| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 07/31/2025 | $12.7M | — | — → — | $2,240/sf building |
| 06/30/2021 | $11.0M | — | — → — | $1,940/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| CRAFT ENGINEERING STUDIO PLLC | 3 | 11/20/2023 |
| GZA GEOENVIRONMENTAL OF NEW YORK | 1 | 11/14/2023 |
| ABS ENGINEERING, PLLC | 3 | 11/07/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 14 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CARMINE LIPPOLIS | Electrical | 1 | 03/21/2026 |
| HIGHLINE CONSTRUCTION GR | General Contractor | 1 | 03/21/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Signed-off | HIGHLINE CONSTRUCTION GR | 07/06/2023 |
| BIS | MH | ISSUED | WOODMEISTER MASTER BUILDE | 02/16/2011 |
| BIS | OT | ISSUED | WOODMEISTER MASTER BUILDE | 02/16/2011 |
| BIS | EQ | ISSUED | INTERSYSTEMS CORPORATION | 12/28/2010 |
| BIS | EQ | ISSUED | INTERSYSTEMS CORPORATION | 09/22/2010 |
| BIS | PL | ISSUED | ALKLEM PLUMBING INC | 08/16/2010 |
| BIS | MH | ISSUED | WOODMEISTER MASTER BUILDE | 07/29/2010 |
| BIS | OT | ISSUED | WOODMEISTER MASTER BUILDE | 07/29/2010 |
| BIS | MH | ISSUED | TAOCON INC | 06/23/2004 |
| BIS | PL | ISSUED | JOHN TRANI PLBG AND HTG | 06/07/2004 |
| BIS | OT | ISSUED | TAOCON INC | 05/25/2004 |
| BIS | MH | ISSUED | TAOCON INC | 05/25/2004 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 11/07/2023 | — | — | Air Conditioning Systems, Associated Ducts and Piping, Generators, Heating and Air Conditioning Systems | Cooling Mitsubishi Electric TPKA0A0181LA00A 18,000 BTU · Vrf Indoor ×1 TPKA0A0241KA70A 24,000 BTU · Fan Coil Indoor ×1 TRUYA0181KA70NA 18,000 BTU · Condensing Unit ×1 TRUYA0241HA70NA 24,000 BTU · Condensing Unit ×1 Heat / Cool Mitsubishi Electric TPVFYP024AM141A 24,000 BTU · Vrf Indoor ×6 TPEFYP012MA144A 12,000 BTU · Fan Coil Indoor ×2 TURYE1443AN40AN 160,000 BTU · Vrf Outdoor ×2 TPEFYP024MA144A 24,000 BTU · Fan Coil Indoor ×1 TPEFYP048OA140A 36,000 BTU · Vrf Indoor ×1 TPLFYP018EM141B 18,000 BTU · Vrf Indoor ×1 TPVFYP018AM141A 18,000 BTU · Vrf Indoor ×1 TPVFYP036AM141A 26,000 BTU · Fan Coil Indoor ×1 TUHYE0723AN40AN 42,000 BTU · Vrf Outdoor ×1 Heating Viessmann V 200-W B2HE 199 199,000 BTU · Boiler ×1 Ventilation Energywall U-ERV 1200HH 450 CFM · Erv ×1 Generators Cummins RS30-C30N6 Generator ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/06/2023 | — | — | 100 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/06/2023 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/05/2025 | Complete | AAA'S ELECTL CONTG CORP | 1 meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/20/2023 | — | — | 2 scope_items |
| 11/02/2023 | — | — | Steel, Concrete, Masonry |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 11/14/2023 | Structural Stability – Alterations of existing buildings | — | special |
| 11/01/2023 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 11/01/2023 | Fireplaces | — | energy_progress |
| 11/01/2023 | Electrical motors and elevators | — | energy_progress |
| 11/01/2023 | HVAC-R and service water heating system controls | — | energy_progress |
| 11/01/2023 | HVAC-R and service water heating equipment | — | energy_progress |
| 11/01/2023 | Masonry | — | special |
| 11/01/2023 | Post-installed Anchors | — | special |
| 11/01/2023 | Structural Cold-Formed Steel | — | special |
| 11/01/2023 | Structural Stability – Alterations of existing buildings | — | special |
| 11/01/2023 | Structural Steel - Details | — | special |
| 11/01/2023 | Structural Steel - High Strength Bolting | — | special |
| 11/01/2023 | Structural Steel - Welding | — | special |
| 11/01/2023 | Shutoff dampers | — | energy_progress |
| 11/01/2023 | Structural Stability – Alterations of existing buildings | — | special |
| 11/01/2023 | Concrete - Cast-In-Place | — | special |
| 11/01/2023 | Preliminary | — | progress |
| 11/01/2023 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 11/01/2023 | Subgrade Inspections | — | special |
| 11/01/2023 | Chimneys and vents | — | special |
| 11/01/2023 | Emergency and Standby Power Systems (Generator) | — | special |
| 11/01/2023 | Fire-Resistant Penetrations and Joints | — | special |
| 11/01/2023 | Heating Systems | — | special |
| 11/01/2023 | Post-installed Anchors | — | special |
| 11/01/2023 | Maintenance information | — | energy_progress |