← Back
Single or multiple dwelling with stores or offices
162 DRIGGS AVENUE
BROOKLYN · BIN 3067080
💬 Discuss this project
1930Year Built
3Stories
S9Building Class
R6BZoning
5,125 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 2,375 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 2 filings · 12 docs
Floor 14p · 2 filings · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TALAL ALOKUSH PE110/25/2024
BAALBAKI&ASSOCIATES ENGINEERING, PC205/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B A INSPECTIONS403/21/2026
ABT VENTURES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIDEEN INTERIOR DECORATIONGeneral Contractor303/21/2026
TWIN POWER HEATING COOLINGGeneral Contractor303/21/2026
KATAN P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519110/25/2024
BAALBAKI&ASSOCIATES ENGIN1858205/17/2023
Building Lifecycle
All (49)Filed (3)Permit Issued (3)Signed Off (1)Violation (15)Objection (20)Special Inspection (7)
06/24/2025
Signed off — Alteration
Proposed installation of refrigeration units and AC split systems as per plans
B01129534-I1
12/19/2024
Permit issued — Mechanical Systems
B01129534-I1-MS
12/14/2024
Objection resolved — Addressed
12/14/2024
Objection resolved — Addressed
12/14/2024
Objection resolved — Addressed
10/29/2024
Objection raised — Scope
10/29/2024
Objection raised — Scope
10/29/2024
Objection raised — Cost
10/25/2024
Filed — Alteration
Proposed installation of refrigeration units and AC split systems as per plans
B01129534-I1
10/23/2024
Special inspection requirement — Interior lighting power
TALAL ALOKUSH
10/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
TALAL ALOKUSH
10/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
TALAL ALOKUSH
10/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
TALAL ALOKUSH
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/18/2024
Special inspection requirement — Final
NAVEEN KUMAR
10/18/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
06/12/2024
Violation issued (FDNY_NOV, closed)
07/17/2023
Permit issued — Plumbing
B00874776-I1-PL
07/14/2023
Permit issued — General Construction
B00874775-I1-GC-CX
05/19/2023
Objection raised — Scope
05/19/2023
Objection resolved — Addressed
05/19/2023
Objection raised — Inspections
05/19/2023
Objection resolved — Addressed
05/19/2023
Objection raised — Other
05/19/2023
Objection resolved — Addressed
05/19/2023
Objection raised — Other
05/19/2023
Objection resolved — Addressed
05/19/2023
Objection raised — Scope
05/19/2023
Objection resolved — Addressed
05/19/2023
Objection raised — Scope
05/19/2023
Objection resolved — Addressed
05/19/2023
Objection raised — Scope
05/19/2023
Objection resolved — Addressed
05/17/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING MERCANTILE STORE UNDER USE GROUP 6 AND INSTALL NEW COMMERCIAL KITCHEN EXHAUST SYSTEM, HOOD AND DUCTWORK FOR FIRE SYSTEM . NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00874775-I1
05/17/2023
Filed — Alteration
B00874776-I1
08/22/2022
Violation issued (FDNY_NOV, closed)
02/24/2022
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
A
11/21/2017
Violation issued (HPD, closed)
I
11/07/2016
Violation issued (HPD, closed)
I
10/08/2015
Violation issued (HPD, closed)
I
02/18/2015
Violation issued (HPD, closed)
I
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/1998
Violation issued (ECB, closed)
Boilers
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTWIN POWER HEATING COOLIN12/19/2024
DOB NOWPlumbingPermit IssuedKATAN P & H INC07/17/2023
DOB NOWGeneral ConstructionPermit IssuedSIDEEN INTERIOR DECORATIO07/14/2023
BISOTISSUEDMAR REFRIGERATION INC08/13/2007
1 project · most recent 05/17/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/17/2023Permit IssuedSIDEEN INTERIOR DECORATIOVentilation Systems
Ventilation
Toolots & Breidert CaptiveAire ACM-NCA18FA 5,500 CFM ×2
1 project · most recent 02/03/2023
General Wiring
FiledStatusContractorScope
02/03/2023Permit IssuedGOLDMAN ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/23/2024Interior lighting powerTALAL ALOKUSHenergy_progress
10/21/2024HVAC-R and service water heating equipmentTALAL ALOKUSHenergy_progress
10/21/2024HVAC-R and service water piping design and insulationTALAL ALOKUSHenergy_progress
10/21/2024HVAC-R and service water heating system controlsTALAL ALOKUSHenergy_progress
10/21/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/18/2024FinalNAVEEN KUMARprogress
10/18/2024Mechanical SystemsYounes Abouyaalaspecial
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00874776-I1Request digital key ↗
08/23/2026B01129534-I1Request digital key ↗
08/15/2026B00874775-I1Request digital key ↗
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION2
08/13/2007310006454Open ↗
08/13/2007310006454Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature5
08/23/2026B01129534-I1Open ↗
08/23/2026B01129534-I1Open ↗
08/23/2026B01129534-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00874776-I1Open ↗
08/23/2026B01129534-I1Open ↗
08/13/2026B00874775-I1Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
08/17/2007310006454Open ↗
08/10/2007310006454Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/10/2007310006454Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/10/2007310006454Open ↗
▸BISPC FULL REPORT1
08/10/2007310006454Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01129534-I1Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS2
08/21/2007310006454Open ↗
08/20/2007310006454Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/21/2007310006454Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00874776-I1Open ↗
08/23/2026B01129534-I1Open ↗
08/13/2026B00874775-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/10/2007310006454Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/21/2007310006454Open ↗
08/17/2007310006454Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/10/2007310006454Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/13/2007310006454Open ↗