162-01 POWELLS COVE BOULEVARD · BIN 4103992
💬 Discuss this project
1956Year Built
6Stories
D4Building Class
R4Zoning
150,000 sfGross Floor Area
108Units
LL97 CoveredRent Stabilized17 Active Violations 15 unresolved · 2 paperwork only 2 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: Cryder Point Owners · 139,515 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarCryder Point Owners CORP.5p · 1 filing · 8 docs
Site & exteriorCryder Point Owners CORP.4p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cryder Point Owners4307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Merritt Engineering Consultants211/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Merritt Engineering Consultant403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJD Electrical Service & InstallationElectrical203/21/2026
Jubilee Electrical Service CoElectrical103/21/2026
Century Electric CoElectrical103/22/2026
MLS ElectricElectrical103/22/2026
Bay Restorationspecialty_contractor107/08/2026
Gurnoor ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Merritt Engineering Consulting460211/06/2025
Momentum Design Consultan9893111/06/2025
Dean Mendez Architect, P8621105/24/2023
Building Lifecycle
All (99)Filed (2)Permit Issued (2)Signed Off (2)Facade (FISP) (15)Violation (60)Objection (6)Special Inspection (12)
09/23/2026
Signed off — Alteration
GARAGE RESTORATION INCLUDING CONCRETE PATCHING, MASONRY REPLACEMENT, CONCRETE CRACK REPAIRS, CONCRETE BEAM ENCASEMENT REPAIRS, SEALANT, REPLACEMENT AND STEEL SCRAPE, PRIME, AND PAINT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01275094-I1
06/30/2026
Cycle 10 facade report signed — SWARMP
06/28/2026
Violation issued (HPD, open)
A
06/28/2026
Violation issued (HPD, open)
A
06/28/2026
Violation issued (HPD, open)
A
06/10/2026
Cycle 10 facade inspection completed
04/29/2026
Permit issued — General Construction
Q01275094-I1-GC
04/17/2026
Cycle 10 facade report submitted
03/14/2026
Violation issued (HPD, open)
A
03/14/2026
Violation issued (HPD, open)
A
12/22/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
11/24/2025
Objection raised — Structural
11/24/2025
Objection raised — Structural
11/24/2025
Objection raised — Structural
11/06/2025
Filed — Alteration
GARAGE RESTORATION INCLUDING CONCRETE PATCHING, MASONRY REPLACEMENT, CONCRETE CRACK REPAIRS, CONCRETE BEAM ENCASEMENT REPAIRS, SEALANT, REPLACEMENT AND STEEL SCRAPE, PRIME, AND PAINT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01275094-I1
11/05/2025
Violation issued (HPD, closed)
C
08/28/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Mohammed Baban
08/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
08/20/2025
Special inspection requirement — Masonry
Christopher Krepcio
08/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Mohammed Baban
08/20/2025
Special inspection requirement — Final
Christopher Krepcio
03/17/2025
Violation issued (HPD, closed)
C
03/17/2025
Violation issued (HPD, closed)
C
03/08/2025
Violation issued (HPD, open)
C
03/08/2025
Violation issued (HPD, closed)
C
03/01/2025
Violation issued (HPD, open)
C
01/28/2025
Violation issued (HPD, closed)
B
01/28/2025
Violation issued (HPD, closed)
B
01/14/2025
Violation issued (HPD, open)
B
01/14/2025
Violation issued (HPD, closed)
A
01/14/2025
Violation issued (HPD, closed)
C
01/14/2025
Violation issued (HPD, closed)
A
01/14/2025
Violation issued (HPD, closed)
C
10/28/2024
Violation issued (HPD, open)
A
10/28/2024
Violation issued (HPD, open)
A
10/28/2024
Violation issued (HPD, open)
A
10/28/2024
Violation issued (HPD, open)
A
10/28/2024
Violation issued (HPD, open)
A
10/28/2024
Violation issued (HPD, closed)
C
10/28/2024
Violation issued (HPD, open)
C
12/01/2023
Signed off — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00854118-I1
09/15/2023
Permit issued — General Construction
Q00854118-I1-GC
05/24/2023
Filed — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00854118-I1
04/03/2023
Special inspection requirement — Masonry
