DOB06/19/2016V-DOB VIOLATION - ACTIVE
DOB06/15/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/15/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/01/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB03/24/2016UNLAWFULLY CONTINEUD WORK WHILE ON NOTICE OF A STOP WORK ORDER.NOTE: ACTIVE JOBSITE,OBSERVED WORKERS DOING FORMWORK,CARRYING FORMS,ERECTINGFORMS AT EXP#3 OF SITE.SITE UNDER PSWO VIA EXCAVATION UNIT,PARTIAL ()GNothing owed — awaiting certificate of correction
ECB03/24/2016SEC. 3303.14 DRAINAGE: EXCAVATED AREA. NOTE: ACTIVE SITE EXCAVATED APPROX 5FT DEEP AREA 20X40 ALLOWED TO COLLECT WATER,THERE ARE NO PUMPS REMOVING WATER. THIS CONDITION NEEDS IMMEDIATELY ATTENTION & IS HAZARDOUNothing owed — awaiting certificate of correction
ECB03/10/2016FAIURE TO NOTIFY DOB W/I 24-48HRS OF THE START OF EXCAVATION. AT THE TIME OF INSPECTION EXCAVATION OPERATIONS WERE OBSERVED TO INSTALL A NEWFOOTING & FOUNDATION FOR A NEW BLDG. NO RULE 52 WAS ON FILE.Nothing owed — awaiting certificate of correction
ECB03/10/2016WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS OR APPROVED AMENDMENTS. AT THE TIME OF INSPECTION THE FOUNDATION PLANS ON SITE INDICATED THE BOTTOM OF THE FOOTING TO BE 8' BELOW GROUND LEVEL. AT THENothing owed — awaiting certificate of correction
ECB03/10/2016SEC. 48 FAILURE TO ADEQAUTELY SUPERVISOR WORK AT A CONSTRUCTION SITE TO MAINTAIN A SAFE SITE & INSURE PLAN CONFORMANCE. THE FOLLOWING HAZARDOUS CONDITIONS WERE OBSERVED ALONG W/A STOP WORK ORDER ON 3-10-16.Nothing owed — awaiting certificate of correction
ECB03/10/2016WORK W/O A PERMIT. AT THE TIME OF INSPECTION CONTRACTORS WERE DRAININGWATER FROM THE CONSTRUCTION SITE INTO THE STORM WATER DRAINS ON THE ROADWAY. NO PERMIT FOR THIS WORK WAS ON FILE. REMEDY: COMPLY W/NOV.Nothing owed — awaiting certificate of correction
ECB03/10/2016SEC. 3309.6 FAILURE TO ADEQUATELY CONTROL OR PREVENT THE IN FLOW OF GROUND WATER INTO THE EXCAVATION SITE. AT THE TIME OF INSPECTION AN EXCAVATION AMOUNT OF GROUND WATER WAS OBSERVED THROUGHOUT THE ENTIRE SITENothing owed — awaiting certificate of correction