1626 52ND STREET
BROOKLYN · Borough Park · BIN 3129901
💬 Discuss this project
2022Year Built
3Stories
A7Building Class
R5Zoning
8,517 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Mansion type or town house · Owner of record: 1626 52nd Street · 4,407 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof86p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 388p · 2 filings · 20 docs
Floor 285p · 2 filings · 20 docs
Floor 1113p · 2 filings · 20 docs
Cellar51p · 2 filings · 20 docs
Site & exteriorSidewalk shed and pipe scaffolding installation24p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1626 52nd Street203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/19/2019$3.6M—BP 1626, LLC → 1626 52ND STREET LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lester Katz, Ncarb809/29/2025
Eyal Levitt Architect202/25/2025
Ashraf203/28/2023
HY PE Structural Engineering502/01/2022
Paul Perdek, Prof. Engineering406/09/2021
Revap Consulting Engineers103/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter Group2403/21/2026
AE Design Solution803/21/2026
BDF Design103/21/2026
Platinum Services NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1803/21/2026
Cityscape BuildersGeneral Contractor1007/08/2026
Core Scaffold SystemsScaffold603/21/2026
Park Premium EnterprisesGeneral Contractor507/08/2026
Cityscape BuildersScaffold504/09/2026
B&B Mechanical Plumbing & HeatingPlumbing407/08/2026
Lightforce Electrical Contng IElectrical203/22/2026
Park Premium EnterprisesScaffold204/09/2026
Design N SafetyScaffold203/21/2026
D & F Construction GroupGeneral Contractor203/22/2026
Target Piping NYFire Protection107/08/2026
V. Vass ElectricElectrical103/22/2026
Lester KatzElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91681209/29/2025
Metro Fire Control4538202/25/2025
Building Lifecycle
All (168)Filed (22)Permit Issued (26)Signed Off (9)Violation (2)Inspection (7)Objection (72)Special Inspection (30)
12/19/2025
Signed off — Alteration
B00485270-I1
12/19/2025
Signed off — Alteration
Installation of n sprinkler system hydraulically calculated in accordance with NFPA 13D modified by Appendix Q filed in conjunction with job# B00504231.
B00536960-I1
12/19/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH.
B00504231-S3
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Permit issued — Mechanical Systems
B00504231-I1-GC-CX
11/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
11/13/2025
Special inspection requirement — Fenestration areas
Soorjbally Harilall
11/13/2025
Special inspection requirement — Permanent certificate
Soorjbally Harilall
11/13/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
11/13/2025
Special inspection requirement — Final
Soorjbally Harilall
11/13/2025
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
11/13/2025
Special inspection requirement — Maintenance information
Soorjbally Harilall
11/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
11/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
11/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
11/13/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
11/13/2025
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
11/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
11/13/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
11/13/2025
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
11/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
11/11/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH.
B00504231-S2
11/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/10/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/04/2025
Objection resolved — Addressed
11/04/2025
Objection resolved — Addressed
10/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/30/2025
Objection resolved — Addressed
10/30/2025
Objection resolved — Addressed
10/30/2025
Objection resolved — Addressed
10/30/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/06/2025
Objection raised — Scope
10/06/2025
Objection raised — Scope
10/06/2025
Objection raised — Fire_Protection
10/06/2025
Objection raised — Scope
10/06/2025
Objection raised — Zoning
10/06/2025
Objection raised — Zoning
10/06/2025
Objection raised — Scope
09/29/2025
Filed — New Building
PLUMBING PLANS FILED HEREWITH.
B00504231-P8
09/25/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
09/25/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
09/25/2025
Special inspection requirement — Fenestration areas
Soorjbally Harilall
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
09/25/2025
Special inspection requirement — Permanent certificate
Soorjbally Harilall
09/25/2025
Special inspection requirement — Final
Soorjbally Harilall
09/25/2025
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/25/2025
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
09/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
09/25/2025
Special inspection requirement — Maintenance information
Soorjbally Harilall
09/03/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH.
B00504231-S5
08/29/2025
Permit issued — Curb Cut
B00504231-S2-CC
06/12/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/30/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Scope
05/20/2025
Filed — New Building
PLUMBING PLANS FILED HEREWITH.
