← Back
Primarily 5-6 family with 1 store or office
1623 2 AVENUE
MANHATTAN · BIN 1048738
💬 Discuss this project
1920Year Built
4Stories
S5Building Class
C1-9Zoning
6,300 sfGross Floor Area
7Units
Rent Stabilized8 Open Violations 6 unresolved · 2 paperwork only ▸
Primarily 5-6 family with 1 store or office · Owner of record: NR SECOND AVENUE/EAST 47TH STREET LLC · 2,042 sf lot · 3.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Floor 14p · 4 filings · 20 docs
Cellar13p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NRP LLC I1407/08/2026
EMMES1707/08/2026
NR SECOND AVENUE/EAST 47TH STREET LLC803/22/2026
NR SECOND AV 47TH ST403/22/2026
NR SECOND AVENUE/4TH STRE203/22/2026
NR SECOND AVENUE/EAST 4TH103/22/2026
OWNEROF 1623 AVE103/22/2026
TASCO MANAGEMENT CORP203/21/2026
EMMES ASSET MGT203/21/2026
EMMES REALTY SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K A INTERIOR DESIGN1603/21/2026
RIP CC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILT NYG INCGeneral Contractor1207/08/2026
EDGE RENOVATION LLCGeneral Contractor1207/08/2026
FRANCIS RICHARDSElectrical203/21/2026
CHARLES, ANDELLElectrical103/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
DOROWSKY, HARRYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373709/28/2022
JIAN ENGINEERING PLLC7397101/28/2022
MW PROFESSIONAL ENGINEERI570101/28/2022
METRIC CONSULTING AND INS1803511/17/2021
Building Lifecycle
All (129)Filed (14)Permit Issued (14)Signed Off (5)Violation (56)Inspection (10)Special Inspection (30)
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/16/2024
Violation issued (ECB, open)
Boilers
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2024
Violation issued (HPD, closed)
A
02/02/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/11/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/20/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/15/2023
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/06/2022
Signed off — Alteration
INTERIOR RENOVATION IN CELLAR AND 1ST FLOOR, INSTALL NEW FLOOR TILES, DROP CEILING, MINOR PARTITIONS, REMOVE AND INSTALL NEW RAMP AND STEPS, REPLACE STOREFRONT. NO CHANGE IN USE, OCCUPANCY AND EGRESS. ALL RELATED WORK TO BE FILED SEPARATLY.
M00634589-I1
10/04/2022
Signed off — Alteration
INSTALL NEW KITCHEN HOOD AND ASSOCIATED DUCT ON 1ST FLOOR, CONNECT TO EXISTING EXHAUST DUCT AND BLOWER. INSTALL NEW ELECTRIC HVAC, WALK IN COOLER AND WALK IN FREEZER. ALL RELATED WORK TO BE FILED SEPARATELY.
M00634597-I1
10/03/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/28/2022
Filed — Alteration
INSTALL NEW KITCHEN HOOD AND ASSOCIATED DUCT ON 1ST FLOOR, CONNECT TO EXISTING EXHAUST DUCT AND BLOWER. INSTALL NEW ELECTRIC HVAC, WALK IN COOLER AND WALK IN FREEZER. ALL RELATED WORK TO BE FILED SEPARATELY.
M00634597-P1
09/28/2022
Special inspection requirement — Duct leakage testing, insulation and design
KY FU
09/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
09/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
09/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
09/28/2022
Special inspection requirement — Energy Code Compliance Inspections
KY FU
09/28/2022
Special inspection requirement — Final
KY FU
09/28/2022
Special inspection requirement — Mechanical Systems
KY FU
09/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
09/28/2022
Special inspection requirement — Air barrier - visual inspection
KY FU
09/28/2022
Special inspection requirement — Insulation placement and R values
KY FU
09/28/2022
Special inspection requirement — Fenestration areas
KY FU
09/28/2022
Special inspection requirement — Exterior lighting power
KY FU
09/28/2022
Special inspection requirement — Interior lighting power
KY FU
09/28/2022
Special inspection requirement — Lighting controls
KY FU
09/28/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
09/28/2022
Special inspection requirement — Energy Code Compliance Inspections
KY FU
09/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
09/27/2022
Filed — Alteration
INTERIOR RENOVATION IN CELLAR AND 1ST FLOOR, INSTALL NEW FLOOR TILES, DROP CEILING, MINOR PARTITIONS, REMOVE AND INSTALL NEW RAMP AND STEPS, REPLACE STOREFRONT. NO CHANGE IN USE, OCCUPANCY AND EGRESS. ALL RELATED WORK TO BE FILED SEPARATLY.
