← Back
Multi-story department store
162-29 JAMAICA AVENUE
QUEENS · Jamaica · BIN 4208889
💬 Discuss this project
1937Year Built
4Stories
K3Building Class
C6-3Zoning
79,200 sfGross Floor Area
2Units
LL97 Covered30 Open Violations 28 unresolved · 2 paperwork only ▸FDNY Report ↗
Multi-story department store · Owner of record: JACKSON JAMAICA OPPORTUNITY LLC · 18,300 sf lot · 4.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof11p · 4 filings · 20 docs
Floor 45p · 2 filings · 20 docs
Floor 34p · 2 filings · 20 docs
Floor 29p · 2 filings · 20 docs
Floor 1Under Construction19p · 5 filings · 20 docs
Mezzanine5p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
162-21 JAMAICA AVENUE2807/08/2026
JACKSON JAMAICA OPPORTUNITY LLC103/22/2026
H BUILDING MANAGEMENT203/22/2026
162-21 JAMAICA1803/22/2026
JEHRL MGMT CORP103/22/2026
JKNER MGMT CORP103/22/2026
JENEL MANAGEMENT503/22/2026
JEMEL MGMT CORP303/22/2026
VENATOR GROUP203/22/2026
FW WOOLWORTH CO # 276103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP603/21/2026
CONCEPT DESIGN GROUP303/21/2026
LOUIS STRIAR203/21/2026
RPO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SELEUCIA CONTRACTING LLCGeneral Contractor507/08/2026
PALACE HOUSING CORPGeneral Contractor208/20/2026
MC SUPERSTRUCTURE INCGeneral Contractor204/08/2026
MAROTTA & SON P&H CONTR CPlumbing207/08/2026
DEMARTINO CONSTR. CO. INCGeneral Contractor204/08/2026
A & F FIRE PROTECTION COFire Protection109/10/2026
FIVE TOWN NEON SIGN CO INScaffold107/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
H BUILDING MANAGEMENT INCGeneral Contractor104/09/2026
NEW LAND CONSTRUCTION NYGeneral Contractor107/08/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422108/13/2026
AA BUILDING & INSPECTION1519303/19/2026
CL ENGINEERING P.C.6781109/19/2025
LUCID BUILDING ENGINEERIN8196109/19/2025
QUALITY TESTING, LLC7344309/04/2025
CDG ARCHITECTS LLC /DBA:1327310/15/2020
Building Lifecycle
All (138)Filed (19)Permit Issued (17)Signed Off (5)Violation (60)Inspection (5)Objection (2)Special Inspection (30)
09/09/2026
Permit issued — Plumbing
Q01258077-S2-EW-SP
08/31/2026
Special inspection requirement — Sprinkler Systems
KEVIN SNEDEKER
08/20/2026
Signed off — Alteration
REPLACE EXISTING GAS HEATING/ELECTRIC COOLING UNIT LOCATED ON THE ROOF OVER THE FIRST FLOOR WITH A NEW UNIT.
Q01443674-I1
08/18/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01288815-I1
08/18/2026
Permit issued — Mechanical Systems
Q01443674-I1-MS
08/13/2026
Filed — Alteration
REPLACE EXISTING GAS HEATING/ELECTRIC COOLING UNIT LOCATED ON THE ROOF OVER THE FIRST FLOOR WITH A NEW UNIT.
Q01443674-I1
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
08/10/2026
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
08/10/2026
Special inspection requirement — Final
SERDAR CEYLAN
07/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/15/2026
Signed off — Alteration
Interior renovation as per plans
Q01175705-I1
04/24/2026
Permit issued — General Construction
Q01175705-I1-GC
04/06/2026
Objection raised — Energy
04/06/2026
Objection raised — Admin
03/25/2026
Filed — Alteration CO
Proposed Community Facility for the Third and Fourth Floor only and minor partitions.
