Office with commercial, 7-19 stories
Gertz Plaza
162-10 JAMAICA AVENUE · Jamaica · BIN 4215623
💬 Discuss this project
1946Year Built
7Stories
O6Building Class
C6-3Zoning
471,648 sfGross Floor Area
54Units
LL97 Covered2 Open Violations ▸FISP: SAFEFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: GERTZ PLAZA ACQUISITION 2, LLC · 63,777 sf lot · 7.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Roof21p · 2 filings · 13 docs
Floor 784p · 1 filing · 20 docs
Floor 684p · 1 filing · 20 docs
Floor 584p · 1 filing · 20 docs
Floor 484p · 1 filing · 20 docs
Floor 384p · 1 filing · 20 docs
Floor 284p · 1 filing · 20 docs
Floor 1168p · 13 filings · 20 docs
Mezzanine131p · 5 filings · 20 docs
Cellar84p · 1 filing · 20 docs
Basement84p · 1 filing · 20 docs
Sub-Basement16p · 5 filings · 20 docs
Site & exterior12p · 6 filings · 19 docs
Filed — no permit issued10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WHARTON REALTY GROUP13503/21/2026
GERTZ PLAZA ACQUISITION 2, LLC10707/08/2026
GERTZ PLAZA ACQUISITION II3103/21/2026
TRIERA CONTRACTING INC703/22/2026
GERTZ PLAZE ACQISITION 2203/21/2026
BCI103/21/2026
T-MOBILE103/21/2026
GERTZ PLAZA103/21/2026
CAMBRIDGE103/21/2026
GERTZ PLACE ACQUISITION 2103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SWA ARCHITECTURE1803/21/2026
ROSENBAUM DESIGN GROUP803/21/2026
AME SERVICES203/21/2026
NATIONAL MAINTENANCE403/21/2026
K M DOB CONSULTING203/21/2026
NEW YORK SIGN CONSULTANTS203/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EESON CONSTRUCTION TSG LLGeneral Contractor1207/08/2026
SHAWMUT WOODWORKING & SUPPLYGeneral Contractor807/08/2026
TRIERA CONTRACTING INCGeneral Contractor603/21/2026
NYC FIRE SPRINKLER CORPFire Protection407/08/2026
NATIONAL MAINTENANCEScaffold307/08/2026
ANNEX ENTERPRISE, INCGeneral Contractor303/21/2026
SERVICE SIGN ERECTORSScaffold207/08/2026
ARIANA CONTRACTING INCFire Protection207/08/2026
ARIANA CONTRACTING INCPlumbing207/08/2026
MURPHY, MICHAELElectrical103/21/2026
VICTOR HOLNESSElectrical103/21/2026
CARL EASTMANElectrical103/21/2026
JOSEPH BONURAElectrical103/21/2026
ALLIED TELECOM CORPGeneral Contractor107/08/2026
JOHNSON, GRADElectrical103/21/2026
FERRY, ANTHONYElectrical103/21/2026
FASULO, JOSEPHElectrical103/21/2026
CHELLI, NINOElectrical103/21/2026
ANTHONY LUCIANOElectrical103/21/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
MAUCERI SIGNScaffold107/08/2026
LUCIANO, ANTHONYElectrical103/21/2026
MICHAEL MURPHYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613702/16/2023
CATALPA SPECIAL INSPECTIO2004210/04/2022
MEP INSPECTIONS, INC1102206/07/2022
AUTOGRAPHIC CO1579102/08/2022
Building Lifecycle
All (206)Filed (26)Permit Issued (30)Signed Off (15)Facade (FISP) (13)Violation (60)Inspection (24)Objection (8)Special Inspection (30)
02/23/2026
Signed off — Alteration
Construction of new floor opening and shaft for a new handicap lift. No change in use, egress, occupancy, zoning computation and/or square footage under this application.
Q00464314-I1
10/29/2025
Violation issued (FDNY_ORDER, closed)
10/29/2025
Violation issued (FDNY_ORDER, closed)
10/29/2025
Violation issued (FDNY_ORDER, closed)
10/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/20/2024
Violation issued (FDNY_NOV, closed)
08/20/2024
Violation issued (FDNY_ORDER, closed)
07/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/01/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/18/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/26/2024
Objection resolved — Addressed
01/09/2024
Objection raised — Other
12/29/2023
Filed — Alteration CO
INTERIOR RENOVATIONS TO EXISTING 1ST FLOOR RETAIL SPACE.
