← Back
Two stories - detached, small or mid-size
1613 GLOVER STREET
BRONX · BIN 2041982
💬 Discuss this project
1910Year Built
2.75Stories
A1Building Class
R5AZoning
1,723 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,560 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2021$670K—Private party → Private party$389/sf building
11/07/2019$490K—— → —$284/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRAME DESIGN CORPS105/13/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRAME DESIGN AND CONSTRUC7971105/13/2026
Building Lifecycle
All (30)Filed (1)Objection (26)Special Inspection (3)
07/16/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Scope
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Fire_Protection
06/01/2026
Objection raised — Energy
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Zoning
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Fire_Protection
06/01/2026
Objection raised — Structural
06/01/2026
Objection raised — Other
06/01/2026
Objection raised — Other
05/13/2026
Filed — Alteration
HORIZONTAL EXTENSION AT REAR YARD AND OTHER REPAIR WORK(CELLAR,1ST AND 2ND FLOOR) AS PER PLAN. EXISTING TWO-FAMILY DWELLING TO REMAIN WITH NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01393873-I1
05/06/2026
Special inspection requirement — Wood – Seismic Resistance
SURESH WARREN
04/28/2026
Special inspection requirement — Final
SURESH WARREN
04/28/2026
Special inspection requirement — Footing and Foundation
SURESH WARREN
Nothing on file for this building.
1 project · most recent 05/13/2026
Concrete Wood
FiledStatusContractorScope
05/13/2026——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/06/2026Wood – Seismic ResistanceSURESH WARRENspecial
04/28/2026FinalSURESH WARRENprogress
04/28/2026Footing and FoundationSURESH WARRENprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026X01393873-I1Request digital key ↗
08/14/2026X01393873-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026X01393873-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01393873-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026X01393873-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/26/2026X01393873-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026X01393873-I1Open ↗
▸DOB NOWPlot Diagram1
08/14/2026X01393873-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026X01393873-I1Open ↗