HPD05/11/2022§ 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY
DOB03/31/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/31/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/31/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/31/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB01/03/2021ELECTRICAL WORK WITHOUT A PERMIT.NOTED:AT TIME OF INSPECTION,OBSERVATION WAS MADE INSIDE OF NEW 1ST FLOOR ENTRANCE DOOR TO APT WORKERS CONDUCTING CONSTRUCTION WORK CONSISTING OF NEW RUNNING BX ELECTRICAL WIRE T$2K due
ECB01/03/2021WORK WITHOUT A PERMIT.NOTED:AT TIME OF INSPECTION OBSERVATION WAS MADEAT 2ND-3RD FLOOR EXPOSURE 1 FRONT OF ABOVE PREMISES A METAL ERECTED STRUCTURE BALCONY WITH NEW ERECTED DROP DOWN FIRE ESCAPE LADDER AND NEW$2K due
ECB01/03/2021WORK WITHOUT A PERMIT.NOTED:AT TIME OF INSPECTION,OBSERVATION WAS INSIDE 1ST FLOOR APT OF ABOVE PREMISES WORKERS PERFOMING WORK CONSISTING OF NEW PLUMBING LINES BATHROOM NEW INSTALL AND NEW PLUMBING DRAINAGE. F$2K due
ECB01/03/2021UNLAWFULLY CONTINUED WHILE ON NOTICE OF A STOP WORK ORDER.NOTED:AT TIME OF INSPECTION OBSERVATION OF 3TO4 WORKERS PERFORMING CONSTRUCTION WORK IN PREMISES ABOVE WHILE ACTIVE OF STOP WORK ORDER WAS ISSUED AND AC$5K due
DOB11/30/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPD03/16/2016§ 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION THIRD STORY ADDED TO BUILDING CONTRARY TO CERTIFICATE OF OCCUPANCY , 3rd STORY
DOB09/10/2009WORK WITHOUT PERMIT ILLEGAL WORK NOTED: THERE IS A VERTICAL EXTENSION THAT IS CREATING A THIRD FLOOR AND THERE ARE NO DOB RECORDS TO INDICAT E THIS THE C OF O INDICATES PREMISES TO BE CELLAR BSMT 1ST & 2ND FLOOR 310228152 A2 THE FRONT PATIO IS EXCAVATED AND STEEL INSTALLED STOP AL L WORK REMEDY: OBTAIN PERMIT, ALL NECESSARY TR1'S SHOW ALL CHANGES CAL
DOB07/28/2009STOP ALL WORK WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS AT TIME OF INSPECTION I DID OBSERVE ADJOINING PROPERTY 161 RUTLEDGE BEING UNDERMINED WITHOUT PROTETION & OTHER UNDE RPINNING BEING DONE NOT SHOWN ON PLANS REMEDY: STOP ALL WORK CONFORM T O APPROVED DOCUMENTS OR AMND CALL 212 442-1698 FOR INSPECTION'
ECB03/11/2017FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35176221K ISSUED ON 08/31/16 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERMIT ATNothing owed — awaiting certificate of correction
ECB02/24/2017FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35176221K ISSUED ON 8/31/16 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. WORK W/O A PERMIT NOT A TIME OFNothing owed — awaiting certificate of correction
ECB01/13/2017FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35176221K ISSUED ON 8-31-16 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 01. FOR WORK W/O A PERMIT. AT TIME OF INSPECTION OBSERVED A 3RD STY ERECNothing owed — awaiting certificate of correction
ECB12/27/2016FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOV #35176221K ISSUED ON 08/31/16 & TO FILE A C OF C PURSUANT TO 28-201.1,28-204.4 & 1RCNY102-01. WORK W/O A PERMIT;3RD FL WAS ERECTED ON TOP OF A 2 STY BLDG.Nothing owed — awaiting certificate of correction
ECB11/23/2016FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOV #35176221K ISSUED ON 08/31/16 & TO FILE A C OF C PURSUANT TO 28-201.1,28-204.4 & 1RCNY102-01. WOKR W/O A PERMIT;3RD FL ERECTED ON TOP AT A 2 STY BLDG CONTRANothing owed — awaiting certificate of correction
ECB09/02/2016WORK W/O A PERMIT.NOTE AT THE TIME OF INSPECITON A 3RD FLOOR WAS OBSERVED ERECTED ON TOP OF A 2STORY BUILDING AT THIS PREMISES,CONTRARY TO DEPT RECORD. THERE WERE NO FILING FOR PERMIT OR APPROVAL ISSUED FOR THNothing owed — awaiting certificate of correction
ECB01/31/2013WORK W/O PERMIT. NOTED: EXCAVATION BY HAND IN PROGRESS AT THE TIME OF INSPECTION IN BASEMENT AREA. SLAB REMOVED AND DEPTH FO EXCAVATION IN SOME PLACES 4'-3' IN DEPTH. NO PERMIT WAS OBTAINED. RMDY:STOP ALL WORK.Nothing owed — awaiting certificate of correction
ECB07/28/2009FAILURE TO ADEQUATELY SUPPORT ADJOINING GROUND AND/OR STRUCTURE AFFECTED BY EXCAVATION. AT TIME OF INSPECTION I DID OBSERVE ADJOINING PROPERTY AND OTHER INTERIOR MASONRY WALLS BE BE UNDERMINED W/O PROTECTIONNothing owed — awaiting certificate of correction
ECB10/02/1995ALTERED BUILDING OCCUPIED WITHOUT A VALID COFO. ALT#2257-1987 REMEDY: OBTAIN A VALID COFO.Nothing owed — awaiting certificate of correction
ECB03/08/1995ALTERED BLDG OCCUPIED WITHOUT A VALID C OF O PURSUANT TO ALTERNATION APPLICTION#257-87.REMEDY:OBTAIN A VALID C OF O.Nothing owed — awaiting certificate of correction
ECB05/09/1991FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION ALTERATION WORK BEING PERFORMED THROUGHOUT THE ABOVE 3 STY BUILDING WIHTOUT APPROVED PLANS AT SITE REMEDY HAVE APPROVED PLANS AT SITE UNTILE WNothing owed — awaiting certificate of correction
Primarily 3 family with 1 store or office · 1,640 sf lot · 1.46 FAR built · Flood zone X