HPD08/29/2024§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30 SQ. FT. AT THE CEILINGS AND NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD08/29/2024§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AND NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD08/29/2024§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD08/16/2024§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD08/16/2024§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT EAST WALL AND CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17199279 ISSUED 16-AUG-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
HPD09/05/2007§ 27-2142 ADM CODE - THE PREMISES OR APTS. HAVE BEEN VACATED BY THE DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR BASEMENT REAR
HPD08/19/2007§ 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS ... IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM WEST AT NORTH , SECTION ''REAR BLDG'', AT WEST
HPD08/19/2007§ 9, 56, 193, 300, 302 M.D. LAW- ABOVE FRAME BUILDING HAS BEEN CONVERTED FROM A PRIVATE DWELLING TO A MULTIPLE DWELLING AND IS NOW OCCUPIED AND MAINTAINED AS SUCH CONTRARY TO LAW.RESTORE PREMISES TO LAWFUL OCCUPANCY IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM WEST AT NORTH , SECTION ''REAR BLDG'', AT WEST
HPD08/19/2007§ 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE ... IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM WEST AT NORTH , SECTION ''REAR BLDG'', AT WEST
HPD04/05/2007§ 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE ... IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST
HPD04/05/2007§ 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS ... IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT BSMT, 1st BSMT-APT FROM SOUTH AT WEST
HPD09/14/2006§ 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE AT BASEMENT APT IN THE REAR BUILDING
HPD09/14/2006§ 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS AT BASEMENT APT IN THE REAR BUILDING
HPD09/14/2006§ 9, 56, 193, 300, 302 M.D. LAW- ABOVE FRAME BUILDING HAS BEEN CONVERTED FROM A PRIVATE DWELLING TO A MULTIPLE DWELLING AND IS NOW OCCUPIED AND MAINTAINED AS SUCH CONTRARY TO LAW.RESTORE PREMISES TO LAWFUL OCCUPANCY
ECB10/01/2007OCCUPANCY CONTRARY TO THAT ALLOWED BY HPD &/OR BLDG DEPT RECORDS.BASEMENT CONVERTED FROM ORDINARY USE INTO A CLASS 'A' APT.W/ FULL KITCHEN &BATHROOM.THEREBY INCREASING BLDG OCCUPANCY @ REAR BLDG.REMEDY RESTORENothing owed — awaiting certificate of correction
ECB05/17/2007OCCUPANCY CONTRARY TO THAT ALLOWED BY HPD &/OR BLDG DEPT RECORDS,BASEMENT CONVERTED FROM ORDINARY USE INTO A CLASS A APT WITH FULL KITCHEN AND BATHROOM AREA,THEREBY INCREASING BLDG OCCUPANCY.AT REAR BLDGNothing owed — awaiting certificate of correction
ECB10/16/2006OCCUPANCY CONTRARY TO THAT ALLOWANCE BY H.P.D &/OR BLDG DEPT RECORDS BASEMENT CONVERTED FROM ORDINARY USE INTO CLASS "A" APT W/ FULL BATHROOM & KITCHEN AREA,THEREBY INCREASING BLDG OCCUPANCY. AT REAR BLDG.Nothing owed — awaiting certificate of correction
ECB12/29/1995OCCUPANCY CONTRARY TO THAT ALLOWED BY C OF O OR BUILDING DEPT RECORDS CELLAR CONVERTED FROM ORDINARY USE TO CLASS "A" APARTMENT, PARTITIONS ERECTED WITH KITCHEN AND BATHROOMNothing owed — awaiting certificate of correction