Q01327705-I1
03/19/2026
Filed — Alteration
Interior renovation as per plans
Q01175705-P5
03/16/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
03/16/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
03/16/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
03/16/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/16/2026
Special inspection requirement — Final
NAVEEN KUMAR
03/16/2026
Special inspection requirement — Exterior lighting power
Younes Abouyaala
03/16/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
03/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
03/04/2026
Filed — Alteration
Interior renovation as per plans
Q01175705-P4
03/04/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
03/04/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
03/04/2026
Special inspection requirement — Final
NAVEEN KUMAR
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/04/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
03/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
03/04/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
03/04/2026
Special inspection requirement — Exterior lighting power
Younes Abouyaala
03/04/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
03/02/2026
Violation issued (ECB, closed)
Site Safety
03/02/2026
Violation issued (ECB, closed)
Unknown
02/12/2026
Violation issued (FDNY_NOV, closed)
01/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01288815-P2
11/12/2025
Signed off — Alteration
Interior renovation as per plans
Q01175705-S1
10/31/2025
Permit issued — Sprinklers
Q01258077-S2-PL
10/27/2025
Violation issued (FDNY_ORDER, closed)
10/27/2025
Violation issued (FDNY_NOV, closed)
10/07/2025
Permit issued — Mechanical Systems
Q01258077-S1-MS
10/07/2025
Permit issued — General Construction
Q01258077-I1-GC
10/03/2025
Permit issued — Structural
Q01175705-S1-ST
10/02/2025
Special inspection requirement — Final
YUNHO LEE
10/02/2025
Special inspection requirement — Structural Steel - Welding
CHRISTIAN LOZADA
10/02/2025
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
10/02/2025
Special inspection requirement — Structural Steel - Details
YUNHO LEE
10/01/2025
Filed — Alteration
Interior renovation as per plans
Q01175705-P3
10/01/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01288815-P1
09/29/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/29/2025
Special inspection requirement — Structural Steel - Welding
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA & F FIRE PROTECTION CO09/09/2026
DOB NOWMechanical SystemsSigned-offPALACE HOUSING CORP08/18/2026
DOB NOWGeneral ConstructionSigned-offPALACE HOUSING CORP04/24/2026
DOB NOWSprinklersSigned-offAQUA PLUMBING & HTNG CORP10/31/2025
DOB NOWMechanical SystemsSigned-offDEMARTINO CONSTR. CO. INC10/07/2025
DOB NOWGeneral ConstructionSigned-offDEMARTINO CONSTR. CO. INC10/07/2025
DOB NOWStructuralSigned-offNEW LAND CONSTRUCTION NY10/03/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC09/17/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC09/17/2025
DOB NOWGeneral ConstructionSigned-offH BUILDING MANAGEMENT INC09/02/2025
DOB NOWMechanical SystemsPermit IssuedSELEUCIA CONTRACTING LLC11/23/2022
DOB NOWMechanical SystemsPermit IssuedSELEUCIA CONTRACTING LLC04/20/2022
DOB NOWSignSigned-offENRICO PASSARO08/30/2021
DOB NOWPlumbingSigned-offMAROTTA & SON P&H CONTR C11/27/2020
DOB NOWPlumbingSigned-offMAROTTA & SON P&H CONTR C10/15/2020
DOB NOWMechanical SystemsPermit IssuedSELEUCIA CONTRACTING LLC09/16/2020
DOB NOWSprinklersPermit IssuedSAFETY FIRE SPRINKLER CORP09/16/2020
BISOTISSUEDSELEUCIA CONTRACTING LLC06/30/2022
BISOTISSUEDSELEUCIA CONTRACTING LLC06/28/2022
BISOTISSUEDSELEUCIA CONTRACTING LLC09/29/2020
BISOTISSUEDPAV-LAK CONTRACTING INC02/07/2020
BISOTISSUEDPAV-LAK CONTRACTING INC02/07/2020
BISOTISSUEDPAV-LAK CONTRACTING INC02/26/2019
BISOTISSUEDPAV-LAK CONTRACTING INC02/01/2019
BISOTISSUEDPAV-LAK CONTRACTING INC05/25/2018
BISOTISSUEDPAV-LAK CONTRACTING INC01/22/2018
BISOTISSUEDSMJ CONSTRUCTION TECH,LLC07/10/2017
BIS—ISSUEDAMERICAN SIGN & ELECL CON05/24/2017
BIS—ISSUEDAMERICAN SIGN & ELECL CON05/24/2017
BISSPISSUEDPLUMBING & HTG DOCTOR INC04/20/2017
BISEQISSUEDSMJ CONSTRUCTION TECH,LLC03/22/2017
BISPLISSUEDPLUMBING & HTG DOCTOR INC03/10/2017
BISOTISSUEDSMJ CONSTRUCTION TECH,LLC03/08/2017
BISEQISSUEDJERRICK ASSOCIATES INC11/04/2016
BIS—ISSUEDUNITECH DESIGN INC10/21/2010
BIS—ISSUEDUNITECH DESIGN INC10/21/2010
