← Back
Elevator cooperative
163-15 BAISLEY BOULEVARD
💬 Discuss this project
1962Year Built
14Stories
D4Building Class
R6Zoning
6,940,450 sfGross Floor Area
5,860Units
LL97 CoveredRent Stabilized1,066 Open Violations 1,026 unresolved · 40 paperwork only ▸FDNY Report ↗
Elevator cooperative · Owner of record: ROCHDALE VILLAGE INC · 4,672,960 sf lot · 1.49 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
Floor 1Under Construction18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IDEAL FOOD BASKET303/22/2026
MARION SCOTT REAL ESTATE, INC903/21/2026
ASSOCIATED SUPERMARKET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC105/09/2026
HAMMOND ARCHITECTURE1108/04/2023
JONG HAE CHANG ARCHITECT105/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW CODE CONSULTING LLC1803/21/2026
C PLUS DESIGN GROUP203/21/2026
TIFFANY HAMMOND203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAJESTIC MEASURES CONSTRUGeneral Contractor807/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing607/08/2026
PSP NY CONSTRUCTION, INCGeneral Contractor303/21/2026
UNIQUE FIRE SYSTEMS INCGeneral Contractor203/21/2026
ABBRACCIAMENTO, JOHNElectrical103/21/2026
ROMA IRON WORKERS INCElectrical103/21/2026
ALPHONSE, MICHAELElectrical103/21/2026
CHEUNG, KEUNGElectrical103/21/2026
PEREIRA, WESLLEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252308/04/2023
JONG HAE CHANG ARCHITECT6169105/04/2021
Building Lifecycle
All (83)Filed (13)Permit Issued (14)Signed Off (2)Violation (14)Inspection (20)Special Inspection (20)
08/25/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2026
Filed — Alteration
Q01380182-I1
02/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2025
Permit issued — Plumbing
Q08050486-I1-PL
12/03/2025
Permit issued — Plumbing
Q08050486-S1-PL
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2025
Signed off — Alteration
Q00665310-I1
12/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2024
Permit issued — Plumbing
Q08050486-S1-PL
12/03/2024
Permit issued — Plumbing
Q08050486-I1-PL
05/07/2024
Violation issued (FDNY_ORDER, closed)
05/07/2024
Violation issued (FDNY_ORDER, closed)
02/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/11/2023
Permit issued — Mechanical Systems
Q08034155-S1-MS
10/10/2023
Permit issued — Construction Fence
Q00665310-I1-FN
10/10/2023
Permit issued — General Construction
Q00767196-I1-GC
10/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2023
Filed — Alteration
INSTALLATION OF KITCHEN EXHAUST HOOD, DUCTS AND FANS FOR DINE-IN RESTAURANT
Q08034155-S3
08/04/2023
Filed — Alteration
INSTALLATION OF KITCHEN EXHAUST HOOD, DUCTS AND FANS FOR DINE-IN RESTAURANT
Q08034155-S2
08/04/2023
Filed — Alteration
INSTALLATION OF KITCHEN EXHAUST HOOD, DUCTS AND FANS FOR DINE-IN RESTAURANT
Q08034155-S1
08/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Patrick Hammond
08/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Hammond
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Patrick Hammond
08/03/2023
Special inspection requirement — Duct leakage testing, insulation and design
Patrick Hammond
08/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
Patrick Hammond
08/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Patrick Hammond
08/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Hammond
08/02/2023
Filed — Alteration
PLUMBING WORK FOR TAKE-OUT RESTAURANT
Q08050486-P2
07/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/10/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
07/10/2023
Special inspection requirement — Final
Patrick Hammond
07/10/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
07/10/2023
Special inspection requirement — Final
Patrick Hammond
07/10/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
07/10/2023
Special inspection requirement — Final
Patrick Hammond
06/29/2023
Filed — Alteration
PLUMBING WORK FOR TAKE-OUT RESTAURANT
Q08050486-P1
06/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Hammond
06/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Patrick Hammond
05/31/2023
Violation issued (FDNY_NOV, closed)
05/25/2023
Permit issued — Plumbing
Q08050486-S1-PL
05/19/2023
Permit issued — Plumbing
Q08050486-I1-PL
04/17/2023
Filed — Alteration
PLUMBING WORK FOR TAKE-OUT RESTAURANT
Q08050486-S1
04/13/2023
Filed — Alteration
PLUMBING WORK FOR TAKE-OUT RESTAURANT
Q08050486-I1
01/04/2023
Permit issued — General Construction
