162-03 LABURNUM AVENUE
QUEENS · East Flushing · BIN 4123942
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R4-1Zoning
2,040 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family frame · Owner of record: CHICO ENTERPRISE LLC · 3,420 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHICO ENTERPRISE LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/21/2023$1.1M—— → —$524/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN105/27/2026
ASHOKE CHAKRABORTY RA502/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KATARIA BUILDERS803/21/2026
KATARIA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALTO ELECTRIC INCElectrical103/22/2026
FK CONSTRUCTION INCGeneral Contractor104/09/2026
MJ GENERAL MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854105/27/2026
EDWARD C. HICKS RA1403402/11/2025
KOJO SIMPSON ARCHITECT1664110/17/2024
Building Lifecycle
All (63)Filed (6)Permit Issued (3)Signed Off (1)Violation (4)Inspection (4)Objection (22)Special Inspection (23)
06/01/2026
Permit issued — Solar
Q01408180-I1-SL
05/27/2026
Filed — Alteration
Q01408180-I1
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
05/27/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
05/27/2026
Special inspection requirement — Final
TOM PETERSEN
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
02/06/2026
Signed off — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW 3 PC BATHROOM IN THE CELLAR. NEW WASHER AND ELEC. DRYER IN THE CELLAR. NEW BOILER IN THE CELLAR. RELOCATE PLUMBING FIXTURES IN THE BATHROOM ON THE FIRST FLOOR WITH NEW WASHER/ ELEC. DRYER COMBO ON THE 1 FL.
Q01127335-I1
12/10/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KOJO SIMPSON
02/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ASHOKE CHAKRABORTY
02/14/2025
Special inspection requirement — Energy Code Compliance Inspections
ASHOKE CHAKRABORTY
02/11/2025
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW 3 PC BATHROOM IN THE CELLAR. NEW WASHER AND ELEC. DRYER IN THE CELLAR. NEW BOILER IN THE CELLAR. RELOCATE PLUMBING FIXTURES IN THE BATHROOM ON THE FIRST FLOOR WITH NEW WASHER/ ELEC. DRYER COMBO ON THE 1 FL.
Q01127335-P3
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD HICKS
02/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWARD HICKS
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
EDWARD HICKS
02/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2025
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW 3 PC BATHROOM IN THE CELLAR. NEW WASHER AND ELEC. DRYER IN THE CELLAR. NEW BOILER IN THE CELLAR. RELOCATE PLUMBING FIXTURES IN THE BATHROOM ON THE FIRST FLOOR WITH NEW WASHER/ ELEC. DRYER COMBO ON THE 1 FL.
Q01127335-P2
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/03/2024
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW 3 PC BATHROOM IN THE CELLAR. NEW WASHER AND ELEC. DRYER IN THE CELLAR. NEW BOILER IN THE CELLAR. RELOCATE PLUMBING FIXTURES IN THE BATHROOM ON THE FIRST FLOOR WITH NEW WASHER/ ELEC. DRYER COMBO ON THE 1 FL.
Q01127335-P1
11/20/2024
Permit issued — Plumbing
Q01127335-I1-PL
11/04/2024
Objection resolved — Addressed
11/04/2024
Objection resolved — Addressed
11/04/2024
Objection resolved — Addressed
10/29/2024
Objection raised — Mechanical
10/29/2024
Objection raised — Scope
10/29/2024
Objection raised — Inspections
10/17/2024
Filed — Alteration
FILING HEREWITH PLANS AND APPLICATION FOR NEW 3 PC BATHROOM IN THE CELLAR. NEW WASHER AND ELEC. DRYER IN THE CELLAR. NEW BOILER IN THE CELLAR. RELOCATE PLUMBING FIXTURES IN THE BATHROOM ON THE FIRST FLOOR WITH NEW WASHER/ ELEC. DRYER COMBO ON THE 1 FL.