BISOTISSUEDTEO DESIGN10/12/2010
BIS—ISSUEDPARKER SERVICE INDUSTRIES02/13/2001
BIS—ISSUEDPARKER SERVICE INDUSTRIES02/07/2001
BISPLISSUEDORBIT PLBG & HTG INC05/04/2000
+ 17 more permits on file
2 projects · most recent 08/13/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026Signed-offPALACE HOUSING CORPHeating and Air Conditioning Systems
Heat / Cool
Carrier 48FEFM28BJA5 - 8W4C0 25 tons · Rooftop Unit ×1
09/15/2020Permit IssuedSELEUCIA CONTRACTING LLCAir Conditioning Systems
Cooling
Mitsubishi Electric PUZ-A36NKA7 3 tons · Condensing Unit ×1
2 projects · most recent 09/04/2025
Sprinkler System
FiledStatusContractorScope
09/04/2025Permit IssuedA & F FIRE PROTECTION COSprinkler System
09/15/2020Permit IssuedSAFETY FIRE SPRINKLER COR—
1 project · most recent 09/04/2025
Water/Sanitary
FiledStatusContractorScope
09/04/2025Signed-offAQUA PLUMBING & HTNG CORPWater/Sanitary
10 projects · most recent 11/10/2025
General Wiring
FiledStatusContractorScope
11/10/2025CompleteM & M CONTROL WIRING &General Wiring
09/24/2025CompleteHESO ELECTRICAL INCGeneral Wiring
09/17/2025Permit IssuedNASH ELECTRIC SERVICES IN—
05/07/2025CancelledPSB ELECTRICAL CORP—
05/10/2022CompleteVALMAR ELECTRIC CORP.General Wiring
11/16/2020CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
08/27/2020CompleteVALMAR ELECTRIC CORP.General Wiring
08/30/2018CompleteJAM ELECTRICAL CORP—
03/11/2018CompleteJAM ELECTRICAL CORP—
02/02/2018CompletePATRIOT ELECTRIC CORPGeneral Wiring
1 project · most recent 03/19/2026
Steel Concrete
FiledStatusContractorScope
03/19/2026Signed-offPALACE HOUSING CORPSteel, Concrete
1 project · most recent 11/17/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
11/17/2025Signed-offMC SUPERSTRUCTURE INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
08/31/2026Sprinkler SystemsKEVIN SNEDEKERspecial
08/13/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
08/11/2026HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
08/11/2026HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
08/10/2026FinalSERDAR CEYLANprogress
08/10/2026Mechanical SystemsSERDAR CEYLANspecial
03/16/2026Exterior lighting powerYounes Abouyaalaenergy_progress
03/16/2026Fenestration air leakageYounes Abouyaalaenergy_progress
03/16/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
03/16/2026Lighting controlsYounes Abouyaalaenergy_progress
03/16/2026Fenestration areasYounes Abouyaalaenergy_progress
03/16/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/16/2026FinalNAVEEN KUMARprogress
03/16/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
03/16/2026Air barrier — testing Younes Abouyaalaenergy_progress
03/04/2026Air barrier — testing Younes Abouyaalaenergy_progress
03/04/2026Exterior lighting powerYounes Abouyaalaenergy_progress
03/04/2026Lighting controlsYounes Abouyaalaenergy_progress
03/04/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
03/04/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
03/04/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/04/2026FinalNAVEEN KUMARprogress
03/04/2026Fenestration air leakageYounes Abouyaalaenergy_progress
03/04/2026Fenestration areasYounes Abouyaalaenergy_progress
10/02/2025FinalYUNHO LEEprogress
Latest 25 of 70.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Shoppers WorldRetailFloors 1–5
Project Q00518329 Alteration · LOC Issued · 08/09/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 323 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch17
08/27/2026Q00518329-I1Request digital key ↗
08/19/2026Q01258077-P1Request digital key ↗
08/19/2026Q01258077-S1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00399355-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00399585-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00399613-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION25
06/24/2022440626235Open ↗
06/10/2022440626235Open ↗
06/06/2022440626235Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION21
09/06/2022440626235Open ↗
09/29/2020440626235Open ↗
02/18/2020421590825Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/15/2011420259570Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01327705-I1Open ↗
▸Seals & Professional Certifications91
▸DOB NOWProgress Inspector Seal & Signature24
08/27/2026Q01175705-S1Open ↗
08/26/2026Q01175705-P5Open ↗
08/26/2026Q01175705-P5Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/28/2026Q00399355-I1Open ↗