Christopher Krepcio
04/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
04/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
04/03/2023
Special inspection requirement — Final
Christopher Krepcio
04/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Christopher Krepcio
04/03/2023
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
04/03/2023
Special inspection requirement — Fenestration air leakage
Christopher Krepcio
05/04/2022
Cycle 9 facade report signed — SWARMP
02/14/2022
Cycle 9 facade report submitted
02/08/2022
Cycle 9 facade inspection completed
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGurnoor Construction04/29/2026
DOB NOWGeneral ConstructionSigned-offBay Restoration09/15/2023
BISOTISSUEDRight Angle Design & .Building01/05/2017
BISEQISSUEDRight Angle Design & .Building01/05/2017
BISOTISSUEDRight Angle Design & .Building12/09/2016
BISPLISSUEDPal-Mar Plumbing & Heating11/03/2016
BISOTISSUEDRight Angle Design & .Building01/07/2016
BISEQISSUEDRight Angle Design & .Building01/07/2016
BISPLISSUEDPal-Mar Plumbing & Heating06/09/2015
BISOTISSUEDXinos Construction04/22/2015
BISEQISSUEDXinos Construction04/03/2015
BISEQISSUEDXinos Construction01/28/2015
BISOTISSUEDRight Angle Design & .Building01/20/2015
BISEQISSUEDRight Angle Design & .Building01/20/2015
BISOTISSUED1 Hour Chimney NY09/06/2013
BISOTISSUED1 Hour Chimney NY07/15/2013
BISFBISSUEDEfficient Comb & Cooling Co07/08/2013
BISPLISSUEDG.bassolino Plumbing07/08/2013
BISOTISSUEDSK One Construction05/20/2011
BISOTISSUEDC.I. Contracting07/06/2010
BISEQISSUEDEverest Scaffolding06/16/2010
BISOTISSUEDC.I. Contracting06/04/2010
BISEQISSUEDRock Scaffolding04/16/2010
BISEQISSUEDRock Scaffolding04/06/2010
BISOTISSUEDTriboro Contracting & Rem03/19/2010
BIS—ISSUEDTriboro Contracting & Rem06/10/2009
BISOTISSUEDTriboro Contracting & Rem02/25/2009
BISOTISSUEDVema Contracting11/27/2007
BISOTISSUEDTriboro Contracting & Rem10/23/2007
BIS—ISSUEDCryder Point Owner's Associates06/11/1997
BISOTISSUEDArmored11/02/1995
3 projects · most recent 03/15/2021
General Wiring
FiledStatusContractorScope
03/15/2021CompleteMLS ElectricGeneral Wiring
07/09/2020CompleteCentury ElectricGeneral Wiring
02/01/2018CompleteQec Electrical SvceGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/28/2025Construction Operations Influencing Adjacent StructuresMohammed Babanspecial
08/20/2025Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
08/20/2025MasonryChristopher Krepciospecial
08/20/2025Tenant Protection Plan ComplianceMohammed Babanspecial
08/20/2025FinalChristopher Krepcioprogress
04/03/2023MasonryChristopher Krepciospecial
04/03/2023Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
04/03/2023Tenant Protection Plan ComplianceDean Mendezspecial
04/03/2023FinalChristopher Krepcioprogress
04/03/2023Energy Code Compliance InspectionsChristopher Krepcioprogress
04/03/2023Air barrier - visual inspectionChristopher Krepcioenergy_progress
04/03/2023Fenestration air leakageChristopher Krepcioenergy_progress
▾Documents — 216 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026Q00854118-I1Request digital key ↗
08/18/2026Q01275094-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION24
08/24/2017420817851Open ↗
01/13/2017440194406Open ↗
04/25/2016420865898Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION22
01/17/2017440194406Open ↗
12/12/2016440194406Open ↗
01/11/2016440194406Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY APPLICATION1
10/21/2009410145551Open ↗
▸Seals & Professional Certifications60
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
12/13/2017440197154Open ↗
10/26/2017440207884Open ↗
09/12/2017440194406Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
04/25/2016420865898Open ↗
07/12/2013420865898Open ↗
05/23/2011420358446Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
07/12/2013420865898Open ↗
05/23/2011420358446Open ↗
06/17/2010420202426Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026Q01275094-I1Open ↗
08/28/2026Q01275094-I1Open ↗
