← Back
Two family frame
162-19 86 ROAD
QUEENS · BIN 4209197
💬 Discuss this project
1920Year Built
2.75Stories
B2Building Class
R4AZoning
3,077 sfGross Floor Area
2Units
Rent Stabilized30 Open Violations 27 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family frame · Owner of record: 162-21 86TH RD.LLC · 4,000 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar4p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
162-21 86TH RD LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/17/2017$399K—— → —$130/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC206/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING403/21/2026
Building Lifecycle
All (65)Filed (2)Violation (41)Objection (19)Special Inspection (3)
05/06/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
12/03/2024
Violation issued (HPD, open)
I
04/15/2024
Violation issued (HPD, open)
A
02/21/2024
Objection raised — Fire_Protection
02/21/2024
Objection raised — Mechanical
02/21/2024
Objection raised — Mechanical
02/03/2024
Special inspection requirement — Demolition
02/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/27/2023
Violation issued (HPD, open)
I
05/15/2023
Violation issued (ECB, open)
Construction
05/15/2023
Violation issued (ECB, open)
Unknown
03/28/2023
Violation issued (HPD, open)
A
12/14/2022
Violation issued (ECB, open)
Construction
11/16/2022
Violation issued (HPD, open)
I
07/01/2022
Objection raised — Scope
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Admin
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Zoning
07/01/2022
Objection resolved — Resolved
07/01/2022
Objection raised — Inspections
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Scope
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Zoning
07/01/2022
Objection resolved — Resolved
07/01/2022
Objection raised — Scope
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Admin
07/01/2022
Objection resolved — Resolved
06/28/2022
Filed — Alteration
Restoration to original legal conditions of the existing cellar and egress as per submitted drawings. No change in use and occupancy.
Q00728685-I1
06/24/2022
Filed — Alteration
Q00729775-I1
04/01/2022
Violation issued (HPD, open)
I
03/28/2022
Violation issued (HPD, open)
C
03/28/2022
Violation issued (HPD, closed)
C
03/28/2022
Violation issued (HPD, closed)
C
03/28/2022
Violation issued (HPD, closed)
C
03/28/2022
Violation issued (HPD, closed)
C
03/28/2022
Violation issued (HPD, closed)
C
03/28/2022
Violation issued (HPD, open)
C
03/28/2022
Violation issued (HPD, open)
B
03/28/2022
Violation issued (HPD, open)
A
03/28/2022
Violation issued (HPD, open)
B
03/28/2022
Violation issued (HPD, open)
B
03/28/2022
Violation issued (HPD, open)
C
03/28/2022
Violation issued (HPD, open)
B
03/28/2022
Violation issued (HPD, open)
B
03/28/2022
Violation issued (HPD, open)
C
03/28/2022
Violation issued (HPD, open)
C
03/03/2022
Violation issued (HPD, open)
I
03/03/2022
Violation issued (HPD, open)
A
04/15/2021
Violation issued (HPD, open)
A
04/15/2021
Violation issued (HPD, open)
I
11/01/2019
Violation issued (HPD, open)
I
10/23/2018
Violation issued (HPD, closed)
I
12/04/2017
Violation issued (HPD, closed)
I
11/18/2016
Violation issued (HPD, closed)
I
Latest 60 of 65 events.
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
02/03/2024Demolition—special
02/03/2024Structural Stability – Alterations of existing buildings—special
02/03/2024Tenant Protection Plan Compliance—special
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00729775-I1Request digital key ↗
08/26/2026Q00728685-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q00729775-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026Q00729775-I1Open ↗
08/13/2026Q00728685-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026Q00729775-I1Open ↗
08/13/2026Q00728685-I1Open ↗