← Back
Walk-up apt, over six families with stores
1626 2 AVENUE
MANHATTAN · Upper East Side-Yorkville · BIN 1049952
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
C1-9Zoning
7,950 sfGross Floor Area
9Units
Rent Stabilized20 Open Violations 13 unresolved · 7 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 1626 SECOND AVENUELLC · 1,950 sf lot · 4.08 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 51p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 13p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PECORA GROUP DEVELOPMENT, LLC1007/08/2026
MY FRIEND CONSTRUCTION2703/22/2026
1626 SECOND AVENUELLC2303/22/2026
1626 2 AVENUE LLC803/22/2026
NEW YORK STANDARD MECH CO103/22/2026
BOROUGH CONSTRUCTION GROU203/22/2026
MX FREUD CONSTRUCTION LLC103/22/2026
MY FREUD CONSTRUCTION LLC203/22/2026
1626 2ND AVE3303/22/2026
1626 SECOND AVE LLC1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS DESIGNS906/03/2025
PRUDIGM ENGINEERING LLC102/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NAGAN EX CONSULTANTS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTER 2 PLBG & HTG INCPlumbing207/08/2026
NEW YORK STANDARD MECH CORPPlumbing207/08/2026
MLS ELECTRIC LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JLS DESIGNS1377407/20/2021
Building Lifecycle
All (98)Filed (10)Permit Issued (4)Signed Off (2)Violation (60)Inspection (8)Objection (12)Special Inspection (2)
03/31/2026
Violation issued (ECB, closed)
Boilers
03/31/2026
Violation issued (ECB, open)
Boilers
10/09/2025
Signed off — Alteration
relocation of plumbing fixtures, and installation a 4 new fixtures
M00193919-I1
09/23/2025
Signed off — Alteration
plumbing modifications at cellar to address ecb violations 39032911K;39032910Z;39032912M;39032909L
M00484003-I1
09/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/03/2025
Filed — Alteration
relocation of plumbing fixtures, and installation a 4 new fixtures
M00193919-P4
05/22/2025
Violation issued (HPD, open)
A
05/22/2025
Violation issued (HPD, open)
B
05/15/2025
Permit issued — Plumbing
M00484003-I1-PL
04/07/2025
Permit issued — Plumbing
M00193919-I1-PL
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/17/2023
Violation issued (ECB, closed)
Boilers
11/10/2022
Violation issued (HPD, open)
B
11/10/2022
Violation issued (HPD, open)
C
11/10/2022
Violation issued (HPD, closed)
C
09/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/24/2022
Permit issued — Plumbing
M00193919-I1-PL
08/18/2022
Filed — Alteration
relocation of plumbing fixtures, and installation a 4 new fixtures
M00193919-P3
07/14/2022
Violation issued (HPD, closed)
B
07/14/2022
Violation issued (HPD, open)
C
06/02/2022
Violation issued (ECB, closed)
Unknown
05/17/2022
Violation issued (ECB, closed)
Construction
05/17/2022
Violation issued (ECB, closed)
Construction
05/12/2022
Violation issued (HPD, closed)
C
05/12/2022
Violation issued (ECB, closed)
Boilers
05/10/2022
Violation issued (HPD, closed)
C
05/10/2022
Violation issued (HPD, closed)
C
05/02/2022
Violation issued (HPD, closed)
C
05/02/2022
Violation issued (HPD, closed)
C
04/23/2022
Violation issued (HPD, closed)
B
04/18/2022
Violation issued (HPD, closed)
C
04/13/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2022
Violation issued (HPD, closed)
C
02/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/16/2022
Filed — Alteration
M00668999-I1
02/15/2022
Violation issued (HPD, closed)
A
01/18/2022
Violation issued (ECB, closed)
Construction
01/18/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2021
Filed — Alteration
relocation of plumbing fixtures, and installation a 4 new fixtures
M00193919-P2
12/22/2021
Permit issued — Plumbing
M00193919-I1-PL
12/06/2021
Violation issued (HPD, open)
B
12/06/2021
Violation issued (HPD, closed)
B
12/06/2021
Violation issued (HPD, closed)
B
12/06/2021
Violation issued (HPD, closed)
C
11/18/2021
Violation issued (HPD, closed)
B
11/18/2021
Violation issued (HPD, closed)
B
11/18/2021
Violation issued (HPD, open)
B
11/18/2021
Violation issued (HPD, closed)
B
11/18/2021
Violation issued (HPD, closed)
B
11/01/2021
Violation issued (ECB, closed)
Construction
11/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/22/2021
Filed — Alteration
relocation of plumbing fixtures, and installation a 4 new fixtures
