← Back
QUEENS
Harvest Plaza Condominium
163-07 72 AVENUE · Pomonok-Electchester-Hillcrest · BIN 4623389
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof33p · 2 filings · 20 docs
Floor 538p · 3 filings · 20 docs
Floor 437p · 3 filings · 20 docs
Floor 337p · 3 filings · 20 docs
Floor 237p · 3 filings · 20 docs
Floor 143p · 5 filings · 20 docs
Cellar25p · 1 filing · 10 docs
Site & exterior2p · 2 filings · 5 docs
Filed — no permit issued5p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561104/03/2024
G ENGINEERING PC7778203/04/2020
Building Lifecycle
All (8)Inspection (8)
09/18/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/28/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/28/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/28/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/26/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/26/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/19/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.