← Back
Miscellaneous store building
163-10 CROSS BAY BOULEVARD
QUEENS · BIN 4448965
💬 Discuss this project
1978Year Built
1Stories
K9Building Class
R3-1Zoning
5,364 sfGross Floor Area
11Units
0 Open ViolationsFDNY Report ↗
Miscellaneous store building · Owner of record: 160-10 CROSS BAY LLC · 15,730 sf lot · 0.34 FAR built
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof3p · 3 filings · 17 docs
Floor 19p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BTU DELTA CONSTRUCTION307/08/2026
HBP REALTY303/22/2026
JOAN AURIEMMA CO-TRUSTEE103/22/2026
SEA FOODS INC103/22/2026
CARVEL303/21/2026
SHAH GROUP ENTERPRISES203/21/2026
AURIEMMA403/21/2026
KAUFMANS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWRENCE MAREK ARCHITECT206/03/2025
ZELTA DESIGN202/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHERICO KING ARCHITECT P C403/21/2026
EPAC BUILDING CONSULTING INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BTU DELTA CONSTRUCTION *General Contractor707/08/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHERICO KING ARCHITECT PC5674206/03/2025
ZELTA INSPECT LLC7764102/28/2022
Building Lifecycle
All (50)Filed (4)Permit Issued (4)Signed Off (4)Violation (8)Inspection (3)Special Inspection (27)
06/20/2025
Signed off — Alteration
DIRECT REPLACEMEN T OF AN EXISTING 12.5 TON ROOFTOP HVAC UNIT ON EXISTING DUNNAGE BEAM. OBTAIN A NEW COC. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01234404-I1
06/05/2025
Permit issued — Mechanical Systems
Q01234404-I1-MS
06/03/2025
Filed — Alteration
DIRECT REPLACEMEN T OF AN EXISTING 12.5 TON ROOFTOP HVAC UNIT ON EXISTING DUNNAGE BEAM. OBTAIN A NEW COC. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01234404-I1
06/01/2025
Special inspection requirement — Mechanical Systems
LAWRENCE MAREK
06/01/2025
Special inspection requirement — Energy Code Compliance Inspections
LAWRENCE MAREK
06/01/2025
Special inspection requirement — Final
LAWRENCE MAREK
06/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE MAREK
06/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE MAREK
06/01/2025
Special inspection requirement — Maintenance information
LAWRENCE MAREK
06/01/2025
Special inspection requirement — Shutoff dampers
LAWRENCE MAREK
06/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE MAREK
06/01/2025
Special inspection requirement — Ventilation and air distribution system
LAWRENCE MAREK
06/01/2025
Special inspection requirement — Duct leakage testing, insulation and design
LAWRENCE MAREK
07/17/2024
Signed off — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00686204-I1
07/16/2024
Signed off — Alteration
PLUMBING WORKS
Q00686218-I1
05/28/2024
Signed off — Alteration
Q01052839-I1
05/22/2024
Permit issued — Mechanical Systems
Q01052839-I1-MS
05/20/2024
Filed — Alteration
Q01052839-I1
05/16/2024
Special inspection requirement — Shutoff dampers
LAWRENCE MAREK
05/16/2024
Special inspection requirement — Energy Code Compliance Inspections
LAWRENCE MAREK
05/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
LAWRENCE MAREK
05/16/2024
Special inspection requirement — Maintenance information
LAWRENCE MAREK
05/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE MAREK
05/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE MAREK
05/16/2024
Special inspection requirement — Ventilation and air distribution system
LAWRENCE MAREK
05/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE MAREK
05/16/2024
Special inspection requirement — Final
LAWRENCE MAREK
05/16/2024
Special inspection requirement — Mechanical Systems
LAWRENCE MAREK
06/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/28/2023
Violation issued (FDNY_NOV, closed)
11/25/2022
Violation issued (ECB, closed)
Unknown
11/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/21/2022
Permit issued — General Construction
Q00686204-I1-GC
10/18/2022
Permit issued — Plumbing
Q00686218-I1-PL
02/28/2022
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00686204-I1
02/28/2022
Filed — Alteration
PLUMBING WORKS
Q00686218-I1
02/23/2022