M00193919-P1
10/16/2021
Violation issued (HPD, closed)
B
10/16/2021
Violation issued (HPD, closed)
B
10/16/2021
Violation issued (HPD, closed)
B
10/16/2021
Violation issued (HPD, open)
B
10/16/2021
Violation issued (HPD, closed)
B
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC05/15/2025
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC04/07/2025
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP08/24/2022
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP12/22/2021
BISOTISSUEDMY FRIEND CONSTRUCTION LL10/31/2022
BIS—ISSUEDMY FRIEND CONSTRUCTION LL10/31/2022
BIS—ISSUEDBOROUGH CONSTRUCTION GROUP07/12/2022
BISOTISSUEDBOROUGH CONSTRUCTION GROUP07/12/2022
BISOTISSUEDBOROUGH CONSTRUCTION GROUP08/13/2021
BIS—ISSUEDBOROUGH CONSTRUCTION GROUP08/13/2021
BISOTISSUEDBOROUGH CONSTRUCTION GROUP08/13/2021
BISOTISSUEDMY FRIEND CONSTRUCTION LL06/14/2021
BIS—ISSUEDMY FRIEND CONSTRUCTION LL06/14/2021
BIS—ISSUEDMY FRIEND CONSTRUCTION LL11/30/2020
BISOTISSUEDMY FRIEND CONSTRUCTION LL11/20/2020
BISOTISSUEDMY FRIEND CONSTRUCTION LL07/13/2020
BISOTISSUEDMY FRIEND CONSTRUCTION LL07/10/2020
BISOTISSUEDMY FRIEND CONSTRUCTION LL10/25/2019
BIS—ISSUEDMY FRIEND CONSTRUCTION LL05/03/2019
BISBLISSUEDSENID PL & HTG CORP07/25/2016
BIS—ISSUEDCASA NOSTRA LLC10/05/2010
BISOTISSUEDCASA NOSTRA LLC04/19/2010
BISPLISSUEDPRECISION PLBG SVCS., INC10/27/2009
BISPLISSUEDPRECISION PLBG SVCS., INC10/23/2009
BISMHISSUEDCASA NOSTRA LLC10/14/2009
BISOTISSUEDCASA NOSTRA LLC10/09/2009
BISPLISSUEDTOP DOG PLBG & HTG CORP10/09/2008
BIS—ISSUEDCASA NOSTRA LLC05/19/2008
BISOTISSUEDPROMOCEANS10/24/2007
BIS—ISSUEDCASA NOSTRA LLC08/29/2006
BISOTISSUEDFORZA ITALIA10/01/2004
BISOTISSUEDFORZA ITALIA10/15/2002
BISMHISSUEDANTONIO & FRANK PECORA07/24/1996
BISOTISSUEDBARRY ROSENBERG ENTERPRISES12/04/1995
BISEQISSUEDSPRING ENTERPRISE, IN07/12/1995
BISOTRE-ISSUEDPOWERPHASE CONSTRUCTION CORP.03/23/1995
BISOTISSUEDM. RAHGO LANDSCAPING&HOME IMPROV10/20/1994
BISBLISSUEDHUNTS POINT FUEL CORP12/16/1992
5 projects · most recent 06/27/2024
General Wiring
FiledStatusContractorScope
06/27/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
01/14/2021Permit IssuedMLS ELECTRIC LLCGeneral Wiring
12/18/2020Permit IssuedMLS ELECTRIC LLCGeneral Wiring
12/19/2019Permit IssuedMLS ELECTRIC LLCGeneral Wiring
12/19/2019Permit IssuedMLS ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/04/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/22/2021Fire-Resistant Penetrations and JointsJOSEPH SULTANA, JRspecial
07/01/2021Fire-Resistant Penetrations and JointsJOSEPH SULTANA, JRspecial
▾Documents — 249 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00193919-P2Request digital key ↗
09/04/2026M00193919-I1Request digital key ↗
09/04/2026M00193919-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch5
09/03/2026M00484003-P1Request digital key ↗
09/03/2026M00484003-P3Request digital key ↗
09/03/2026M00484003-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits61
▸BISPLAN / WORK APPROVAL APPLICATION32
02/18/2026120157490Open ↗
02/06/2026120157490Open ↗
04/03/2025120157490Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION23
04/21/2025120157490Open ↗
10/31/2022104397145Open ↗
10/31/2022123879008Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWState DEC Permit5
09/04/2026M00193919-P2Open ↗
09/04/2026M00193919-I1Open ↗
09/04/2026M00193919-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
05/06/2024104397145Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
04/05/2024104397145Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00193919-P2Open ↗
09/04/2026M00193919-I1Open ↗
09/04/2026M00193919-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
10/29/2019123879008Open ↗
07/23/2019123879008Open ↗
07/06/2017123295692Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/06/2017123295692Open ↗
04/06/2016122733747Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/06/2017123295692Open ↗
04/06/2016122733747Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00484003-P2Open ↗
08/27/2026M00484003-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/02/2020140953378Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/02/2020140953378Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
05/21/2010120157490Open ↗
