P.S. 184 Flushing Manor
163-02 21 AVENUE · Bay Terrace-Clearview · BIN 4129072
💬 Discuss this project
1951Year Built
2Stories
W1Building Class
R2AZoning
102,992 sfGross Floor Area
1Units
LL97 Covered18 Open Violations 4 unresolved · 14 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 126,900 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction40p · 1 filing · 20 docs
Floor 2Under Construction27p · 1 filing · 20 docs
Floor 1Under Construction26p · 1 filing · 20 docs
Sub-BasementUnder Construction24p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2507/08/2026
NYC SCHOOL CONSTRUCTION1807/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION803/22/2026
DEPT OF EDUCATION P.S. 18303/22/2026
D.O.E. Q184203/22/2026
DOE P.S. 1841803/22/2026
DOE Q 184 040303/22/2026
DOE 040703/22/2026
DEPT OF EDUCATION P.S.184203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
POPLI DESIGN GROUP507/31/2026
AK CONSULTING SERVICES, INC507/31/2025
JAMES A. CROCKER401/03/2025
ABEL BAINNSON BUTZ, LLP302/27/2024
SOLID ENGINEERING PC201/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1003/21/2026
JMV ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KSR CONSTRUCTION CORPGeneral Contractor907/08/2026
SAFECON BUILDERS CORPGeneral Contractor707/08/2026
EVERLAST SCAFFOLDING INCGeneral Contractor407/08/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
LAWRENCE REDICKElectrical103/21/2026
FORSYTHE PLBG & HTG CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001307/31/2026
Building Lifecycle
All (155)Filed (19)Permit Issued (20)Signed Off (2)Violation (60)Inspection (12)Objection (12)Special Inspection (30)
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
08/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
08/13/2026
Special inspection requirement — Insulation placement and R values
NELSON LOPEZ
08/13/2026
Special inspection requirement — Fenestration areas
NELSON LOPEZ
08/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
NELSON LOPEZ
08/13/2026
Special inspection requirement — Fenestration air leakage
NELSON LOPEZ
08/13/2026
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
08/13/2026
Special inspection requirement — Masonry
NELSON LOPEZ
08/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2026
Objection resolved — Addressed
08/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2026
Objection raised — Other
07/31/2026
Filed — Alteration
P.S. 184-Q: Installation of new roof drains where roof is replaced.
Q00991917-P3
07/30/2026
Special inspection requirement — Masonry
NELSON LOPEZ
07/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
07/30/2026
Special inspection requirement — Insulation placement and R values
NELSON LOPEZ
07/30/2026
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
07/30/2026
Special inspection requirement — Fenestration areas
NELSON LOPEZ
07/30/2026
Special inspection requirement — Fenestration air leakage
NELSON LOPEZ
07/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
NELSON LOPEZ
06/18/2026
Permit issued — General Construction
Q08030426-I1-GC
06/15/2026
Permit issued — General Construction
Q00991917-I1-GC
06/03/2026
Permit issued — General Construction
Q08030426-I1-GC
05/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/14/2026
Permit issued — Support of Excavation
Q01192052-I1-SE
04/14/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/23/2026
Permit issued — Sidewalk Shed
Q01124955-I1-SH
03/23/2026
Permit issued — Construction Fence
Q01124953-I1-FN
03/16/2026
Violation issued (ECB, open)
Construction
03/16/2026
Violation issued (ECB, open)
Construction
03/11/2026
Permit issued — Supported Scaffold
Q01124957-I1-SF
02/27/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/24/2025
Violation issued (ECB, open)
Elevators
11/26/2025
Violation issued (FDNY_ORDER, closed)
11/26/2025
Violation issued (FDNY_ORDER, closed)
11/26/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (ECB, closed)
Construction
10/24/2025
Violation issued (ECB, open)
Construction
10/24/2025
Violation issued (ECB, open)
Construction
10/24/2025
Violation issued (ECB, closed)
Construction
10/10/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
10/01/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/26/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/11/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH JOB # Q08030426
Q00993577-I1
07/31/2025
Filed — Alteration
Q01124957-P1
07/24/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/11/2025
Permit issued — Plumbing
Q00991917-S1-PL
06/27/2025
Violation issued (FDNY_ORDER, closed)
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
06/18/2025
Filed — Alteration
P.S. 184-Q: Installation of new roof drains where roof is replaced.