Q00591751-P4
12/29/2023
Special inspection requirement — Interior lighting power
ERIC BERLENT
12/29/2023
Special inspection requirement — Lighting controls
ERIC BERLENT
12/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
12/29/2023
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
11/30/2023
Violation issued (FDNY_ORDER, closed)
10/19/2023
Filed — Alteration CO
INTERIOR RENOVATIONS TO EXISTING 1ST FLOOR RETAIL SPACE.
Q00591751-P3
10/16/2023
Special inspection requirement — Lighting controls
ERIC BERLENT
10/16/2023
Special inspection requirement — Interior lighting power
ERIC BERLENT
10/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
10/16/2023
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2023
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN FOR PRIMARK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00862871-I1
05/24/2023
Signed off — Alteration
MECHANICAL EQUIPMENT INSTALLATION TO AN EXISTING 1ST FLOOR AND MEZZANINE RETAIL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00610101-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2023
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN FOR PRIMARK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00862871-I1
04/21/2023
Permit issued — Sign
Q00862871-I1-SG
03/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2023
Signed off — Alteration
Q00642415-I1
02/23/2023
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN FOR PRIMARK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08044956-I1
02/18/2023
Permit issued — General Construction
Q00591751-I1-GC
02/16/2023
Filed — Alteration
Q00828093-I1
02/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
02/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
02/14/2023
Special inspection requirement — Electrical motors and elevators
Fran Huang
02/14/2023
Special inspection requirement — Maintenance information
Fran Huang
02/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
02/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
02/14/2023
Special inspection requirement — Shutoff dampers
Fran Huang
02/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
02/13/2023
Special inspection requirement — Final
Fran Huang
02/13/2023
Special inspection requirement — Mechanical Systems
Fran Huang
01/20/2023
Permit issued — Mechanical Systems
Q00610101-I1-MS
12/28/2022
Permit issued — Sign
Q08044956-I1-SG
12/22/2022
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN FOR PRIMARK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08044956-I1
12/22/2022
Special inspection requirement — Final
AHMED SHAABAN
11/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2022
Filed — Alteration
MECHANICAL EQUIPMENT INSTALLATION TO AN EXISTING 1ST FLOOR AND MEZZANINE RETAIL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00610101-P1
09/22/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/23/2022
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES, SPRINKLERS AND STANDPIPE TO AN EXISTING 1ST FLOOR AND MEZZANINE RETAIL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00617031-I1
08/17/2022
Permit issued — General Construction
Q00464314-I1-GC
08/10/2022
Signed off — Alteration
PRIMARK; INSTALLATION OF NEW WASTE AND VENT LINES IN PREPARATION FOR FUTURE TENANT OCCUPANCY. NO CHANGE IN USE, EGRESS, OCCUPANCY, SQUARE FOOTAGE AND OR ZONING.
Q00566094-I1
08/08/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/08/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/05/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/05/2022
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/04/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/28/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 206 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC04/21/2023
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY02/18/2023
DOB NOWMechanical SystemsSigned-offSHAWMUT WOODWORKING & SUPPLY01/20/2023
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/28/2022
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL08/17/2022
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP07/27/2022
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP07/27/2022
DOB NOWSprinklersPermit IssuedARIANA CONTRACTING INC06/20/2022
DOB NOWSprinklersPermit IssuedARIANA CONTRACTING INC06/20/2022
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC05/26/2022
DOB NOWMechanical SystemsSigned-offEESON CONSTRUCTION TSG LL05/25/2022
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC05/12/2022
DOB NOWStandpipePermit IssuedNYC FIRE SPRINKLER CORP05/06/2022
DOB NOWStandpipePermit IssuedNYC FIRE SPRINKLER CORP05/06/2022
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC03/30/2022
DOB NOWStructuralSigned-offSHAWMUT WOODWORKING & SUPPLY02/25/2022
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY02/08/2022
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.01/28/2022
DOB NOWMechanical SystemsSigned-offSHAWMUT WOODWORKING & SUPPLY01/26/2022
DOB NOWSignSigned-offMAUCERI SIGN CO., INC01/06/2022
