← Back
BuildNYC
One story - permanent living quarter
1625 NORMAN STREET
QUEENS · Ridgewood · BIN 4085729
💬 Discuss this project
1930Year Built
1Stories
A2Building Class
R5BZoning
721 sfGross Floor Area
1Units
0 Active Violations
One story - permanent living quarter · 2,500 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFoundation and structure construction1 filing · 20 docs
Floor 3Foundation and structure construction2 filings · 20 docs
Floor 2Foundation and structure construction4 filings · 20 docs
Floor 1Foundation and structure construction4 filings · 20 docs
CellarFoundation and structure construction4 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAS PE Consulting Engineers205/06/2024
Fabian Cruz PE304/24/2024
Gerald Caliendo Architects111/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gerald J Caliendo Architect603/21/2026
Building Lifecycle
08/27/2025
Objection resolved — Addressed
11/22/2024
Objection raised — Other
11/14/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Other
07/18/2024
Objection resolved — Addressed
36 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 04/15/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
04/15/2024——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 04/24/2024
FiledStatusContractorScope
04/24/2024———
1 project · most recent 04/24/2024
Water/Sanitary
FiledStatusContractorScope
04/24/2024——Water/Sanitary
1 project · most recent 05/06/2024
Wood
FiledStatusContractorScope
05/06/2024——Wood
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/18/2024Sprinkler Systems—special
07/18/2024Fire-Resistant Penetrations and Joints—special
07/18/2024Post-installed Anchors—special
07/18/2024Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
04/26/2024Structural Wood Frame—progress
04/23/2024Sprinkler Systems—special
03/14/2024Subsurface Investigations (Borings/Test Pits)—special
03/14/2024Concrete - Cast-In-Place—special
03/14/2024Subgrade Inspections—special
11/14/2023Structural Stability – Alterations of existing buildings—special
11/14/2023Structural Stability – Alterations of existing buildings—special
10/10/2023Final—progress
10/10/2023Footing and Foundation—progress
10/10/2023Final—progress
29 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account