Q00991917-P2
06/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
06/12/2025
Permit issued — General Construction
Q00991917-I1-GC
06/05/2025
Permit issued — Support of Excavation
Q01192052-I1-SE
04/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2025
Objection resolved — Addressed
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKSR CONSTRUCTION CORP06/18/2026
DOB NOWGeneral ConstructionPermit IssuedSAFECON BUILDERS CORP06/15/2026
DOB NOWGeneral ConstructionPermit IssuedKSR CONSTRUCTION CORP06/03/2026
DOB NOWSupport of ExcavationPermit IssuedSAFECON BUILDERS CORP04/14/2026
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING03/23/2026
DOB NOWConstruction FencePermit IssuedSAFECON BUILDERS CORP03/23/2026
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING03/11/2026
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP07/11/2025
DOB NOWGeneral ConstructionPermit IssuedSAFECON BUILDERS CORP06/12/2025
DOB NOWSupport of ExcavationPermit IssuedSAFECON BUILDERS CORP06/05/2025
DOB NOWSupported ScaffoldPermit IssuedEVERLAST SCAFFOLDING04/18/2025
DOB NOWConstruction FencePermit IssuedSAFECON BUILDERS CORP04/01/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC03/28/2025
DOB NOWSidewalk ShedPermit IssuedEVERLAST SCAFFOLDING02/26/2025
DOB NOWGeneral ConstructionPermit IssuedKSR CONSTRUCTION12/18/2024
DOB NOWConstruction FenceSigned-offKSR CONSTRUCTION12/17/2024
DOB NOWGeneral ConstructionPermit IssuedKSR CONSTRUCTION04/01/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC03/29/2024
DOB NOWSupport of ExcavationSigned-offKSR CONSTRUCTION03/29/2024
DOB NOWConstruction FenceSigned-offKSR CONSTRUCTION03/15/2024
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC04/02/2021
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC04/02/2021
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC04/02/2021
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC04/16/2019
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC03/28/2019
BISEQISSUEDCENTRAL MECHANICAL SYSTEMS INC03/28/2019
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC03/28/2019
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC03/28/2019
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC03/28/2019
BISPLISSUEDFORSYTHE P&H CORP01/22/2019
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC04/11/2018
BISMHISSUEDCENTRAL MECHANICAL SYSTEMS INC04/11/2018
BISEQISSUEDCENTRAL MECHANICAL SYSTEMS INC04/11/2018
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC04/11/2018
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC04/11/2018
BISFSISSUEDPETER AGLIARDO CONTRACTOR09/05/2017
BISBLISSUEDFORSYTHE P&H CORP06/15/2017
BISFSISSUEDPETER AGLIARDO CONTRACTOR05/03/2017
BISPLISSUEDFORSYTHE P&H CORP04/12/2017
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS INC04/10/2017
+ 27 more permits on file
2 projects · most recent 07/31/2026
Storm
FiledStatusContractorScope
07/31/2026Permit IssuedFORSYTHE PLBG & HTG CORPStorm
01/03/2025Permit IssuedVARSITY PLBG AND HTG INCStorm
10 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026CompleteCHARAN ELEC'L ENTERP'S IN—
02/20/2025Permit IssuedSTANCO SYSTEM ELEC'L CONT—
10/01/2024CompleteGEMINI ELECTRIC CO., INC.—
03/03/2023CompleteCHARAN ELEC'L ENTERP'S IN—
10/09/2020CompleteHEXAGON CONST & ELECL GRPGeneral Wiring
02/28/2020CompleteFALCON ELEC'L CONTR'G CORGeneral Wiring
02/14/2020CompleteCHARAN ELEC'L ENTERP'S IN—
11/27/2019CompleteCHARAN ELEC'L ENTERP'S IN—
08/23/2019CompleteTRIBECA ELECTRICAL CORPGeneral Wiring
05/07/2018CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 03/17/2025
FiledStatusContractorScope
03/17/2025Permit IssuedSAFECON BUILDERS CORP1 scope_items
1 project · most recent 11/07/2024
Sidewalk Shed
FiledStatusContractorScope