B00504231-P7
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCityscape Builders11/14/2025
DOB NOWCurb CutSigned-offCityscape Builders08/29/2025
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY02/18/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/13/2025
DOB NOWSprinklersSigned-offTarget Piping NY12/27/2024
DOB NOWPlumbingSigned-offTarget Piping NY11/29/2024
DOB NOWConstruction FenceSigned-offCityscape Builders11/14/2024
DOB NOWMechanical SystemsPermit IssuedCityscape Builders11/14/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY02/20/2024
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY02/16/2024
DOB NOWPlumbingSigned-offTarget Piping NY12/01/2023
DOB NOWConstruction FenceSigned-offCityscape Builders11/13/2023
DOB NOWMechanical SystemsPermit IssuedCityscape Builders11/13/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY03/14/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY03/14/2023
DOB NOWConstruction FenceSigned-offCityscape Builders11/14/2022
DOB NOWStructuralSigned-offCityscape Builders11/14/2022
DOB NOWGeneral ConstructionPermit IssuedCityscape Builders11/14/2022
DOB NOWConstruction FenceSigned-offPark Premium Enterprises09/28/2022
DOB NOWGeneral ConstructionPermit IssuedPark Premium Enterprises01/20/2022
DOB NOWStructuralSigned-offPark Premium Enterprises11/04/2021
DOB NOWEarth WorkPermit IssuedPark Premium Enterprises11/04/2021
DOB NOWConstruction FenceSigned-offPark Premium Enterprises10/08/2021
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/18/2021
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/18/2021
DOB NOWConstruction FenceSigned-offDesign N Safety05/04/2021
1 project · most recent 09/29/2025
Air Conditioning Systems Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/29/2025Permit IssuedCityscape BuildersAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUHY-P72TNU-A 72,000 BTU · Vrf Outdoor ×8
MXZ-SM48NAM2 23 BTU · Heat Pump Outdoor ×2
PUHY-EP96TNU-A1 96,000 BTU · Vrf Outdoor ×2
PUHY-P144TNU-A 144,000 BTU · Vrf Outdoor ×2
PURY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×2
Ventilation
Nutone AEN50 50 CFM · Exhaust Fan ×48
AR130 100 CFM · Exhaust Fan ×4
Fantech DB4XLT 195 CFM · Exhaust Fan ×4
Cooling
Daikin 4MXS36NMVJU 36,000 BTU · Heat Pump Outdoor ×12
Heating
Daikin 4MXS36NMVJU 36,000 BTU · Heat Pump Outdoor ×12
Ducts & Piping
Nutone ×1
N/A NA 1 BTU · Ductwork ×1
1 project · most recent 09/29/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/29/2025Signed-offB&B Mechanical Plumbing & HeatingGas, Storm, Water/Sanitary
3 projects · most recent 12/25/2025
General Wiring
FiledStatusContractorScope
12/25/2025CompleteLightforce Electrical Contng IGeneral Wiring
02/22/2023CompleteIlluminous ElectricGeneral Wiring
05/17/2021CompleteV. Vass Electric—
1 project · most recent 09/29/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/29/2025Permit IssuedCityscape BuildersSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/12/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/06/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/11/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
11/13/2025HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
11/13/2025Mechanical SystemsSOORJBALLY HARILALLspecial
11/13/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
11/13/2025FinalSoorjbally Harilallprogress
11/13/2025Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
11/13/2025Energy Code Compliance InspectionsSoorjbally Harilallprogress
11/13/2025Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
11/13/2025Insulation placement and R valuesSoorjbally Harilallenergy_progress
11/13/2025HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
11/13/2025Air barrier - visual inspectionSoorjbally Harilallenergy_progress
11/13/2025Fenestration air leakageSoorjbally Harilallenergy_progress
11/13/2025Interior lighting powerSoorjbally Harilallenergy_progress
11/13/2025Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
11/13/2025Maintenance informationSoorjbally Harilallenergy_progress
11/13/2025Fenestration areasSoorjbally Harilallenergy_progress
11/13/2025HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
11/13/2025Permanent certificateSoorjbally Harilallenergy_progress
09/25/2025Mechanical SystemsSOORJBALLY HARILALLspecial
09/25/2025Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
09/25/2025Interior lighting powerSoorjbally Harilallenergy_progress
09/25/2025Maintenance informationSoorjbally Harilallenergy_progress
09/25/2025Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
09/25/2025HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
09/25/2025Permanent certificateSoorjbally Harilallenergy_progress
09/25/2025Fenestration areasSoorjbally Harilallenergy_progress
Latest 25 of 121.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026B00485270-I1Request digital key ↗
09/01/2026B00521860-P1Request digital key ↗
09/01/2026B00521860-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits5
▸BISBPP-5 - Authorization to the Department of Transportation2
01/13/2022340816807Open ↗
07/27/2021340816807Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
07/27/2021340816807Open ↗
03/11/2021322093603Open ↗
▸BISWORK PERMIT APPLICATION1
06/04/2021322093603Open ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWRestrictive Declaration/Easement 17
08/13/2026B00504231-S3Open ↗
08/13/2026B00504231-S5Open ↗
08/13/2026B00504231-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00504231-I1Open ↗
08/13/2026B00504231-P5Open ↗
08/13/2026B00504231-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00504231-I1Open ↗
08/13/2026B00504231-P5Open ↗
08/13/2026B00504231-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00504231-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00485270-I1Open ↗
09/01/2026B00521860-I1Open ↗
09/01/2026B00521860-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/29/2026B00504231-S3Open ↗
09/29/2026B00504231-S3Open ↗
09/02/2026B00504231-S4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/29/2026B00504231-S3Open ↗
09/02/2026B00504231-S4Open ↗
09/02/2026B00504231-S4Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/27/2021340816807Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/27/2021340816807Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00504231-P6Open ↗
08/13/2026B00504231-P8Open ↗
08/13/2026B00504231-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist4
08/31/2026B00504231-P6Open ↗
08/31/2026B00504231-I1Open ↗
08/15/2026B00504231-P5Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
01/13/2022340816807Open ↗
07/27/2021340816807Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/27/2021340816807Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/04/2021322093603Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/13/2022340816807Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00504231-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00504231-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00504231-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/04/2021322093603Open ↗
▸BISRODENT CONTROL1
06/04/2021322093603Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00504231-S3Open ↗
08/13/2026B00504231-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026B00504231-P2Open ↗
08/13/2026B00504231-P1Open ↗
08/13/2026B00504231-S4Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00504231-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00504231-S4Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLANDMARKS APPROVAL1
06/04/2021322093603Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/04/2021322093603Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
06/04/2021322093603Open ↗
03/11/2021322093603Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/27/2021340816807Open ↗
▸BISEFILING COVER SHEET1
03/11/2021322093603Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/27/2021340816807Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/13/2026B00504231-P5Open ↗
08/13/2026B00504231-P8Open ↗
08/13/2026B00504231-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00504231-P5Open ↗
08/13/2026B00504231-P6Open ↗
08/13/2026B00504231-P8Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
01/13/2022340816807Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/13/2022340816807Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/13/2022340816807Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00504231-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00504231-S4Open ↗