← Back
One story - permanent living quarter
1625 NORMAN STREET
QUEENS · Ridgewood · BIN 4085729
💬 Discuss this project
1930Year Built
1Stories
A2Building Class
R5BZoning
721 sfGross Floor Area
1Units
0 Open Violations
One story - permanent living quarter · 2,500 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
StructuralMechanicalFire Protection
Roof2p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar4p · 4 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAS PE CONSULTING ENGINEERS205/06/2024
FABIAN CRUZ PE PLLC304/24/2024
GERALD CALIENDO ARCHITECTS111/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J CALIENDO ARCHITECT603/21/2026
Building Lifecycle
All (46)Filed (6)Violation (1)Objection (25)Special Inspection (14)
08/27/2025
Objection resolved — Addressed
08/27/2025
Objection resolved — Addressed
11/22/2024
Objection raised — Other
11/22/2024
Objection raised — Other
11/14/2024
Objection resolved — Addressed
11/14/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Other
07/18/2024
Objection resolved — Addressed
07/18/2024
Objection resolved — Addressed
07/18/2024
Objection resolved — Addressed
07/18/2024
Objection resolved — Addressed
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/18/2024
Special inspection requirement — Sprinkler Systems
07/18/2024
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
07/18/2024
Special inspection requirement — Post-installed Anchors
05/22/2024
Objection resolved — Addressed
05/21/2024
Objection resolved — Addressed
05/16/2024
Objection raised — Scope
05/16/2024
Objection raised — Inspections
05/16/2024
Objection resolved — Addressed
05/15/2024
Objection raised — Inspections
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection raised — Scope
05/15/2024
Objection raised — Energy
05/15/2024
Objection raised — Scope
05/06/2024
Filed — Alteration CO
HEREWITH FILING FOR A CONVERSION OF A ONE STORY WITH CELLAR, ONE FAMILY BUILDING INTO A TWO (2) STORY WITH CELLAR, TWO (2) FAMILY BUILDING AND OBTAIN NEW CofO. THE ALTERATION INCLUDES PARTIAL DEMOLITION, NEW SECOND FLOOR AND NEW ROOF.
Q00895476-S2
05/06/2024
Filed — Alteration CO
HEREWITH FILING FOR A CONVERSION OF A ONE STORY WITH CELLAR, ONE FAMILY BUILDING INTO A TWO (2) STORY WITH CELLAR, TWO (2) FAMILY BUILDING AND OBTAIN NEW CofO. THE ALTERATION INCLUDES PARTIAL DEMOLITION, NEW SECOND FLOOR AND NEW ROOF.
Q00895476-S3
05/06/2024
Objection raised — Fire_Protection
05/06/2024
Objection raised — Inspections
05/06/2024
Objection raised — Scope
05/06/2024
Objection raised — Scope
04/26/2024
Special inspection requirement — Structural Wood Frame
04/24/2024
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR A 2-STORY 2-FAMILY DWELLING IN CONJUNCTION WITH Q00895476-I1.
Q01040748-I1
04/24/2024
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR A TWO STORY, TWO FAMILY DWELLING IN CONJUNCTION WITH Q00895476-I1.
Q01040732-I1
04/23/2024
Special inspection requirement — Sprinkler Systems
04/15/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR A 3-STORY 2-FAMILY BUILDING IN CONJUNCTION WITH Q00895476-I1.
Q01005063-I1
03/14/2024
Special inspection requirement — Subgrade Inspections
03/14/2024
Special inspection requirement — Concrete - Cast-In-Place
03/14/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
11/14/2023
Filed — Alteration CO
HEREWITH FILING FOR A CONVERSION OF A ONE STORY WITH CELLAR, ONE FAMILY BUILDING INTO A TWO (2) STORY WITH CELLAR, TWO (2) FAMILY BUILDING AND OBTAIN NEW CofO. THE ALTERATION INCLUDES PARTIAL DEMOLITION, NEW SECOND FLOOR AND NEW ROOF.
Q00895476-I1
11/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/10/2023
Special inspection requirement — Final
10/10/2023
Special inspection requirement — Final
10/10/2023
Special inspection requirement — Footing and Foundation
03/11/2005
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 04/15/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2024——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM048GSS5 54,000 BTU · Vrf Outdoor ×2
ARUM036GSS5 42,000 CFM · Vrf Outdoor ×1
Ventilation
Greenheck GB SERIES 600 CFM · Exhaust Fan ×2
1 project · most recent 04/24/2024
FiledStatusContractorScope
04/24/2024———
1 project · most recent 04/24/2024
Water/Sanitary
FiledStatusContractorScope
04/24/2024——Water/Sanitary
1 project · most recent 05/06/2024
Wood
FiledStatusContractorScope
05/06/2024——Wood
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/18/2024Fire-Resistant Penetrations and Joints—special
07/18/2024Sprinkler Systems—special
07/18/2024Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
07/18/2024Post-installed Anchors—special
04/26/2024Structural Wood Frame—progress
04/23/2024Sprinkler Systems—special
03/14/2024Subgrade Inspections—special
03/14/2024Concrete - Cast-In-Place—special
03/14/2024Subsurface Investigations (Borings/Test Pits)—special
11/14/2023Structural Stability – Alterations of existing buildings—special
11/14/2023Structural Stability – Alterations of existing buildings—special
10/10/2023Final—progress
10/10/2023Final—progress
10/10/2023Footing and Foundation—progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026Q00895476-S3Request digital key ↗
08/23/2026Q00895476-S2Request digital key ↗
08/23/2026Q00895476-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00895476-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00895476-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q00895476-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q00895476-S3Open ↗
08/23/2026Q00895476-S2Open ↗
08/23/2026Q00895476-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00895476-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00895476-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00895476-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00895476-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/23/2026Q00895476-S2Open ↗
08/23/2026Q00895476-S3Open ↗
08/23/2026Q00895476-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00895476-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00895476-S2Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram2
08/13/2026Q00895476-S2Open ↗
08/13/2026Q00895476-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026Q00895476-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00895476-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00895476-I1Open ↗