Q08034155-I1-GC
12/13/2022
Filed — Alteration
INSTALLATION OF KITCHEN EXHAUST HOOD, DUCTS AND FANS FOR DINE-IN RESTAURANT
Q08034155-I1
12/07/2022
Special inspection requirement — Final
Patrick Hammond
12/05/2022
Special inspection requirement — Final
Patrick Hammond
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG12/03/2025
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG12/03/2025
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG12/03/2024
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG12/03/2024
DOB NOWMechanical SystemsPermit IssuedJJK BUILDING CONSULTING10/11/2023
DOB NOWConstruction FenceSigned-offMAJESTIC MEASURES CONSTRU10/10/2023
DOB NOWGeneral ConstructionPermit IssuedMAJESTIC MEASURES CONSTRU10/10/2023
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG05/25/2023
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG05/19/2023
DOB NOWGeneral ConstructionPermit IssuedMAJESTIC MEASURES CONSTRU01/04/2023
DOB NOWGeneral ConstructionPermit IssuedMAJESTIC MEASURES CONSTRU07/18/2022
DOB NOWConstruction FenceSigned-offMAJESTIC MEASURES CONSTRU04/07/2022
DOB NOWConstruction FenceSigned-offMAJESTIC MEASURES CONSTRU03/07/2022
DOB NOWMechanical SystemsSigned-offPSP NY CONSTRUCTION, INC09/14/2021
BISFPISSUEDNY FIRETECH INC08/28/2018
BISOTISSUEDSK ONE CONSTRUCTION INC07/26/2018
BISPLISSUEDMPS PLUMBING & HEATING INC05/02/2018
BISOTISSUEDSK ONE CONSTRUCTION INC04/19/2018
BISSPISSUEDRRP PLUMBING CORP10/26/2016
BISPLISSUEDBARGAIN PLUMBING INC07/07/2016
BISMHISSUEDMICHELLE KUO CORP07/06/2016
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/07/2014
BISPLISSUEDPETER PLUMBING ASSOC. INC.04/09/2014
BISMHISSUEDC.S.D. DESIGN LLC02/24/2014
BISOTISSUEDOESTREICHER CONSTRUCTION07/30/2013
BISSPISSUEDV. BARILE INC07/03/2013
BISPLISSUEDCAM ENERGY HEATING AND ME06/25/2013
BISOTISSUEDOESTREICHER CONSTRUCTION06/07/2013
BISOTISSUEDC.S.D. DESIGN LLC01/11/2013
BISPLISSUEDPETER PLUMBING ASSOC. INC.12/13/2012
BISOTISSUEDC.S.D. DESIGN LLC09/20/2012
BISFPISSUEDMEGA FIRE PROTECTION INC04/18/2012
BISPLISSUEDLEVIATHAN MECHANICAL CORP03/26/2012
BISMHISSUEDDESANTIS CONSTRUCTION COR03/08/2012
BISOTISSUEDDESANTIS CONSTRUCTION COR02/28/2012
BISFPISSUEDFIRE COMMAND CO, INC01/30/2012
BISMHISSUEDJAGAJEN CONSTRUCTION CORP07/15/2005
BISPLISSUEDSTEPHEN FOX P & H INC04/29/2004
BISOTISSUEDPERFECTO HOME IMPROVEMENTS04/22/2004
BISFPISSUEDFIRE FOE SYSTEM01/30/2003
+ 3 more permits on file
1 project · most recent 08/04/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2023Permit IssuedUNIQUE FIRE SYSTEMS INCHeating and Air Conditioning Systems
Heat / Cool
Tosot INDOOR UNIT: UNIX36HP230VIAH ; OUTDOOR UNITVNIX36HP230VIAO 3 tons · Ahu ×28
3 projects · most recent 01/28/2025
General Wiring
FiledStatusContractorScope
01/28/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
07/02/2023Permit IssuedV&B ELECTRICAL CONTNG INCGeneral Wiring
08/17/2022Permit IssuedK.N.C ELECTRIC INC—
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
08/25/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/04/2023Energy Code Compliance InspectionsPatrick Hammondprogress
08/04/2023HVAC-R and service water heating equipmentPatrick Hammondenergy_progress
08/03/2023Energy Code Compliance InspectionsPatrick Hammondprogress
08/03/2023Duct leakage testing, insulation and designPatrick Hammondenergy_progress
08/03/2023HVAC-R and service water heating system controlsPatrick Hammondenergy_progress
08/03/2023HVAC-R and service water piping design and insulationPatrick Hammondenergy_progress
08/03/2023HVAC-R and service water heating equipmentPatrick Hammondenergy_progress
07/10/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
07/10/2023FinalPatrick Hammondprogress
07/10/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
07/10/2023FinalPatrick Hammondprogress
07/10/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
07/10/2023FinalPatrick Hammondprogress
06/24/2023HVAC-R and service water heating equipmentPatrick Hammondenergy_progress
06/24/2023Energy Code Compliance InspectionsPatrick Hammondprogress
12/07/2022FinalPatrick Hammondprogress
12/05/2022FinalPatrick Hammondprogress
11/28/2022FinalPatrick Hammondprogress
04/22/2021Mechanical SystemsJong Hae Kimspecial
04/22/2021FinalJong Hae Kimprogress
▾Documents — 246 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026Q00509085-I1Request digital key ↗
08/26/2026Q00665310-I1Request digital key ↗