M00634589-P1
08/28/2022
Special inspection requirement — Energy Code Compliance Inspections
KY FU
08/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
08/28/2022
Special inspection requirement — Energy Code Compliance Inspections
KY FU
08/28/2022
Special inspection requirement — Air barrier - visual inspection
KY FU
08/28/2022
Special inspection requirement — Fenestration areas
KY FU
08/28/2022
Special inspection requirement — Insulation placement and R values
KY FU
08/28/2022
Special inspection requirement — Lighting controls
KY FU
08/28/2022
Special inspection requirement — Interior lighting power
KY FU
08/28/2022
Special inspection requirement — Exterior lighting power
KY FU
08/28/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
08/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
08/28/2022
Special inspection requirement — Mechanical Systems
KY FU
08/28/2022
Special inspection requirement — Final
KY FU
08/26/2022
Signed off — Alteration
INSTALL 8 FEET HIGH TEMPORARY CONSTRUCTION FENCE AS PER PLAN, FILED IN CONJUNCTION WITH JOB# M00634589, #M00634597,#M00634599.
M00634606-I1
08/23/2022
Signed off — Alteration
M00634599-I1
07/27/2022
Signed off — Alteration
M00658397-I1
07/22/2022
Permit issued — Structural
M00658397-I1-ST
06/16/2022
Filed — Alteration
M00634599-P2
06/13/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/24/2022
Permit issued — Mechanical Systems
M00634597-I1-MS
04/25/2022
Permit issued — General Construction
M00634589-I1-GC
03/25/2022
Filed — Alteration
M00634599-P1
03/23/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBUILT NYG INC07/22/2022
DOB NOWMechanical SystemsSigned-offBUILT NYG INC05/24/2022
DOB NOWGeneral ConstructionSigned-offBUILT NYG INC04/25/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC01/26/2022
DOB NOWMechanical SystemsSigned-offBUILT NYG INC01/25/2022
DOB NOWConstruction FenceSigned-offBUILT NYG INC01/25/2022
DOB NOWGeneral ConstructionSigned-offBUILT NYG INC01/25/2022
DOB NOWMechanical SystemsPermit IssuedEDGE RENOVATION LLC11/22/2021
DOB NOWStructuralPermit IssuedEDGE RENOVATION LLC11/16/2021
DOB NOWGeneral ConstructionPermit IssuedEDGE RENOVATION LLC11/15/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC07/12/2021
DOB NOWStructuralPermit IssuedEDGE RENOVATION LLC05/28/2021
DOB NOWGeneral ConstructionPermit IssuedEDGE RENOVATION LLC05/28/2021
DOB NOWMechanical SystemsPermit IssuedEDGE RENOVATION LLC05/28/2021
BISOTISSUEDAPPROVED OIL CO BROOKLYN10/04/2017
BISPLISSUEDBELL FUEL OIL, LLC10/04/2017
BISFPISSUEDDUNHAM PINING HEAT CORP11/24/2003
BISPLISSUEDFIREBALL PIPING & HTG CORP08/30/2000
BISOTISSUEDJ & M INDUSTRIES INC06/27/2000
BISEQISSUEDSPRING ENTERPRIS INC.05/31/2000
BISPLISSUEDWAGNER-WEINTHRAUB PLUMBING&HEATI05/22/1997
BISMHISSUEDCAK CONSTRUCTION05/14/1997
BISFPISSUEDSAFETY CONSULTANTS,INC.09/18/1991
1 project · most recent 03/09/2021
Gas Water/Sanitary
FiledStatusContractorScope
03/09/2021Signed-offORBIT PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 03/14/2022
General Wiring
FiledStatusContractorScope
03/14/2022Permit IssuedALL AROUND ELECTRIC CORP.General Wiring
1 project · most recent 03/23/2021
Steel
FiledStatusContractorScope
03/23/2021Permit IssuedEDGE RENOVATION LLCSteel
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2024Pass-Final PL - UndergroundPassView ↗
01/11/2024Pass-Final PL - UndergroundPassView ↗
11/20/2023Pass-Final PL - UndergroundPassView ↗
11/15/2023Fail-Final PL - UndergroundFailView ↗
10/03/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/13/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