08/28/2026Q01275094-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q01275094-I1Open ↗
08/23/2026Q00854118-I1Open ↗
08/23/2026Q00854118-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/25/2016420865898Open ↗
04/02/2015440207884Open ↗
01/21/2015440197154Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/02/2015440207884Open ↗
01/21/2015440197154Open ↗
01/05/2015440194406Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/02/2015440207884Open ↗
01/21/2015440197154Open ↗
01/05/2015440194406Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026Q00854118-I1Open ↗
08/18/2026Q01275094-I1Open ↗
▸BISPC FULL REPORT1
10/19/2007410019091Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/15/2013420865898Open ↗
07/12/2013420865898Open ↗
▸BISSCHEDULE B - PLUMBING2
01/05/2015440194406Open ↗
07/11/2013420865898Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
11/07/2013420865898Open ↗
08/23/2013420865898Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
11/07/2013420865898Open ↗
▸Safety & Tenant Protection3
▸BISST-1 Street Tree Checklist1
05/21/2009410145551Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/04/2015420817851Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/24/2015420817851Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
04/02/2010420169677Open ↗
01/22/2009410217171Open ↗
10/08/2008410145551Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/02/2015440207884Open ↗
07/12/2013420865898Open ↗
03/07/2013420817851Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/23/2011420358446Open ↗
06/17/2010420202426Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q00854118-I1Open ↗
08/18/2026Q01275094-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY2
08/02/2011420358446Open ↗
05/23/2011420358446Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/10/2017420817851Open ↗
08/02/2011420358446Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/10/2017420817851Open ↗
04/25/2015420817851Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/02/2015440207884Open ↗
01/21/2015440197154Open ↗
01/05/2015440194406Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/06/2010410217171Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/06/2010410217171Open ↗
▸BISSOIL REPORT1
01/05/2015440194406Open ↗
▸Approvals, Objections & Sign-offs27
▸BISADMINISTRATIVE OBJECTIONS9
07/12/2013420865898Open ↗
03/07/2013420817851Open ↗
05/23/2011420358446Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/13/2017440197154Open ↗
10/26/2017440207884Open ↗
09/12/2017440194406Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/12/2017440194406Open ↗
03/10/2017420817851Open ↗
04/29/2016420865898Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
01/05/2009410145551Open ↗
10/08/2008410145551Open ↗
▸BISSUPERSEDING LETTER1
06/04/2010410217171Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT15
09/12/2017440194406Open ↗
08/24/2017420817851Open ↗
03/10/2017420817851Open ↗
Showing 3 of 15 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/29/2015420817851Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/02/2010410145551Open ↗
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET8
07/11/2013420865898Open ↗
05/31/2013420817851Open ↗
03/07/2013420817851Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
06/29/2017440194406Open ↗
05/02/2016420865898Open ↗
10/17/2013420865898Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
04/02/2015440207884Open ↗
01/21/2015440197154Open ↗
01/05/2015440194406Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
12/13/2017440197154Open ↗
10/26/2017440207884Open ↗
09/12/2017440194406Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
07/06/2010410217171Open ↗
07/06/2010410217171Open ↗
07/06/2010410217171Open ↗
Showing 3 of 4 on file for this type
▸BISGAS WELDER ANNUAL CERT : GAS-WELD2
08/23/2013420865898Open ↗
08/23/2013420865898Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/21/2015440197154Open ↗
▸BISPlot Diagram1
10/08/2008410145551Open ↗