08/25/2026Q00767196-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION30
09/18/2018421471357Open ↗
07/11/2018421612598Open ↗
07/11/2018421612598Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION19
01/05/2019421471357Open ↗
08/09/2018421612598Open ↗
05/10/2018421612598Open ↗
Showing 3 of 19 on file for this type
▸BISPLACE OF ASSEMBLY1
02/08/2012420530401Open ↗
▸BISIntent to Revoke Approval/Permit1
03/14/2014420948906Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/07/2017440322134Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature16
09/27/2026Q00767196-P1Open ↗
09/26/2026Q08050486-P2Open ↗
09/26/2026Q08050486-P2Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/30/2018421612598Open ↗
03/27/2018421612598Open ↗
02/25/2017440341480Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026Q00509085-I1Open ↗
08/26/2026Q00665310-I1Open ↗
08/24/2026Q08050486-S1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
03/27/2018421612598Open ↗
07/26/2014421000302Open ↗
02/21/2014420948906Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
03/27/2018421612598Open ↗
09/02/2016440341480Open ↗
07/01/2016440322134Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/24/2026Q08034155-S2Open ↗
09/02/2026Q00509085-I1Open ↗
08/24/2026Q08034155-S3Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/02/2016440341480Open ↗
07/01/2016440322134Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/02/2016440341480Open ↗
07/01/2016440322134Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/26/2012420625817Open ↗
02/01/2012420528003Open ↗
▸Trade Schedules & Equipment31
▸BISSCHEDULE B - PLUMBING10
09/02/2016440341480Open ↗
07/01/2016440322134Open ↗
11/07/2013420625817Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
07/11/2018421612598Open ↗
07/11/2018421612598Open ↗
07/11/2018421612598Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
12/13/2014420625817Open ↗
12/09/2014420625817Open ↗
11/07/2014420625817Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS3
02/07/2017440322134Open ↗
02/07/2017440322134Open ↗
02/07/2017440322134Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
02/07/2017440322134Open ↗
02/21/2014420948906Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/08/2012420530394Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/24/2026Q08050486-S1Open ↗
08/24/2026Q08050486-I1Open ↗
08/24/2026Q08034155-S3Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
09/18/2018421471357Open ↗
03/27/2018421612598Open ↗
09/02/2016440341480Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/29/2012420495020Open ↗
11/16/2011420495020Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/27/2018421612598Open ↗
01/30/2017440322134Open ↗
12/27/2016440322134Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
02/29/2012420495020Open ↗
02/08/2012420495020Open ↗
▸BISNYCECC ANALYSIS1
07/01/2016440322134Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/01/2016440322134Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/01/2016440322134Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/27/2016440322134Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/01/2016440322134Open ↗
▸Approvals, Objections & Sign-offs16
▸BISADMINISTRATIVE OBJECTIONS7
07/26/2014421000302Open ↗
02/21/2014420948906Open ↗
09/24/2012420625817Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/05/2018421471357Open ↗
04/13/2017440341480Open ↗
02/07/2017440322134Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/25/2019421471357Open ↗
11/05/2018421471357Open ↗
02/29/2012420495020Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
02/08/2012420530394Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
11/05/2018421471357Open ↗
09/18/2018421471357Open ↗
03/27/2018421612598Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET9
09/18/2018421471357Open ↗
03/27/2018421612598Open ↗
04/14/2016421299008Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION6
08/02/2018421612598Open ↗
07/11/2018421612598Open ↗
07/11/2018421612598Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/02/2016440341480Open ↗
07/01/2016440322134Open ↗
▸BISBOROUGH INTAKE FORM2
07/11/2018421612598Open ↗
07/11/2018421612598Open ↗
▸Other Documents5
▸BISPLOT DIAGRAM3
02/29/2012420495020Open ↗
02/08/2012420530394Open ↗
02/01/2012420495020Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
12/13/2014420625817Open ↗
10/14/2014421000302Open ↗