← Back
BuildNYC
Two family frame
163-23 SAYRES AVENUE
QUEENS · South Jamaica · BIN 4623236
💬 Discuss this project
2024Year Built
2Stories
B2Building Class
R3AZoning
2,388 sfGross Floor Area
2Units
Two family frame · Owner of record: Royal Morris · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 14 docs
Floor 29p · 2 filings · 20 docs
Floor 1Proposed curb cut11p · 3 filings · 20 docs
Cellar11p · 2 filings · 20 docs
Site & exterior3p · 2 filings · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/16/2025$1.4M—ROYAL MORRIS LLC → AVIATOR RUSS REALTY LLC$582/sf building
02/28/2024$360K—Private party → ROYAL MORRIS LLC$151/sf building
08/07/2019$80K—163 SAYRES AVENUE, LLC → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Royal T&E702/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Royal T&E403/21/2026
Preparer303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Peterkin ConstructionScaffold303/21/2026
Yafe MeodScaffold303/21/2026
Precision Home DevelopmentGeneral Contractor303/21/2026
Precision Home Developmentspecialty_contractor303/21/2026
Yafe MeodGeneral Contractor203/21/2026
DPH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pirooz Engineering7177501/15/2025
Triangle Inspection & Tes7495101/08/2021
Building Lifecycle
03/24/2025
Signed off — Alteration
PROPOSED 9' CURB CUT
Q00382185-I1
03/21/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/17/2025
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION JOB # 440613775 FILED IN BIS
Q00382186-I1
03/11/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/10/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
55 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPrecision Home Development11/15/2024
DOB NOWCurb CutSigned-offPrecision Home Development11/13/2024
DOB NOWPlumbingSigned-offDPH Plumbing & Heating06/25/2024
DOB NOWConstruction FenceSigned-offYafe Meod04/10/2024
DOB NOWConstruction FenceSigned-offPeterkin Construction01/17/2023
BIS—ISSUEDYafe Meod08/24/2024
BIS—ISSUEDYafe Meod07/29/2024
BIS—ISSUEDYafe Meod04/18/2024
BIS—ISSUEDYafe Meod04/17/2024
1 project · most recent 05/19/2024
General Wiring
FiledStatusContractorScope
05/19/2024CompleteSKY ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/21/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/11/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/10/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
11/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/08/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
01/15/2025HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
01/15/2025HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
01/15/2025FinalJAN PEREZprogress
01/15/2025Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
01/15/2025Mechanical SystemsPIROOZ SOLTANIZADEHspecial
01/15/2025Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
01/15/2025Heating SystemsPIROOZ SOLTANIZADEHspecial
01/15/2025Shutoff dampersPIROOZ SOLTANIZADEHenergy_progress
01/15/2025HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
06/24/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
06/24/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
06/24/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
06/24/2024Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
06/24/2024HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
06/24/2024HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
06/24/2024HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
06/06/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
06/06/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/06/2024Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
06/05/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
06/05/2024HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
06/05/2024HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
06/05/2024HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
139 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account