09/28/2022Duct leakage testing, insulation and designKY FUenergy_progress
09/28/2022HVAC-R and service water heating equipmentKY FUenergy_progress
09/28/2022HVAC-R and service water heating system controlsKY FUenergy_progress
09/28/2022HVAC-R and service water piping design and insulationKY FUenergy_progress
09/28/2022Energy Code Compliance InspectionsKY FUprogress
09/28/2022FinalKY FUprogress
09/28/2022Mechanical SystemsKY FUspecial
09/28/2022Fire-Resistant Penetrations and JointsKY FUspecial
09/28/2022Air barrier - visual inspectionKY FUenergy_progress
09/28/2022Insulation placement and R valuesKY FUenergy_progress
09/28/2022Fenestration areasKY FUenergy_progress
09/28/2022Exterior lighting powerKY FUenergy_progress
09/28/2022Interior lighting powerKY FUenergy_progress
09/28/2022Lighting controlsKY FUenergy_progress
09/28/2022Fenestration and door U-factor and product ratingsKY FUenergy_progress
09/28/2022Energy Code Compliance InspectionsKY FUprogress
09/28/2022Fire-Resistant Penetrations and JointsKY FUspecial
08/28/2022Energy Code Compliance InspectionsKY FUprogress
08/28/2022Fire-Resistant Penetrations and JointsKY FUspecial
08/28/2022Energy Code Compliance InspectionsKY FUprogress
08/28/2022Air barrier - visual inspectionKY FUenergy_progress
08/28/2022Fenestration areasKY FUenergy_progress
08/28/2022Insulation placement and R valuesKY FUenergy_progress
08/28/2022Lighting controlsKY FUenergy_progress
08/28/2022Interior lighting powerKY FUenergy_progress
Latest 25 of 51.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch9
09/03/2026M00634606-I1Request digital key ↗
09/03/2026M00634599-P2Request digital key ↗
09/03/2026M00634599-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00460476-I1Request digital key ↗
09/03/2026M00460476-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026M00466285-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00463099-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00466215-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
10/05/2017123139647Open ↗
10/05/2017123139647Open ↗
10/05/2017123139647Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/05/2017123139647Open ↗
10/05/2017123139647Open ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature35
09/21/2026M00634589-I1Open ↗
09/21/2026M00634589-I1Open ↗
09/21/2026M00634589-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/21/2026M00634589-I1Open ↗
09/02/2026M00466285-I1Open ↗
09/02/2026M00466285-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/04/2026M00466215-I1Open ↗
09/04/2026M00466285-I1Open ↗
09/03/2026M00634606-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/05/2017123139647Open ↗
10/05/2017123139647Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/05/2017123139647Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/05/2017123139647Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
10/05/2017123139647Open ↗
10/05/2017123139647Open ↗
10/05/2017123139647Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/05/2017123139647Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/05/2017123139647Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/04/2026M00466215-I1Open ↗
09/04/2026M00466285-I1Open ↗
09/03/2026M00634599-P2Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/05/2017123139647Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/05/2017123139647Open ↗
10/05/2017123139647Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00634589-I1Open ↗
08/13/2026M00634597-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/05/2017123139647Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/05/2017123139647Open ↗