11/07/2024Permit IssuedEVERLAST SCAFFOLDING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/14/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/29/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/10/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
10/01/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/26/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/11/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/13/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
08/13/2026Fire-Resistance Rated ConstructionNELSON LOPEZprogress
08/13/2026Insulation placement and R valuesNELSON LOPEZenergy_progress
08/13/2026Fenestration areasNELSON LOPEZenergy_progress
08/13/2026Fenestration and door U-factor and product ratingsNELSON LOPEZenergy_progress
08/13/2026Fenestration air leakageNELSON LOPEZenergy_progress
08/13/2026Concrete - Cast-In-PlaceNELSON LOPEZspecial
08/13/2026MasonryNELSON LOPEZspecial
07/30/2026MasonryNELSON LOPEZspecial
07/30/2026Fire-Resistance Rated ConstructionNELSON LOPEZprogress
07/30/2026Insulation placement and R valuesNELSON LOPEZenergy_progress
07/30/2026Concrete - Cast-In-PlaceNELSON LOPEZspecial
07/30/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
07/30/2026Fenestration areasNELSON LOPEZenergy_progress
07/30/2026Fenestration air leakageNELSON LOPEZenergy_progress
07/30/2026Fenestration and door U-factor and product ratingsNELSON LOPEZenergy_progress
07/24/2025Post-installed AnchorsNELSON LOPEZspecial
06/25/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
06/18/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
04/04/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
04/04/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
04/04/2025MasonryNELSON LOPEZspecial
04/04/2025Mastic and Intumescent Fire-resistant CoatingsNELSON LOPEZspecial
04/04/2025Sprayed fire-resistant materialsNELSON LOPEZspecial
04/04/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
Latest 25 of 36.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 184 - QueensEducation—
Project Q01192052 Alteration · Permit Entire · 03/17/2025
Project Q01124953 Alteration · Permit Entire · 11/07/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/23/2026Q00993577-I1Request digital key ↗
08/23/2026Q00993578-I1Request digital key ↗
08/23/2026Q08030426-P4Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
02/15/2017421103317Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/23/2026Q08030426-P3Open ↗
08/23/2026Q08030426-S2Open ↗
08/23/2026Q08030426-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q08030426-P4Open ↗
09/02/2026Q08030426-P5Open ↗
08/28/2026Q00991917-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026Q00991917-I1Open ↗
08/28/2026Q00991917-I1Open ↗
08/24/2026Q00991917-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWNYCSCA - Approved Site Safety Plans5
08/13/2026Q01124953-P1Open ↗
08/13/2026Q00993577-I1Open ↗
08/13/2026Q01124955-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/20/2026Q00991917-S1Open ↗
08/20/2026Q00991917-I1Open ↗
▸Approvals, Objections & Sign-offs44
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/23/2026Q08030426-P3Open ↗
08/23/2026Q08030426-P4Open ↗
08/23/2026Q08030426-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
08/23/2026Q08030426-I1Open ↗
08/23/2026Q08030426-P3Open ↗
08/23/2026Q08030426-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026Q00993577-I1Open ↗
08/13/2026Q00993578-I1Open ↗
08/13/2026Q08030426-S2Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/15/2017421103317Open ↗
▸Other Documents26
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal21
08/23/2026Q08030426-P4Open ↗
08/23/2026Q08030426-I1Open ↗
08/20/2026Q00991917-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/13/2026Q08030426-I1Open ↗
08/13/2026Q00993578-I1Open ↗
08/13/2026Q00993577-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00993578-I1Open ↗
08/13/2026Q01192052-I1Open ↗