Special inspection requirement — Final
ERIK LIEPINS
02/23/2022
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
02/23/2022
Special inspection requirement — Interior lighting power
ERIK LIEPINS
02/23/2022
Special inspection requirement — Maintenance information
ERIK LIEPINS
02/23/2022
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
02/23/2022
Special inspection requirement — Lighting controls
ERIK LIEPINS
02/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
05/27/2020
Violation issued (FDNY_NOV, closed)
07/01/2011
Violation issued (ECB, closed)
Construction
08/01/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/01/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/07/1990
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
06/24/1988
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBTU DELTA CONSTRUCTION *06/05/2025
DOB NOWMechanical SystemsSigned-offBTU DELTA CONSTRUCTION *05/22/2024
DOB NOWGeneral ConstructionSigned-offBTU DELTA CONSTRUCTION *10/21/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC10/18/2022
BISPLISSUEDSPARACO'S P&H CORP10/09/2018
BISEQISSUEDSHAH GROUP ENTERPRISES IN06/08/2017
BISOTISSUEDSHAH GROUP ENTERPRISES IN06/07/2017
BISPLISSUEDSPARACO'S P&H CORP01/30/2017
BISOTISSUEDCRAINE AIR CONDITIONING INC01/25/2017
BISPLISSUEDCLOVERDALE MASTER P&H INC10/06/2014
BISMHISSUEDINSTANT AIR CORP09/25/2014
BISPLISSUEDPROCORE MECHANICAL CORP02/12/2010
BISOTISSUEDCONTEMPORARY ENVIR. MGMT01/19/2010
BISEQISSUEDCONTEMPORARY ENVIR. MGMT01/19/2010
BISPLISSUEDPROCORE MECHANICAL CORP10/06/2008
BISOTISSUEDBROAD CHANNEL & WHYTE ARCHITECT10/02/2008
BISFPISSUEDFIRE COMMAND CO., INC11/28/2006
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM02/25/2002
BISPLISSUEDMAINLAND PLBG. & HTG. INC.03/23/2001
BISOTISSUEDH.G. CONTRUCTION12/26/2000
BIS—ISSUEDMAUCERI SIGN CO INC10/06/1993
BIS—ISSUEDMAUCERI SIGNS12/21/1990
BIS—ISSUEDMAUCERI SIGNS11/14/1990
BIS—ISSUEDMAUCERI SIGNS11/14/1990
BIS—ISSUEDMAUCERI SIGNS11/14/1990
BISEQISSUEDOZONE DEMOLITION CORP08/16/1990
BIS—ISSUEDOZONE DEMOLITION CORP08/16/1990
BISFPISSUEDFIRE COMMAND CO., INC.05/17/1990
2 projects · most recent 12/08/2022
General Wiring
FiledStatusContractorScope
12/08/2022CompleteUNITED ELEC'L CONT'G CORPGeneral Wiring
03/29/2019CompleteWILLDAN ELECTRICAL OF NY—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/01/2025Mechanical SystemsLAWRENCE MAREKspecial
06/01/2025Energy Code Compliance InspectionsLAWRENCE MAREKprogress
06/01/2025FinalLAWRENCE MAREKprogress
06/01/2025HVAC-R and service water heating system controlsLAWRENCE MAREKenergy_progress
06/01/2025HVAC-R and service water piping design and insulationLAWRENCE MAREKenergy_progress
06/01/2025Maintenance informationLAWRENCE MAREKenergy_progress
06/01/2025Shutoff dampersLAWRENCE MAREKenergy_progress
06/01/2025HVAC-R and service water heating equipmentLAWRENCE MAREKenergy_progress
06/01/2025Ventilation and air distribution systemLAWRENCE MAREKenergy_progress
06/01/2025Duct leakage testing, insulation and designLAWRENCE MAREKenergy_progress
05/16/2024Shutoff dampersLAWRENCE MAREKenergy_progress
05/16/2024Energy Code Compliance InspectionsLAWRENCE MAREKprogress
05/16/2024Duct leakage testing, insulation and designLAWRENCE MAREKenergy_progress
05/16/2024Maintenance informationLAWRENCE MAREKenergy_progress
05/16/2024HVAC-R and service water piping design and insulationLAWRENCE MAREKenergy_progress
05/16/2024HVAC-R and service water heating system controlsLAWRENCE MAREKenergy_progress
05/16/2024Ventilation and air distribution systemLAWRENCE MAREKenergy_progress
05/16/2024HVAC-R and service water heating equipmentLAWRENCE MAREKenergy_progress
05/16/2024FinalLAWRENCE MAREKprogress
05/16/2024Mechanical SystemsLAWRENCE MAREKspecial
02/23/2022FinalERIK LIEPINSprogress
02/23/2022Energy Code Compliance InspectionsERIK LIEPINSprogress
02/23/2022Interior lighting powerERIK LIEPINSenergy_progress
02/23/2022Maintenance informationERIK LIEPINSenergy_progress
02/23/2022Exterior lighting powerERIK LIEPINSenergy_progress
Latest 25 of 27.