Q01127335-I1
10/17/2024
Permit issued — General Construction
Q01068363-I1-GC
10/03/2024
Objection resolved — Addressed
10/03/2024
Objection resolved — Addressed
10/03/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection resolved — Addressed
07/30/2024
Special inspection requirement — Masonry
EDWARD HICKS
07/04/2024
Objection raised — Other
07/04/2024
Objection raised — Scope
07/04/2024
Objection raised — Fire_Protection
07/04/2024
Objection raised — Inspections
07/04/2024
Objection raised — Zoning
07/04/2024
Objection raised — Other
07/04/2024
Objection raised — Inspections
07/04/2024
Objection raised — Energy
06/20/2024
Filed — Alteration
FILING HEREWITH PLANS AND APPLIATION FOR RENOVATIONS TO EXISTING CELLAR OF THIS TWO FAMILY DWELLING. PROVIDE NEW EXTERIOR CELLAR ENTRANCE, WITH FINISHED CELLAR, ACCESSORY TO FIRST FLOOR UNIT. NO CHANGE IN USE/EGRESS OR OCCUPANCY. PLUMBING FILED SEPARATE
Q01068363-I1
06/18/2024
Special inspection requirement — Interior lighting power
EDWARD HICKS
06/18/2024
Special inspection requirement — Air barrier - visual inspection
EDWARD HICKS
06/18/2024
Special inspection requirement — Insulation placement and R values
EDWARD HICKS
06/18/2024
Special inspection requirement — Fenestration areas
EDWARD HICKS
06/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWARD HICKS
06/18/2024
Special inspection requirement — Fenestration air leakage
EDWARD HICKS
06/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
EDWARD HICKS
06/18/2024
Special inspection requirement — Energy Code Compliance Inspections
EDWARD HICKS
06/18/2024
Special inspection requirement — Final
ASHOKE CHAKRABORTY
06/18/2024
Special inspection requirement — Subgrade Inspections
EDWARD HICKS
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWARD HICKS
06/18/2024
Special inspection requirement — Concrete - Cast-In-Place
EDWARD HICKS
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTOM PETERSEN ARCHITECT, LLC06/01/2026
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC11/20/2024
DOB NOWGeneral ConstructionSigned-offFK CONSTRUCTION INC10/17/2024
3 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026CompleteVENTURE HOME SOLAR LLC—
10/28/2024Permit IssuedALTO ELECTRIC INCGeneral Wiring
03/13/2024CompleteALTO ELECTRIC INC3 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/27/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
05/27/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
05/27/2026FinalTOM PETERSENprogress
05/27/2026Energy Code Compliance InspectionsTOM PETERSENprogress
02/14/2025Fire-Resistant Penetrations and JointsKOJO SIMPSONspecial
02/14/2025HVAC-R and service water piping design and insulationASHOKE CHAKRABORTYenergy_progress
02/14/2025Energy Code Compliance InspectionsASHOKE CHAKRABORTYprogress
02/11/2025Fire-Resistant Penetrations and JointsEDWARD HICKSspecial
02/11/2025HVAC-R and service water piping design and insulationEDWARD HICKSenergy_progress
02/11/2025Energy Code Compliance InspectionsEDWARD HICKSprogress
07/30/2024MasonryEDWARD HICKSspecial
06/18/2024Interior lighting powerEDWARD HICKSenergy_progress
06/18/2024Air barrier - visual inspectionEDWARD HICKSenergy_progress
06/18/2024Insulation placement and R valuesEDWARD HICKSenergy_progress
06/18/2024Fenestration areasEDWARD HICKSenergy_progress
06/18/2024Fenestration and door U-factor and product ratingsEDWARD HICKSenergy_progress
06/18/2024Fenestration air leakageEDWARD HICKSenergy_progress
06/18/2024Fire-Resistance Rated ConstructionEDWARD HICKSprogress
06/18/2024Energy Code Compliance InspectionsEDWARD HICKSprogress
06/18/2024FinalASHOKE CHAKRABORTYprogress
06/18/2024Subgrade InspectionsEDWARD HICKSspecial
06/18/2024Fire-Resistant Penetrations and JointsEDWARD HICKSspecial
06/18/2024Concrete - Cast-In-PlaceEDWARD HICKSspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01127335-I1Request digital key ↗
08/20/2026Q01127335-P2Request digital key ↗
08/20/2026Q01127335-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
03/02/2022402306036Open ↗
02/24/2022402306036Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q01127335-P3Open ↗
08/13/2026Q01127335-I1Open ↗
08/13/2026Q01127335-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026Q01127335-I1Open ↗
09/02/2026Q01127335-I1Open ↗
09/01/2026Q01408180-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026Q01408180-I1Open ↗
08/13/2026Q01127335-I1Open ↗
08/13/2026Q01127335-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q01127335-I1Open ↗
09/01/2026Q01408180-I1Open ↗
09/01/2026Q01127335-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/16/2026Q01408180-I1Open ↗
08/13/2026Q01127335-P3Open ↗
08/13/2026Q01127335-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWWaiver Document1
08/13/2026Q01068363-I1Open ↗