← Back
Two family frame
1617 AVENUE V
BROOKLYN · BIN 3199631
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R5Zoning
2,400 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Cellar6p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2025$1.2M—— → —$495/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP311/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371111/20/2025
NIC DESIGN INC9758203/21/2025
Building Lifecycle
All (24)Filed (3)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (14)
12/11/2025
Signed off — Alteration
REPLACED PLUMBING FIXTURES IN THE CELLAR, 1ST FL. AND 2ND FL. OF EXISTING 2 STORY BUILDING. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01195260-S1
12/11/2025
Signed off — Alteration
REPLACED PLUMBING FIXTURES IN THE CELLAR, 1ST FL. AND 2ND FL. OF EXISTING 2 STORY BUILDING. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01195260-I1
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
11/20/2025
Filed — Alteration
REPLACED PLUMBING FIXTURES IN THE CELLAR, 1ST FL. AND 2ND FL. OF EXISTING 2 STORY BUILDING. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01195260-P1
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/27/2025
Permit issued — Plumbing
B01195260-S1-PL
03/21/2025
Filed — Alteration
REPLACED PLUMBING FIXTURES IN THE CELLAR, 1ST FL. AND 2ND FL. OF EXISTING 2 STORY BUILDING. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01195260-S1
03/19/2025
Permit issued — Mechanical Systems
B01195260-I1-GC-CX
03/18/2025
Filed — Alteration
REPLACED PLUMBING FIXTURES IN THE CELLAR, 1ST FL. AND 2ND FL. OF EXISTING 2 STORY BUILDING. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01195260-I1
03/18/2025
Special inspection requirement — Maintenance information
Eric Sun
03/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
03/18/2025
Special inspection requirement — Interior lighting power
Eric Sun
03/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
03/18/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
03/18/2025
Special inspection requirement — Fenestration areas
Eric Sun
03/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
03/18/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
03/18/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
03/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
03/14/2025
Special inspection requirement — Final
Eric Sun
03/14/2025
Special inspection requirement — Mechanical Systems
Eric Sun
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/27/2025
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY03/19/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
11/21/2025Fire-Resistant Penetrations and JointsEric Sunspecial
11/20/2025Fire-Resistant Penetrations and JointsEric Sunspecial
03/18/2025Maintenance informationEric Sunenergy_progress
03/18/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
03/18/2025Interior lighting powerEric Sunenergy_progress
03/18/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
03/18/2025Air barrier - visual inspectionEric Sunenergy_progress
03/18/2025Fenestration areasEric Sunenergy_progress
03/18/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
03/18/2025Fenestration air leakageEric Sunenergy_progress
03/18/2025Insulation placement and R valuesEric Sunenergy_progress
03/18/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
03/14/2025FinalEric Sunprogress
03/14/2025Mechanical SystemsEric Sunspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026B01195260-I1Request digital key ↗
08/19/2026B01195260-S1Request digital key ↗
08/19/2026B01195260-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B01195260-S1Open ↗
08/13/2026B01195260-P1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026B01195260-I1Open ↗
08/19/2026B01195260-S1Open ↗
08/19/2026B01195260-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B01195260-P1Open ↗
08/25/2026B01195260-I1Open ↗
08/24/2026B01195260-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01195260-I1Open ↗
08/25/2026B01195260-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026B01195260-S1Open ↗
08/19/2026B01195260-I1Open ↗
08/19/2026B01195260-P1Open ↗