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00686218-I1Request digital key ↗
08/26/2026Q00686204-I1Request digital key ↗
08/22/2026Q01052839-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits28
▸BISWORK PERMIT APPLICATION14
06/08/2017440408391Open ↗
05/27/2017440408391Open ↗
01/30/2017421407016Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
11/21/2018420107734Open ↗
08/21/2018420107734Open ↗
05/27/2017440408391Open ↗
Showing 3 of 13 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/08/2015420979338Open ↗
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/05/2017421407016Open ↗
12/07/2016421407016Open ↗
04/07/2015420979338Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/23/2026Q00686204-I1Open ↗
08/23/2026Q00686204-I1Open ↗
08/23/2026Q01234404-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/25/2017421407016Open ↗
05/17/2014420979338Open ↗
11/20/2009420107734Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026Q01052839-I1Open ↗
08/13/2026Q00686204-I1Open ↗
08/13/2026Q01234404-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026Q00686204-I1Open ↗
08/23/2026Q01234404-I1Open ↗
08/23/2026Q01052839-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/20/2009420107734Open ↗
10/01/2008410174190Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/27/2017440408391Open ↗
12/07/2016421407016Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/27/2017440408391Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/27/2017440408391Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING5
05/13/2010410191929Open ↗
11/20/2009420107734Open ↗
11/25/2008410174190Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
07/26/2017421407016Open ↗
04/05/2017421407016Open ↗
12/07/2016421407016Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
03/18/2015420979338Open ↗
02/08/2011410191929Open ↗
03/13/2009410174190Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/07/2016421407016Open ↗
01/22/2015420979338Open ↗
05/17/2014420979338Open ↗
▸BISEQUIPMENT USE PERMITS2
07/26/2017421407016Open ↗
04/08/2015420979338Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
12/07/2016421407016Open ↗
05/17/2014420979338Open ↗
10/01/2008410174190Open ↗
▸BISTenant Protection Plan and Notes2
12/07/2016421407016Open ↗
06/01/2017440408391Open ↗
▸Environmental & Asbestos6
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
11/20/2009420107734Open ↗
11/10/2008410191929Open ↗
10/01/2008410174190Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00686218-I1Open ↗
08/13/2026Q00686204-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/07/2016421407016Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/05/2017421407016Open ↗
12/07/2016421407016Open ↗
04/07/2015420979338Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/05/2017421407016Open ↗
04/08/2015420979338Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00686204-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/01/2017440408391Open ↗
05/27/2017440408391Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS5
12/07/2016421407016Open ↗
05/17/2014420979338Open ↗
11/20/2009420107734Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/26/2017421407016Open ↗
07/24/2017421407016Open ↗
04/05/2017421407016Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
06/01/2017440408391Open ↗
05/27/2017440408391Open ↗
04/05/2017421407016Open ↗
Showing 3 of 10 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
06/08/2017440408391Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET5
12/07/2016421407016Open ↗
05/17/2014420979338Open ↗
11/20/2009420107734Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/27/2017440408391Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
02/08/2011410191929Open ↗