03/12/2010120157490Open ↗
03/12/2010120157490Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
08/24/2010120157490Open ↗
02/25/2010120157490Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/06/2017123295692Open ↗
09/25/2015120157490Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/18/2010120321008Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/11/2016122733747Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
02/12/2020123847025Open ↗
07/23/2019123879008Open ↗
07/06/2017123295692Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1 FORM (TENANT PROTECTION)1
10/13/2020104397145Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/04/2026M00193919-P1Open ↗
09/04/2026M00193919-I1Open ↗
09/04/2026M00193919-P4Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/02/2020140953378Open ↗
02/12/2020123847025Open ↗
09/16/2019123879008Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/20/2010120321008Open ↗
09/17/2009120157490Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/13/2020104397145Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/12/2020123847025Open ↗
10/29/2019123879008Open ↗
07/23/2019123879008Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/26/2022140953378Open ↗
10/06/2021140953378Open ↗
01/20/2021140953378Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/12/2023123879008Open ↗
08/02/2022140953378Open ↗
01/12/2021123847025Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
01/12/2023123879008Open ↗
07/27/2022140953378Open ↗
01/12/2021123847025Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/26/2022140953378Open ↗
10/06/2021140953378Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/11/2023123879008Open ↗
▸BISINTERIOR LIGHTING POWER1
07/27/2022140953378Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/02/2020140953378Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/15/2026120157490Open ↗
04/22/2024120157490Open ↗
07/26/2022140953378Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
08/21/2025120157490Open ↗
01/11/2023123879008Open ↗
07/27/2022140953378Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
01/23/2024104397145Open ↗
01/23/2024104397145Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
07/27/2022140953378Open ↗
01/12/2021123847025Open ↗
▸BISMECHANICAL SYSTEMS1
08/21/2025120157490Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/27/2022140953378Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSUPERSEDING LETTER5
10/31/2022123879008Open ↗
10/31/2022104397145Open ↗
08/13/2021104397145Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL4
08/21/2025120157490Open ↗
01/11/2023123879008Open ↗
07/27/2022140953378Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/12/2023123879008Open ↗
08/11/2022140953378Open ↗
01/12/2021123847025Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/20/2010120321008Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT12
01/11/2023123879008Open ↗
07/26/2022140953378Open ↗
07/25/2022140953378Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
04/14/2023104397145Open ↗
01/12/2023123879008Open ↗
07/27/2022140953378Open ↗
Showing 3 of 4 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST3
08/13/2021104397145Open ↗
08/13/2021140953378Open ↗
08/13/2021123879008Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
10/09/2009120157490Open ↗
▸Filing & Intake Forms29
▸BISBOROUGH INTAKE FORM14
04/21/2025120157490Open ↗
08/13/2021104397145Open ↗
08/13/2021140953378Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION8
09/27/2021123879008Open ↗
09/27/2021123879008Open ↗
03/25/2021104397145Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET6
12/02/2019123847025Open ↗
07/23/2019123879008Open ↗
07/05/2017123295692Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/02/2020140953378Open ↗
▸Other Documents19
▸DOB NOWDHCR Document10
09/04/2026M00193919-P1Open ↗
09/04/2026M00193919-P2Open ↗
09/04/2026M00193919-P1Open ↗
Showing 3 of 10 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
06/16/2022104397145Open ↗
09/27/2021123879008Open ↗
09/02/2021140953378Open ↗
Showing 3 of 6 on file for this type
▸BIS* FIRE STOPS 27-3451
01/23/2024104397145Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
01/23/2024104397145Open ↗
▸BISDHCR DOCUMENT1
10/23/2020140953378Open ↗