ArchitectureStructural
Issued Permit Scope
Construction Fence
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
3 documents
The removal and replacement of existing building entrance systems at two locations as indicated on plans.
On file for this project
67 documents · 2 drawing sheets
To replace 4'-0 high roof rail, repair steel ladder, water tank enclosure, replace compactor stack with 6'-0 high and repair concrete slab, dunnage beam and column surface on roof.
On file for this project
14 documents · 1 drawing sheet