← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
163 WASHINGTON AVENUE
BROOKLYN · Clinton Hill · BIN 3054410
💬 Discuss this project
2009Year Built
16Stories
RMBuilding Class
R5BZoning
42,023 sfGross Floor Area
106Units
LL97 Covered9 Active Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 20,400 sf lot · 2.06 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Washington Hall Development3603/21/2026
Builders Leasing503/22/2026
North 4th Developer203/21/2026
The GLC Group203/21/2026
163 Washington103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Perdek, Professional Engineering103/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Everest ScaffoldingScaffold203/21/2026
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/26/2026
Closed: Failed to file FISP cycle 9B technical report by 2/21/2023
DOB violation · closed on the city's record
07/10/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01412036-I1
06/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2026
Permit issued — Suspended Scaffold
B01412036-I1-SC
139 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Structural Preservation S—
DOB NOW—Everest Scaffolding—
BIS—Riconda Maintenance—
BIS—Henry Myers P & H—
BIS—JW Development Holdings—
BIS—Riser Plumbing & Heating—
BIS—Heads Up Fire Sprinkler—
BIS—Heads Up Fire Sprinkler—
BIS—Riser Plumbing & Heating—
BIS—Pinmark Contracting Co—
BIS—Pinmark Contracting Co—
BIS—Rockledge Scaffold—
BIS—Rockledge Scaffold—
BIS—Pinmark Contracting Co—
BIS—Pheonix 132 Sutton Street—
BIS—Heads Up Fire Sprinkler—
BIS—Pheonix 132 Sutton Street—
BIS—Pinmark Contracting Co—
BIS—Riser Plumbing & Heating—
BIS—Pinmark Contracting Co—
BIS—Pinmark Contracting Co—
BIS—Rockledge Scaffold—
BIS—Pinmark Contracting Co—
BIS—Heads Up Fire Sprinkler—
BIS—Heads Up Fire Sprinkler—
BIS—Pinmark Contracting—
BIS—Rockledge Scaffold—
BIS—Riser Plumbing & Heating—
BIS—Pinmark Cont—
BIS—Pinmark Contracting—
BIS—Pinmark Contracting Co—
BIS—Pinmark—
BIS—Pinmark Cont—
BIS—Riser Plumbing & Heating—
BIS—Pinmark Contrng—
BIS—Pinmark Cont—
BIS—Pinmark—
BIS—Advanced Installations—
BIS—Pinmark Contrng—
BIS—The Big M Construction Group—
+ 1 more permits on file
Nothing on file for this building.
Nothing on file for this building.
99 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account