08/27/2026Q00399613-I1Open ↗
08/19/2026Q01258077-P1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
03/23/2020421590825Open ↗
03/23/2020421589329Open ↗
03/20/2020421590825Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/13/2026Q01258077-S2Open ↗
08/27/2026Q01175705-S1Open ↗
08/27/2026Q01175705-S1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
09/28/2020440626235Open ↗
01/08/2018421589329Open ↗
04/05/2017421463277Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/28/2020440626235Open ↗
03/17/2017440391363Open ↗
03/06/2017440384175Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/08/2018421589329Open ↗
04/05/2017421463277Open ↗
04/05/2017421463268Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/28/2020440626235Open ↗
03/17/2017440391363Open ↗
03/06/2017440384175Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/08/2010420259570Open ↗
▸Trade Schedules & Equipment10
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL4
09/28/2020440626235Open ↗
03/17/2017440391363Open ↗
03/06/2017440384175Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/15/2017440391363Open ↗
05/15/2017401074797Open ↗
▸BISSCHEDULE B - PLUMBING2
03/17/2017440391363Open ↗
03/06/2017440384175Open ↗
▸BISEQUIPMENT USE PERMITS1
10/06/2021440384175Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/15/2020440384175Open ↗
▸Environmental & Asbestos52
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/28/2026Q00399355-I1Open ↗
08/27/2026Q00399613-I1Open ↗
08/19/2026Q01258077-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWOER: Notice to Proceed11
08/17/2026Q01327705-I1Open ↗
08/13/2026Q01175705-S1Open ↗
08/13/2026Q01258077-S2Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
09/28/2020440626235Open ↗
02/12/2019421590825Open ↗
01/24/2018421589329Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/17/2026Q01175705-I1Open ↗
08/17/2026Q01327705-I1Open ↗
08/13/2026Q00399613-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED5
09/28/2020440626235Open ↗
04/20/2018421590825Open ↗
03/17/2017440391363Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
10/08/2010420259570Open ↗
Showing 1 of 3 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
05/15/2020440384175Open ↗
02/20/2018421589329Open ↗
▸Energy Compliance20
▸BISAS-BUILT ENERGY ANALYSIS5
05/18/2020440384175Open ↗
05/15/2020440384175Open ↗
03/23/2020421590825Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/29/2020440626235Open ↗
09/28/2020440626235Open ↗
05/15/2020440384175Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/10/2020440391363Open ↗
08/07/2019440384175Open ↗
04/04/2018421590825Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/28/2020440626235Open ↗
03/17/2017440391363Open ↗
03/06/2017440384175Open ↗
▸BISNYCECC ANALYSIS3
09/28/2020440626235Open ↗
03/17/2017440391363Open ↗
03/06/2017440384175Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/01/2016440358694Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/29/2020440626235Open ↗
09/28/2020440626235Open ↗
03/17/2017440391363Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
08/28/2020421590825Open ↗
05/18/2020440384175Open ↗
03/26/2020421590825Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
10/17/2019440384175Open ↗
10/17/2019440384175Open ↗
02/12/2018420258321Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
10/08/2010420259570Open ↗
Showing 1 of 3 on file for this type
▸BISSUPERSEDING LETTER1
06/07/2018421589329Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
09/28/2020440626235Open ↗
05/18/2020440384175Open ↗
03/23/2020421590825Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION15
06/10/2022440626235Open ↗
04/20/2020440384175Open ↗
04/20/2020440384175Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET7
04/04/2018421590825Open ↗
01/05/2018421589329Open ↗
04/05/2017421463277Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/28/2020440626235Open ↗
03/17/2017440391363Open ↗
03/06/2017440384175Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
11/17/2017421463277Open ↗
11/17/2017421463268Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026Q01175705-P2Open ↗
08/16/2026Q01175705-P2Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/28/2020421590825Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION1
02/10/2020440391363Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/18/2020440384175Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01327705-I1Open ↗