inspection requirement — Concrete - Cast-In-Place
ALEXIS SCHLESSINGERMAN
06/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
06/19/2024
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
06/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
06/19/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ALEXIS SCHLESSINGERMAN
06/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
06/19/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/09/2024
Permit issued — Structural
X01030249-I1-GC-CX
04/04/2024
Filed — Alteration
X01030249-I1
04/03/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/03/2024
Special inspection requirement — Structural Steel - Welding
ALEXIS SCHLESSINGERMAN
04/03/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ALEXIS SCHLESSINGERMAN
04/03/2024
Special inspection requirement — Structural Steel - Details
ALEXIS SCHLESSINGERMAN
04/03/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
04/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
12/02/2022
Violation issued (ECB, closed)
Local Law
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/19/2019
Cycle 8 facade report signed — UNSAFE
11/18/2019
Cycle 8 facade report submitted
10/31/2019
Cycle 8 facade inspection completed
10/24/2018
Violation issued (HPD, closed)
I
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/18/2018
Violation issued (ECB, closed)
Local Law
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/06/2017
Violation issued (HPD, closed)
I
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/23/2016
Violation issued (HPD, closed)
I
10/16/2015
Violation issued (HPD, closed)
I
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedDIA GENERAL CONTRUCTION I08/31/2026
DOB NOWGeneral ConstructionPermit IssuedDIA GENERAL CONTRUCTION I08/31/2026
DOB NOWStructuralPermit IssuedDIA GENERAL CONTRUCTION I08/31/2026
DOB NOWGeneral ConstructionPermit IssuedDIA GENERAL CONTRUCTION I04/06/2026
DOB NOWGeneral ConstructionPermit IssuedDIA GENERAL CONTRUCTION I02/20/2026
DOB NOWStructuralPermit IssuedDIA GENERAL CONTRUCTION I02/05/2026
DOB NOWSuspended ScaffoldPermit IssuedWALL CONTRACTOR CORP07/17/2024
DOB NOWStructuralPermit IssuedWDF INC05/09/2024
BISOTISSUEDMARIC MECHANICAL INC01/17/2023
BISOTISSUEDMARIC MECHANICAL INC01/17/2023
BISMHISSUEDMARIC MECHANICAL INC01/17/2023
BISPLISSUEDFJP MECHANICAL INC08/04/2022
BISOTISSUEDMARIC MECHANICAL INC03/21/2022
BISOTISSUEDMARIC MECHANICAL INC03/21/2022
BISMHISSUEDMARIC MECHANICAL INC03/21/2022
BISPLISSUEDFJP MECHANICAL INC08/23/2021
BISMHISSUEDMARIC MECHANICAL INC08/20/2021
BISOTISSUEDMARIC MECHANICAL INC08/18/2021
BISOTISSUEDMARIC MECHANICAL INC08/18/2021
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/30/2011
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/30/2011
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/30/2011
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/30/2011
BISEQISSUEDWHITESTONE CONSTRUCTION CORP01/13/2011
BISOTISSUEDWHITESTONE CONSTRUCTION CORP01/11/2011
BISEQISSUEDWHITESTONE CONSTRUCTION CORP04/09/2010
BISEQISSUEDWHITESTONE CONSTRUCTION CORP04/07/2010
BISEQISSUEDPIONEER GENERAL CONSTRUCT03/02/2007
BISEQISSUEDLILLY CONSTRUCTION03/26/2004
BISOTISSUEDMEGA CONTRACTING11/18/1999
BISOTISSUEDMEGA CONTRACTING11/02/1998
BISOTISSUEDMEGA CONTRACTING11/02/1998
BISOTISSUEDMEGA CONTRACTING10/28/1998
BISOTISSUEDMEGA CONTRACTING10/28/1998
5 projects · most recent 02/08/2026
General Wiring
FiledStatusContractorScope
02/08/2026Permit IssuedSEZEKCOL ELECTRIC INCGeneral Wiring
06/05/2021Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
06/05/2021Permit IssuedN.Y.C. HOUSING AUTHORITYGeneral Wiring
03/09/2021CompleteTRU-VAL ELECTRIC CORP.General Wiring
12/13/2018Permit IssuedEIA ELECTRIC, INCGeneral Wiring
2 projects · most recent 04/01/2026
Concrete
FiledStatusContractorScope
04/01/2026Permit IssuedDIA GENERAL CONTRUCTION I5 scope_items
10/22/2024Permit IssuedDIA GENERAL CONTRUCTION IConcrete
1 project · most recent 07/11/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/11/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/26/2026FinalJames Scheldprogress
03/26/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
03/26/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
12/03/2025FinalJames Scheldprogress
12/03/2025Structural Steel - WeldingALEXIS SCHLESSINGERMANspecial
12/03/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
12/03/2025MasonryALEXIS SCHLESSINGERMANspecial
12/03/2025Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
12/03/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/19/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
06/19/2024Concrete - Cast-In-PlaceALEXIS SCHLESSINGERMANspecial
06/19/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/19/2024MasonryALEXIS SCHLESSINGERMANspecial
06/19/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
06/19/2024Subsurface Conditions – Fill Placement & In-Place DensityALEXIS SCHLESSINGERMANspecial
06/19/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/19/2024Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
