← Back
BuildNYC
Two stories - detached, small or mid-size
163-12 108TH AVENUE
QUEENS · South Jamaica · BIN 4216555
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4-1Zoning
1,443 sfGross Floor Area
1Units
12 Active Violations 3 old, status unconfirmed ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRooftop solar installation1p · 1 filing · 12 docs
CellarUnder Construction4p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2024$475K—— → —$329/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Janha Building Ideas404/04/2026
Square Arch204/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kamtech Restoration403/21/2026
Janha Building Ideas203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kepler Electrical ContElectrical103/22/2026
Kamtech Restorationspecialty_contractor107/08/2026
LV Contracting SolutionsGeneral Contractor104/09/2026
All Pro Plumbing & HeatingPlumbing107/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Asr Engineering8404204/04/2026
Janha Building Ideas6129204/03/2026
Sq. Arch4802204/14/2025
Building Lifecycle
All (46)Filed (6)Permit Issued (3)Signed Off (1)Violation (21)Objection (6)Special Inspection (9)
07/24/2026
Permit issued — Plumbing
Q01191748-S1-PL
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUZ ZAMAN
04/04/2026
Filed — Alteration
INTERIOR RENOVATION AND ADDRESS VIOLATIONS AS PER PLAN.
Q01191748-P2
04/03/2026
Filed — Alteration
INTERIOR RENOVATION AND ADDRESS VIOLATIONS AS PER PLAN.
Q01191748-P1
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUZ ZAMAN
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
08/12/2025
Permit issued — General Construction
Q01191748-I1-GC
06/22/2025
Objection resolved — Addressed
05/15/2025
Objection raised — Cost
05/14/2025
Objection resolved — Addressed
05/11/2025
Filed — Alteration
INTERIOR RENOVATION AND ADDRESS VIOLATIONS AS PER PLAN.
Q01191748-S1
05/11/2025
Objection resolved — Addressed
05/05/2025
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01184950-I1
04/28/2025
Objection raised — Cost
04/28/2025
Objection raised — Admin
04/14/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01184950-P1
04/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
04/14/2025
Special inspection requirement — Final
Kaijin Liang
04/14/2025
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
03/25/2025
Filed — Alteration
INTERIOR RENOVATION AND ADDRESS VIOLATIONS AS PER PLAN.
Q01191748-I1
03/13/2025
Permit issued — Solar
Q01184950-I1-SL
02/21/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01184950-I1
01/24/2022
Violation issued (ECB, closed)
Construction
06/18/2021
Violation issued (ECB, open)
Construction
03/09/2021
Violation issued (ECB, open)
Construction
12/07/2020
Violation issued (ECB, open)
Construction
09/23/2020
Violation issued (ECB, closed)
Construction
11/04/2019
Violation issued (ECB, open)
Construction
09/16/2019
Violation issued (ECB, closed)
Construction
01/10/2019
Violation issued (ECB, closed)
Construction
01/10/2019
Violation issued (ECB, closed)
Construction
01/09/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/09/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/29/2018
Violation issued (ECB, closed)
Construction
11/28/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2018
Violation issued (ECB, open)
Construction
10/20/2018
Violation issued (ECB, open)
Construction
09/01/2018
Violation issued (ECB, open)
Construction
09/01/2018
Violation issued (ECB, open)
Construction
08/16/2018
Violation issued (HPD, open)
I
08/05/2018
Violation issued (HPD, open)
B
08/05/2018
Violation issued (ECB, open)
Construction
08/05/2018
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAll Pro Plumbing & Heating07/24/2026
DOB NOWGeneral ConstructionPermit IssuedLV Contracting Solutions08/12/2025
DOB NOWSolarSigned-offKamtech Restoration03/13/2025
1 project · most recent 04/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2026Permit IssuedAll Pro Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 09/29/2025
General Wiring
FiledStatusContractorScope
09/29/2025Permit IssuedKepler Electrical ContGeneral Wiring
02/20/2025CompleteBerger Quality Electrical Con—
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/04/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
05/21/2026Fire-Resistant Penetrations and JointsKAMRUZ ZAMANspecial
03/30/2026Fire-Resistant Penetrations and JointsKAMRUZ ZAMANspecial
03/30/2026Fire-Resistant Penetrations and JointsAKM RAHMANspecial
04/14/2025Structural Stability – Alterations of existing buildingsKaijin Liangspecial
04/14/2025Energy Code Compliance InspectionsKaijin Liangprogress
04/14/2025FinalKaijin Liangprogress
04/14/2025Air barrier - visual inspectionKaijin Liangenergy_progress
04/14/2025Fire-Resistant Penetrations and JointsKaijin Liangspecial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q01184950-I1Request digital key ↗
08/20/2026Q01184950-P1Request digital key ↗
08/20/2026Q01191748-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q01191748-S1Open ↗
08/13/2026Q01191748-P1Open ↗
08/13/2026Q01191748-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01184950-P1Open ↗
08/20/2026Q01184950-I1Open ↗
08/20/2026Q01191748-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01191748-P1Open ↗
09/01/2026Q01191748-I1Open ↗
08/27/2026Q01184950-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026Q01184950-P1Open ↗
08/27/2026Q01184950-P1Open ↗
08/27/2026Q01184950-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026Q01184950-P1Open ↗
08/20/2026Q01184950-I1Open ↗
08/20/2026Q01191748-P2Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01184950-I1Open ↗