← Back
Two stories - detached, small or mid-size
163-36 90 STREET
QUEENS · BIN 4294392
💬 Discuss this project
1965Year Built
2Stories
A1Building Class
R2Zoning
2,050 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,800 sf lot · 0.54 FAR built · Flood zone AE
Locations of Work
Plumbing
Floor 11p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSS ENGINEERS111/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M&T PLBG AND HTG CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSS ENGINEERS4492111/04/2021
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Inspection (5)Special Inspection (1)
12/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/06/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/22/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/16/2021
Permit issued — Plumbing
Q00623250-I1-PL
11/04/2021
Filed — Alteration
HEREBY FILING FOR THE UPGRADE OF THE NATURAL GAS SYSTEM SERVING ALL EXISTING APPLIANCES. THERE WILL BE NO CHANGE IN PIPING, METER AND SERVICE SIZING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00623250-I1
11/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedM&T PLBG AND HTG CO., INC11/16/2021
1 project · most recent 11/04/2021
Gas
FiledStatusContractorScope
11/04/2021Permit IssuedM&T PLBG AND HTG CO., INCGas
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2022Fail-Final CND-Occupancy InspectionFailView ↗
12/06/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/02/2021Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026Q00623250-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/27/2026Q00623250-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q00623250-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00623250-I1Open ↗