← Back
Zoned residential, not Manhattan
1616 HARDING PARK
BRONX · BIN 2130942
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3AZoning
0 sfGross Floor Area
0Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Zoned residential, not Manhattan · Owner of record: UNITED QUINCY LLC · 2,884 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof2p · 1 filing · 7 docs
Cellar1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/06/2024$140K—Private party → UNITED QUINCY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.208/24/2026
Building Lifecycle
All (39)Filed (2)Objection (9)Special Inspection (28)
08/24/2026
Filed — New Building
X01291431-S3
03/12/2026
Objection raised — Other
03/09/2026
Objection raised — Energy
03/09/2026
Objection raised — Other
03/09/2026
Objection raised — Other
03/09/2026
Objection raised — Scope
03/09/2026
Objection raised — Other
03/09/2026
Objection raised — Other
03/09/2026
Objection raised — Other
03/09/2026
Objection raised — Structural
02/25/2026
Filed — New Building
X01291431-I1
09/22/2025
Special inspection requirement — Mechanical Systems
09/22/2025
Special inspection requirement — Concrete - Cast-In-Place
09/22/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/22/2025
Special inspection requirement — Heating Systems
09/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
09/22/2025
Special inspection requirement — Final
09/22/2025
Special inspection requirement — Footing and Foundation
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
09/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/22/2025
Special inspection requirement — Preliminary
09/22/2025
Special inspection requirement — Structural Wood Frame
09/22/2025
Special inspection requirement — Air barrier — testing
09/22/2025
Special inspection requirement — Fenestration air leakage
09/22/2025
Special inspection requirement — Maintenance information
09/22/2025
Special inspection requirement — Air barrier - visual inspection
09/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
09/22/2025
Special inspection requirement — Metering
09/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
09/22/2025
Special inspection requirement — Fenestration areas
09/22/2025
Special inspection requirement — Permanent certificate
09/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/22/2025
Special inspection requirement — Ventilation and air distribution system
09/22/2025
Special inspection requirement — Electric vehicle service equipment requirements
09/22/2025
Special inspection requirement — Interior lighting power
09/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/22/2025
Special inspection requirement — Insulation placement and R values
Nothing on file for this building.
1 project · most recent 08/24/2026
Fence
FiledStatusContractorScope
08/24/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/22/2025Mechanical Systems—special
09/22/2025Concrete - Cast-In-Place—special
09/22/2025Excavations - Sheeting, Shoring, and Bracing—special
09/22/2025Fire-Resistant Penetrations and Joints—special
09/22/2025Heating Systems—special
09/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/22/2025Final—progress
09/22/2025Footing and Foundation—progress
09/22/2025Energy Code Compliance Inspections—progress
09/22/2025Fire-Resistance Rated Construction—progress
09/22/2025Preliminary—progress
09/22/2025Structural Wood Frame—progress
09/22/2025Air barrier — testing —energy_progress
09/22/2025Fenestration air leakage—energy_progress
09/22/2025Maintenance information—energy_progress
09/22/2025Air barrier - visual inspection—energy_progress
09/22/2025HVAC-R and service water heating system controls—energy_progress
09/22/2025Fenestration and door U-factor and product ratings—energy_progress
09/22/2025Metering—energy_progress
09/22/2025Duct leakage testing, insulation and design—energy_progress
09/22/2025Fenestration areas—energy_progress
09/22/2025Permanent certificate—energy_progress
09/22/2025HVAC-R and service water heating equipment—energy_progress
09/22/2025Ventilation and air distribution system—energy_progress
09/22/2025Electric vehicle service equipment requirements—energy_progress
Latest 25 of 28.
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026X01291431-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026X01291431-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01291431-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026X01291431-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026X01291431-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026X01291431-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026X01291431-I1Open ↗