← Back
Primarily 5-6 family with 1 store or office
1621 CROSBY AVENUE
BRONX · BIN 2046047
💬 Discuss this project
1931Year Built
3Stories
S5Building Class
R7-1Zoning
6,135 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: JOEFRANK LLC · 3,590 sf lot · 1.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PELHAM BAY PARTNERS807/08/2026
JOEFRANK LLC103/22/2026
JJS BUILDERS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/06/2024$1.4M—PELHAM BAY PARTNERS, LLC → JOEFRANK LLC$228/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.207/12/2022
GREEN DESIGN104/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATLANTIC BUILDING SUPPLY INC.203/21/2026
NEW YORK ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJS BUILDERSGeneral Contractor303/21/2026
TIDAL PLUMBING & HTG LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851207/12/2022
Building Lifecycle
All (39)Filed (3)Permit Issued (2)Signed Off (3)Violation (21)Inspection (3)Special Inspection (7)
04/30/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/05/2025
Violation issued (HPD, closed)
A
06/13/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2024
Signed off — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER.
X00757557-I1
05/17/2024
Signed off — Alteration
X00152280-I1
05/17/2024
Signed off — Alteration
X00757631-I1
03/16/2024
Violation issued (HPD, closed)
A
03/16/2024
Violation issued (HPD, closed)
A
03/16/2024
Violation issued (HPD, closed)
B
03/16/2024
Violation issued (HPD, closed)
C
03/16/2024
Violation issued (HPD, closed)
B
01/21/2024
Violation issued (HPD, closed)
A
01/21/2024
Violation issued (HPD, closed)
A
01/21/2024
Violation issued (HPD, closed)
A
01/21/2024
Violation issued (HPD, closed)
B
01/21/2024
Violation issued (HPD, closed)
B
01/21/2024
Violation issued (HPD, closed)
B
01/21/2024
Violation issued (HPD, closed)
B
01/21/2024
Violation issued (HPD, closed)
B
01/21/2024
Violation issued (HPD, closed)
A
01/21/2024
Violation issued (HPD, closed)
B
01/21/2024
Violation issued (HPD, closed)
B
09/22/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/21/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2022
Permit issued — Boiler Equipment
X00757631-I1-BE
07/20/2022
Permit issued — Plumbing
X00757557-I1-PL
07/12/2022
Filed — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER.
X00757557-I1
07/12/2022
Filed — Alteration
X00757631-I1
07/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
07/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
07/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
07/11/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
06/15/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
06/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
06/14/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
04/10/2019
Filed — Alteration
X00152280-I1
11/19/2016
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offTIDAL PLUMBING & HTG LLC07/20/2022
DOB NOWPlumbingSigned-offTIDAL PLUMBING & HTG LLC07/20/2022
1 project · most recent 04/10/2019
FiledStatusContractorScope
04/10/2019CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2022Pass-Final Boiler Equipment InspectionPassView ↗
09/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/11/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
07/11/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/11/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/11/2022Maintenance informationLOUIS ARENAenergy_progress
06/15/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
06/15/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/14/2022Heating SystemsLOUIS ARENAspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/24/2026X00757557-I1Request digital key ↗
08/24/2026X00757631-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00152280-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026X00152280-I1Open ↗
08/24/2026X00757557-I1Open ↗
08/24/2026X00757631-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026X00757631-I1Open ↗
09/23/2026X00757631-I1Open ↗
08/22/2026X00757557-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X00757631-I1Open ↗
08/22/2026X00757557-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00757557-I1Open ↗
08/24/2026X00757631-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00757631-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00757631-I1Open ↗