← Back
BuildNYC
Cape Cod
162-12 76TH AVENUE
QUEENS · BIN 4148259
💬 Discuss this project
1955Year Built
1.5Stories
A0Building Class
R3-2Zoning
1,105 sfGross Floor Area
1Units
Cape Cod · Owner of record: 76 Lucky New York · 6,160 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
Filed — no permit issuedTemporary construction fence2p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
76 Lucky New York1704/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/27/2025$1.2M—Private party → 76 Lucky New York$1,090/sf building
11/22/2017$438K—Private party → Private party$396/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brian Ill Development304/15/2026
Ameriland Brook310/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ameriland Brook403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506204/15/2026
Brian Ill Development1402104/15/2026
Building Lifecycle
04/15/2026
Filed — New Building
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTH SIDE.
Q01310882-S3
04/09/2026
Objection raised — Scope
04/09/2026
Objection resolved — Addressed
01/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
40 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 04/15/2026
Heating Systems
FiledStatusContractorScope
04/15/2026——Heating Systems
1 project · most recent 04/15/2026
Sprinkler System
FiledStatusContractorScope
04/15/2026——Sprinkler System
1 project · most recent 04/15/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/15/2026——Gas, Storm, Water/Sanitary
1 project · most recent 04/15/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/15/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
01/08/2026Excavations - Sheeting, Shoring, and Bracing—special
01/08/2026Subsurface Investigations (Borings/Test Pits)—special
12/17/2025Protection of exposed foundation insulation—energy_progress
10/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBRIAN ILLspecial
10/30/2025Energy Code Compliance InspectionsBRIAN ILLprogress
10/30/2025HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
10/30/2025HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
10/30/2025HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
10/30/2025Maintenance informationBRIAN ILLenergy_progress
10/30/2025Sprinkler SystemsXIAOHONG ZHAOspecial
10/30/2025Fire-Resistant Penetrations and JointsBRIAN ILLspecial
10/29/2025Footing and Foundation—progress
10/29/2025Energy Code Compliance Inspections—progress
10/29/2025Fire-Resistance Rated Construction—progress
10/29/2025Duct leakage testing, insulation and design—energy_progress
10/29/2025Electric vehicle service equipment requirements—energy_progress
10/29/2025Fenestration and door U-factor and product ratings—energy_progress
10/29/2025HVAC-R and service water piping design and insulation—energy_progress
10/29/2025Interior lighting power—energy_progress
10/29/2025Fenestration areas—energy_progress
10/29/2025Maintenance information—energy_progress
10/29/2025HVAC-R and service water heating equipment—energy_progress
10/29/2025Air barrier — testing —energy_progress
10/29/2025Insulation placement and R values—energy_progress
10/29/2025Mechanical Systems—special
Latest 25 of 41.
37 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account