← Back
BuildNYC
One story retail building
163-20 CROSS BAY BOULEVARD
QUEENS · BIN 4294473
💬 Discuss this project
2009Year Built
1Stories
K1Building Class
R3-1Zoning
—Gross Floor Area
1Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
One story retail building · Owner of record: BJ Cross Bay · 0.57 FAR built
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Wharton Realty803/21/2026
Keyfood203/21/2026
BJ Cross Bay103/22/2026
American Realty Capital NYRR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
24 Seven Water SewerPlumbing103/21/2026
Advantage Plumbing MechanicalPlumbing103/21/2026
B & J Fife Inc. Fire MasterFire Protection110/30/2002
C.S.D. DesignGeneral Contractor205/09/2014
D.B. RightGeneral Contractor310/21/2008
DB RightGeneral Contractor607/08/2009
Lund Fire ProductsFire Protection109/17/2014
Master Fire SystemsFire Protection112/22/2014
Panzner Demo & ContractingGeneral Contractor106/18/2008
Panzner Demolition Contracting IGeneral Contractor107/30/2008
Building Lifecycle
03/25/2026
VC17: failed to obtain and/or produce required certificate of fitness for installation of device, equipment, system; conducting an operation;…
FDNY_NOV violation · closed
05/10/2024
VC12: failed to provide required water-based fire protection system. VC12: failed to provide required water-based fire protection system. VC12:…
FDNY_NOV violation · closed
09/01/2023
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises. VC7: failed to provide…
FDNY_NOV violation · closed
10/19/2021
Structure rendered non-compliant. At time of inspection damage observed to have been sustained to rear canopy enclosure on parking lot due to car…
DOB violation · open · Issued 2021; DOB's record still lists it as active
12/24/2009
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
20 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Advantage Plumbing & Amp; Mechanical—
BIS—Master Fire Systems—
BIS—Lund Fire Products—
BIS—C.S.D. Design—
BIS—Advantage Plumbing & Amp; Mechanical—
BIS—C.S.D. Design—
BIS—DB Right—
BIS—DB Right—
BIS—DB Right—
BIS—Graphic Signs & Awnings—
BIS—Graphic Signs & Awnings—
BIS—DB Right—
BIS—DB Right—
BIS—DB Right—
BIS—Graphic Signs & Awnings—
BIS—Graphic Signs & Awnings—
BIS—Graphic Signs & Awnings—
BIS—Graphic Signs & Awnings—
BIS—Graphic Signs & Awnings—
BIS—Graphic Signs & Awnings—
BIS—Liquid Plumbing & Heating SCS—
BIS—D.B. Right—
BIS—D.B. Right—
BIS—D.B. Right—
BIS—Panzner Demolition Contracting I—
BIS—Panzner Demo & Contracting—
BIS—B & J Fife Inc. Fire Master—
Nothing on file for this building.
Nothing on file for this building.
285 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account