DOB NOWStructuralSigned-offEESON CONSTRUCTION TSG LL10/21/2021
DOB NOWConstruction FencePermit IssuedANNEX ENTERPRISE, INC09/13/2021
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL09/03/2021
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO06/14/2021
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO06/14/2021
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL05/18/2021
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL04/21/2021
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC06/08/2020
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC05/22/2019
DOB NOWAntennaSigned-offALLIED TELECOM CORP02/16/2018
BISOTISSUEDANNEX ENTERPRISE, INC04/09/2021
BISOTISSUEDEESON CONSTRUCTION TSG LL10/13/2020
BISSPISSUEDPLUMBING & HTG DOCTOR INC10/07/2019
BISOTISSUEDANNEX ENTERPRISE, INC08/29/2019
BISOTISSUEDEESON CONSTRUCTION TSG LL07/02/2019
BISMHISSUEDEESON CONSTRUCTION TSG LL07/02/2019
BISSPISSUEDPLUMBING & HTG DOCTOR INC05/24/2019
BISPLISSUEDPLUMBING & HTG DOCTOR INC05/22/2019
BISMHISSUEDEESON CONSTRUCTION TSG LL03/28/2019
BISOTISSUEDEESON CONSTRUCTION TSG LL03/28/2019
+ 40 more permits on file
12 projects · most recent 04/14/2026
General Wiring Lighting
FiledStatusContractorScope
04/14/2026CompleteASKO ELEC CONST & MAIN INGeneral Wiring
10/19/2023Permit IssuedCOMMERCIAL ELECT CONT INCGeneral Wiring
05/09/2023CompleteC.FALCO ELETL CONT CORP—
11/03/2022CompleteMER ELECTRIC, INCGeneral Wiring
09/29/2022Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
08/17/2021CompleteASKO ELEC CONST & MAIN INGeneral Wiring
11/05/2020CompleteY.S ELECTRICGeneral Wiring, Lighting
11/05/2020CompleteY.S ELECTRICGeneral Wiring, Lighting
07/08/2020CancelledTHYSSENKRUPP ELEVATOR CO—
05/22/2019CompleteTOP SHELF ELECTRIC CORP—
12/19/2018CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
07/23/2018CancelledUSIS ELECTRIC INCGeneral Wiring
1 project · most recent 09/13/2021
Fence
FiledStatusContractorScope
09/13/2021Permit IssuedANNEX ENTERPRISE, INCFence
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
10/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Fail-Final CND-Occupancy InspectionFailView ↗
06/18/2024Fail-Final CND-Occupancy InspectionFailView ↗
03/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2022Fail-Final General Construction Non-Directive 14FailView ↗
08/05/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/05/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/04/2022Pass-Final PL - UndergroundPassView ↗
07/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/14/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
12/29/2023Interior lighting powerERIC BERLENTenergy_progress
12/29/2023Lighting controlsERIC BERLENTenergy_progress
12/29/2023Fire-Resistance Rated ConstructionERIC BERLENTprogress
12/29/2023Energy Code Compliance InspectionsERIC BERLENTprogress
10/16/2023Lighting controlsERIC BERLENTenergy_progress
10/16/2023Interior lighting powerERIC BERLENTenergy_progress
10/16/2023Fire-Resistance Rated ConstructionERIC BERLENTprogress
10/16/2023Energy Code Compliance InspectionsERIC BERLENTprogress
02/14/2023Fire-Resistant Penetrations and JointsFran Huangspecial
02/14/2023Energy Code Compliance InspectionsFran Huangprogress
02/14/2023Electrical motors and elevatorsFran Huangenergy_progress
02/14/2023Maintenance informationFran Huangenergy_progress
02/14/2023HVAC-R and service water heating system controlsFran Huangenergy_progress
02/14/2023HVAC-R and service water heating equipmentFran Huangenergy_progress
02/14/2023Shutoff dampersFran Huangenergy_progress
02/14/2023HVAC-R and service water piping design and insulationFran Huangenergy_progress
02/13/2023FinalFran Huangprogress
02/13/2023Mechanical SystemsFran Huangspecial
12/22/2022FinalAHMED SHAABANprogress
06/08/2022Standpipe SystemsNicolas Crosettospecial
06/08/2022Sprinkler SystemsNicolas Crosettospecial
04/29/2022Fire-Resistance Rated ConstructionERIC BERLENTprogress
04/29/2022HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
04/29/2022Maintenance informationERIC BERLENTenergy_progress
04/29/2022HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
Latest 25 of 56.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
PrimarkRetailFloor 1, Mezzanine
Project Q00617031 Alteration · LOC Issued · 01/05/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,263 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch21
08/29/2026Q00018406-I1Request digital key ↗
08/27/2026Q00489111-I1Request digital key ↗
08/27/2026Q00489114-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00467712-I1Request digital key ↗
08/27/2026Q00464314-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00170695-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00467717-I1Request digital key ↗
▸Applications & Permits238
▸BISPLAN / WORK APPROVAL APPLICATION129
04/26/2021421743910Open ↗
04/16/2021421743910Open ↗
09/10/2020440622694Open ↗
Showing 3 of 129 on file for this type
▸BISWORK PERMIT APPLICATION103
