Two family brick
1626 SEDGWICK AVENUE
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R7-1Zoning
3,320 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸
Two family brick · Owner of record: 1626 SEDGWICK LLC · 3,025 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof14p · 2 filings · 20 docs
Penthouse43p · 2 filings · 20 docs
Floor 539p · 1 filing · 20 docs
Floor 439p · 2 filings · 20 docs
Floor 340p · 2 filings · 20 docs
Floor 246p · 2 filings · 20 docs
Floor 145p · 2 filings · 20 docs
Cellar42p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1626 SEDGWICK LLC103/22/2026
SKYWARD DEVELOPERS403/22/2026
EM TEE CAPITAL103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2022$875K—Private party → 1626 SEDGWICK LLC$264/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT708/06/2026
CHOSEN MEP, CORP.509/28/2023
FL&M ENGINEERING DESIGN &INSPECTION202/21/2023
SH ENGINEERING PLLC209/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2603/21/2026
GREEN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYWARD DEVELOPERS INCGeneral Contractor907/08/2026
TOVIA WERZBERGERElectrical803/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor204/09/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MOD CONSULTANTS LLCGeneral Contractor107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161308/06/2026
Building Lifecycle
All (136)Filed (16)Permit Issued (12)Signed Off (5)Violation (12)Inspection (15)Objection (46)Special Inspection (30)
08/25/2026
Objection resolved — Addressed
08/12/2026
Objection raised — C/O of existing property requi
08/06/2026
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB # X00591262-I1
X00591262-A1
07/09/2026
Violation issued (HPD, open)
C
06/05/2025
Violation issued (HPD, closed)
A
02/18/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/16/2024
Special inspection requirement — Metering
FAHAD FATEH
12/16/2024
Special inspection requirement — Masonry
FAHAD FATEH
12/16/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
12/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/16/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/16/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
12/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/16/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/16/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/16/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
12/16/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/16/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
12/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/16/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
12/16/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
12/16/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/09/2024
Violation issued (ECB, closed)
Unknown
07/05/2024
Permit issued — General Construction
X00591262-I1-GC
04/16/2024
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB # X00591262-I1
X00591262-P9
04/16/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
04/16/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/16/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/16/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
04/16/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/16/2024
Special inspection requirement — Masonry
FAHAD FATEH
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/16/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/16/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
03/22/2024
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB # X00591262-I1
X00591262-S2
03/04/2024
Signed off — Alteration
GENERAL CONSTRUCTION, FOUNDATION AND STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB # X00591262-I1
X00661731-I1
03/01/2024
Objection resolved — Addressed
02/19/2024
Objection resolved — Addressed
02/06/2024
Objection raised — Cost
02/06/2024
Objection raised — Fire_Protection
02/05/2024
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB # X00591262-I1
X00591262-P8
01/24/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/31/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/16/2023
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB # X00591262-I1
X00591262-S3
10/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/02/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/02/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/28/2023
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB # X00591262-I1
X00591262-P6
09/20/2023
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC JOB # X00591262-I1
X00591262-P7
09/14/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
08/31/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/31/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/29/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMOD CONSULTANTS LLC07/05/2024
DOB NOWMechanical SystemsSigned-offSKYWARD DEVELOPERS INC07/28/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC07/21/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC07/21/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC06/12/2023
DOB NOWPlumbingSigned-offA M B MECHANICAL INC03/27/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES02/02/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES02/02/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC01/25/2023
DOB NOWPlumbingSigned-offYG SERVICES INC11/15/2022
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC06/21/2022
DOB NOWStructuralSigned-offSKYWARD DEVELOPERS INC05/13/2022
BISOTISSUEDURENA CONST & DESIGN INC06/23/2020
1 project · most recent 08/06/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026Permit IssuedMOD CONSULTANTS LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RX12AXVJU 13,500 BTU · Split System ×9
RXSQ24TAVJU 25,800 BTU · Vrf Outdoor ×8
RX18AXVJU 21,600 BTU · Split System ×2
RX12BXVJU 13,500 BTU · Heat Pump Outdoor ×9
3MXS24WMVJU 25,800 BTU · Vrf Outdoor ×8
1 project · most recent 08/06/2026
Sprinkler System
FiledStatusContractorScope
08/06/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/06/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/06/2026Signed-offYG SERVICES INCStorm, Water/Sanitary
5 projects · most recent 02/10/2025
General Wiring
FiledStatusContractorScope
02/10/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
01/22/2025CompletePOWER DIRECT ELECTRIC INC—
12/23/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
01/30/2023CompleteSOLAS ELECTRICAL CORP—
12/31/2019Permit IssuedALL WAYS ELECTRIC CORP.W—
1 project · most recent 08/06/2026
Fence
FiledStatusContractorScope