06/19/2024FinalALEXIS SCHLESSINGERMANprogress
04/03/2024FinalALEXIS SCHLESSINGERMANprogress
04/03/2024Structural Steel - WeldingALEXIS SCHLESSINGERMANspecial
04/03/2024Structural Steel - High Strength BoltingALEXIS SCHLESSINGERMANspecial
04/03/2024Structural Steel - DetailsALEXIS SCHLESSINGERMANspecial
04/03/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
04/03/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/03/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
▾Documents — 168 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026X01030249-I1Request digital key ↗
08/21/2026X01079708-I1Request digital key ↗
08/20/2026X01069159-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION14
08/18/2023220709151Open ↗
08/16/2023220709151Open ↗
01/09/2023220709151Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION14
08/23/2021220709151Open ↗
08/20/2021220709151Open ↗
08/18/2021220709151Open ↗
Showing 3 of 14 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
09/07/2013220055730Open ↗
04/17/2012220055455Open ↗
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/23/2012220047697Open ↗
03/08/2012220099328Open ↗
01/13/2011220099328Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/13/2011220099328Open ↗
04/09/2010220055730Open ↗
04/08/2010220055455Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
01/13/2011220099328Open ↗
04/09/2010220055730Open ↗
04/08/2010220055455Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026X01300804-I1Open ↗
08/17/2026X01300804-P1Open ↗
08/17/2026X01300804-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026X01300804-P1Open ↗
09/01/2026X01030249-I1Open ↗
08/26/2026X01069159-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X01300804-P1Open ↗
09/01/2026X01030249-I1Open ↗
08/26/2026X01069159-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING4
08/18/2023220709151Open ↗
08/16/2023220709151Open ↗
01/09/2023220709151Open ↗
Showing 3 of 4 on file for this type
▸BISHEATING SYSTEMS1
12/04/2024220709151Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/04/2024220709151Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/04/2024220709151Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
07/30/2021220709151Open ↗
▸Environmental & Asbestos26
▸BISDEP ASBESTOS PROJECT COMPLETION FORM15
09/04/2014220047697Open ↗
09/04/2014220047697Open ↗
09/04/2014220047697Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026X01300804-S1Open ↗
08/17/2026X01300804-I1Open ↗
08/17/2026X01300804-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
04/09/2010220055730Open ↗
04/08/2010220055455Open ↗
06/20/2008210055704Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
01/12/2011220047697Open ↗
08/18/2021220709151Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/13/2011220099328Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/12/2021220709151Open ↗
07/30/2021220709151Open ↗
07/30/2021220709151Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/04/2024220709151Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/04/2024220709151Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/12/2021220709151Open ↗
08/12/2021220709151Open ↗
08/12/2021220709151Open ↗
Showing 3 of 6 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/04/2024220709151Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/04/2024220709151Open ↗
▸BISMECHANICAL SYSTEMS1
12/04/2024220709151Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
12/04/2024220709151Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/04/2024220709151Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/04/2024220709151Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/04/2024220709151Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/06/2024220709151Open ↗
09/04/2014220047697Open ↗
06/30/2014220047697Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026X01300804-P1Open ↗
08/13/2026X01300804-S1Open ↗
08/13/2026X01300804-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
01/13/2011220099328Open ↗
04/09/2010220055730Open ↗
04/08/2010220055455Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/08/2023220709151Open ↗
03/23/2012220047697Open ↗
▸BISFINAL1
12/04/2024220709151Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
06/28/2019220709151Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
12/04/2024220709151Open ↗
12/04/2024220709151Open ↗
07/30/2021220709151Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/04/2024220709151Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET8
06/28/2019220709151Open ↗
06/28/2019220709151Open ↗
06/28/2019220709151Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
09/08/2023220709151Open ↗
02/10/2023220709151Open ↗
08/11/2021220709151Open ↗
Showing 3 of 5 on file for this type
▸Other Documents5
▸BISPRELIMINARY1
12/04/2024220709151Open ↗
▸BISMAINTENANCE INFORMATION1
12/04/2024220709151Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/04/2024220709151Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01079708-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01079708-I1Open ↗