10/13/2020440622694Open ↗
10/09/2019421951962Open ↗
10/09/2019421951944Open ↗
Showing 3 of 103 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/21/2020421952550Open ↗
05/21/2020421951962Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00591751-I1Open ↗
▸Seals & Professional Certifications306
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION145
08/01/2019421743910Open ↗
07/29/2019421951962Open ↗
07/29/2019421951962Open ↗
Showing 3 of 145 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST40
08/01/2019421743910Open ↗
07/22/2019421951962Open ↗
07/22/2019421951944Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
10/01/2026Q00828093-I1Open ↗
10/01/2026Q00828093-I1Open ↗
10/01/2026Q00828093-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/28/2026Q00170695-I1Open ↗
08/27/2026Q00467717-I1Open ↗
08/27/2026Q00464314-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
09/10/2020440622694Open ↗
08/01/2019421743910Open ↗
07/22/2019421951962Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/01/2026Q00828093-I1Open ↗
10/01/2026Q00828093-I1Open ↗
09/01/2026Q00667751-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/10/2020440622694Open ↗
02/11/2019440535379Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/10/2020440622694Open ↗
02/11/2019440535379Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment142
▸BISEQUIPMENT USE PERMITS45
09/10/2020421952550Open ↗
09/10/2020421951962Open ↗
08/14/2020421952550Open ↗
Showing 3 of 45 on file for this type
▸BISSELF-CERT PLUMBING NOTICE34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISSCHEDULE B - PLUMBING22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT15
08/14/2020421952550Open ↗
07/28/2020421951962Open ↗
07/19/2020421951962Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
07/22/2019421951962Open ↗
07/22/2019421951944Open ↗
03/26/2019421952550Open ↗
Showing 3 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-857
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
12/10/2020421952435Open ↗
Showing 1 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
02/11/2019440535379Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00591751-P1Open ↗
08/13/2026Q00591751-P4Open ↗
08/13/2026Q00591751-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
08/01/2019421743910Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos85
▸BISASBESTOS: CERTIFICATION (DEP ACP5)30
09/10/2020440622694Open ↗
07/22/2019421951962Open ↗
07/22/2019421951944Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/27/2026Q00467717-I1Open ↗
08/27/2026Q00464314-I1Open ↗
08/27/2026Q00504136-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
09/03/2019421743910Open ↗
▸Energy Compliance76
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS40
08/01/2019421743910Open ↗
07/29/2019421951962Open ↗
07/22/2019421951962Open ↗
Showing 3 of 40 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
07/28/2020421951962Open ↗
07/21/2020421951962Open ↗
07/21/2020421952550Open ↗
Showing 3 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/10/2020440622694Open ↗
07/28/2020421951962Open ↗
07/21/2020421951962Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00591751-I1Open ↗
08/13/2026Q00610101-I1Open ↗
08/13/2026Q00504136-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/10/2020440622694Open ↗
02/11/2019440535379Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/15/2021421743910Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY9
09/10/2020440622694Open ↗
07/28/2020421951962Open ↗
07/21/2020421951962Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs135
▸BISADMINISTRATIVE OBJECTIONS57
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 57 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST41
07/15/2021421743910Open ↗
12/16/2020421952435Open ↗
08/14/2020421952550Open ↗
Showing 3 of 41 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION31
07/24/2020421952550Open ↗
Showing 1 of 31 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL1
07/15/2021421743910Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPRVD FAB CERT-COMPLIANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership117
▸BISCOST AFFIDAVIT113
12/16/2020421952435Open ↗
12/10/2020421952435Open ↗
09/10/2020440622694Open ↗
Showing 3 of 113 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/15/2021421743910Open ↗
▸Filing & Intake Forms116
▸BISEFILING COVER SHEET67
08/01/2019421743910Open ↗
07/22/2019421951962Open ↗
07/22/2019421951962Open ↗
Showing 3 of 67 on file for this type
▸BISADDITIONAL INFORMATION43
04/26/2021421743910Open ↗
09/10/2020440622694Open ↗
08/14/2020421952550Open ↗
Showing 3 of 43 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/10/2020440622694Open ↗
02/11/2019440535379Open ↗
Showing 2 of 3 on file for this type
▸BISBOROUGH INTAKE FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/24/2020421952578Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/28/2026Q00170695-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00591751-I1Open ↗