08/06/2026Permit IssuedMOD CONSULTANTS LLCFence
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/18/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/24/2024Fail-Final CND-Occupancy InspectionFailView ↗
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2023Fail-Final CND-Occupancy InspectionFailView ↗
10/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/02/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/14/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/11/2023Fail-Final SP - Up to 3 Requested FloorsFailView ↗
08/31/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/31/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/24/2023Fail-Final CND-Occupancy InspectionFailView ↗
05/25/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/27/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 147
DateRequirementInspectorRole
12/16/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
12/16/2024Fenestration areasFAHAD FATEHenergy_progress
12/16/2024Lighting controlsFAHAD FATEHenergy_progress
12/16/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
12/16/2024MeteringFAHAD FATEHenergy_progress
12/16/2024Interior lighting powerFAHAD FATEHenergy_progress
12/16/2024Fenestration air leakageFAHAD FATEHenergy_progress
12/16/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/16/2024Exterior lighting powerFAHAD FATEHenergy_progress
12/16/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/16/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/16/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
12/16/2024Maintenance informationFAHAD FATEHenergy_progress
12/16/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
12/16/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/16/2024Post-installed AnchorsFAHAD FATEHspecial
12/16/2024MasonryFAHAD FATEHspecial
12/16/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/16/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
04/16/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
04/16/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/16/2024MasonryFAHAD FATEHspecial
04/16/2024Post-installed AnchorsFAHAD FATEHspecial
04/16/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/16/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 147.
▾Documents — 177 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/24/2026X00591262-P5Request digital key ↗
08/24/2026X00591262-P9Request digital key ↗
08/24/2026X00591262-P7Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
07/13/2023220239034Open ↗
10/06/2022240313709Open ↗
09/28/2022240313709Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/28/2022240313709Open ↗
02/28/2022240313709Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/05/2020220728452Open ↗
05/05/2020220728452Open ↗
▸BISWORK PERMIT APPLICATION1
06/23/2020220728452Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026X00591262-P3Open ↗
08/13/2026X00591262-I1Open ↗
08/13/2026X00591262-A1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00591262-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature21
09/30/2026X00661731-I1Open ↗
09/30/2026X00661731-I1Open ↗
09/30/2026X00661731-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/30/2026X00661731-I1Open ↗
09/30/2026X00661731-I1Open ↗
09/30/2026X00661731-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/24/2026X00591262-A1Open ↗
08/24/2026X00591262-P9Open ↗
08/24/2026X00591262-P8Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/12/2020220728452Open ↗
11/08/2012220239034Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/07/2022240313709Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026X00591262-P8Open ↗
08/13/2026X00591262-P9Open ↗
08/13/2026X00591262-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING1
11/08/2012220239034Open ↗
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist6
08/13/2026X00591262-P3Open ↗
08/13/2026X00591262-A1Open ↗
08/13/2026X00591262-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
02/28/2022240313709Open ↗
02/28/2022240313709Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
05/05/2020220728452Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/23/2022240313709Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00591262-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00591262-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00591262-P5Open ↗
08/24/2026X00591262-P6Open ↗
08/24/2026X00591262-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/12/2020220728452Open ↗
11/08/2012220239034Open ↗
11/08/2012220239034Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026X00591262-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/12/2020220728452Open ↗
06/23/2020220728452Open ↗
05/05/2020220728452Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/12/2020220728452Open ↗
11/08/2012220239034Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/12/2020220728452Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00591262-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/28/2022240313709Open ↗
11/12/2020220728452Open ↗
06/23/2020220728452Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026X00661731-P1Open ↗
08/13/2026X00661731-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00661731-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
11/08/2012220239034Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/23/2020220728452Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/23/2020220728452Open ↗
03/12/2020220728452Open ↗
11/08/2012220239034Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
03/12/2020220728452Open ↗
11/08/2012220239034Open ↗
▸BISADDITIONAL INFORMATION1
05/05/2020220728452Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/07/2022240313709Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/23/2022240313709Open ↗
▸Other Documents29
▸DOB NOWProperty Ownership Certification7
08/24/2026X00591262-P9Open ↗
08/24/2026X00591262-P7Open ↗
08/24/2026X00591262-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial6
08/13/2026X00591262-P9Open ↗
08/13/2026X00591262-P8Open ↗
08/13/2026X00591262-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026X00591262-P9Open ↗
08/13/2026X00591262-A1Open ↗
08/13/2026X00591262-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlot Diagram6
08/13/2026X00591262-P9Open ↗
08/13/2026X00591262-A1Open ↗
08/13/2026X00591262-P7Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/23/2022240313709Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00591262-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026X00661731-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00591262-I1Open ↗