← Back
BuildNYC
Over six families without stores
Bremond King Davis
163 WEST 133RD STREET · BIN 1058213
💬 Discuss this project
1926Year Built
5Stories
C1Building Class
R7-2Zoning
18,860 sfGross Floor Area
19Units
Rent Stabilized7 Active Violations ▸
Over six families without stores · Owner of record: Bremond King Davis Housing Development F Und Co · 4,996 sf lot · 3.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 1 filing · 20 docs
Floor 5Under Construction13p · 1 filing · 20 docs
Floor 4Under Construction13p · 1 filing · 20 docs
Floor 3Under Construction13p · 1 filing · 20 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction15p · 1 filing · 20 docs
CellarUnder Construction17p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction9p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Queens Housing Immigrant Center707/02/2026
Bremond King Davis203/21/2026
NYC Department of Housing Preservation and Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M Engineering Design & Inspection210/20/2026
Rosenthal309/29/2025
Stat Architecture112/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Penta Restorationspecialty_contractor107/02/2026
MC SuperstructureScaffold109/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
American Construction Tes9731409/29/2025
Building Lifecycle
All (94)Filed (6)Permit Issued (2)Violation (60)Objection (8)Special Inspection (18)
10/20/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED OVERHEAD PROTECTION AND WINDOW PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01409841-P1
09/08/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED OVERHEAD PROTECTION AND WINDOW PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01409841-I1
09/08/2026
Permit issued — Sidewalk Shed
M01409841-I1-SH
06/30/2026
Permit issued — General Construction
M01124841-I1-GC
05/20/2026
Violation issued (HPD, closed)
C
05/11/2026
Violation issued (HPD, closed)
C
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, closed)
C
09/29/2025
Filed — Alteration
Propose installation of 2 boilers as per plan in conjunction with GC and PL # M01124841.
M01124841-S3
09/23/2025
Objection resolved — Addressed
09/23/2025
Objection resolved — Addressed
09/23/2025
Objection resolved — Addressed
09/23/2025
Special inspection requirement — Maintenance information
EDWIN HOPKINS
09/23/2025
Special inspection requirement — Heating Systems
EDWIN HOPKINS
09/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
09/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
09/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
09/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
08/22/2025
Objection resolved — Addressed
06/26/2025
Objection raised — Other
06/26/2025
Objection raised — Admin
06/26/2025
Objection raised — Scope
06/16/2025
Filed — Alteration
Propose installation of 2 boilers as per plan in conjunction with GC and PL # M01124841.
M01124841-S1
06/16/2025
Filed — Alteration
Propose installation of 2 boilers as per plan in conjunction with GC and PL # M01124841.
M01124841-S2
03/24/2025
Violation issued (HPD, closed)
A
03/24/2025
Violation issued (HPD, closed)
B
03/24/2025
Violation issued (HPD, closed)
B
12/26/2024
Objection raised — Other
12/18/2024
Filed — Alteration
Propose installation of 2 boilers as per plan in conjunction with GC and PL # M01124841.
M01124841-I1
12/18/2024
Special inspection requirement — Lighting controls
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Insulation placement and R values
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Fenestration air leakage
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Exterior lighting power
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWIN HOPKINS
12/18/2024
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
10/14/2024
Special inspection requirement — Final
EDWIN HOPKINS
10/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
10/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
07/30/2024
Violation issued (HPD, closed)
A
07/30/2024
Violation issued (HPD, open)
C
07/30/2024
Violation issued (HPD, open)
C
07/30/2024
Violation issued (HPD, closed)
A
07/30/2024
Violation issued (HPD, open)
B
06/17/2024
Violation issued (HPD, closed)
B
06/17/2024
Violation issued (HPD, closed)
A
01/18/2024
Violation issued (HPD, closed)
A
01/04/2024
Violation issued (HPD, closed)
C
01/04/2024
Violation issued (HPD, open)
C
01/04/2024
Violation issued (HPD, closed)
C
07/02/2023
Violation issued (HPD, closed)
B
07/02/2023
Violation issued (HPD, closed)
B
05/08/2023
Violation issued (HPD, closed)
C
05/08/2023
Violation issued (HPD, closed)
A
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedMC Superstructure09/08/2026
DOB NOWGeneral ConstructionPermit IssuedPenta Restoration06/30/2026
BISMHISSUEDE.J. Peters Construction08/16/1999
BISMHISSUEDE.J. Peters Construction01/07/1999
BISPLISSUEDF&G Plumbing & Heating01/07/1999
BIS—ISSUEDEJ Peters Construction08/24/1998
BIS—ISSUEDEJ Peters Construction10/15/1997
BISOTISSUEDGrijo Contracting08/20/1997
1 project · most recent 09/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/29/2025——Gas, Water/Sanitary
1 project · most recent 08/25/2026
FiledStatusContractorScope
08/25/2026Permit IssuedNash Electric Services—
1 project · most recent 10/20/2026
Sidewalk Shed
FiledStatusContractorScope
10/20/2026Permit IssuedMC SuperstructureSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/23/2025Maintenance informationEDWIN HOPKINSenergy_progress
09/23/2025Heating SystemsEDWIN HOPKINSspecial
09/23/2025HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
09/23/2025Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
09/23/2025HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
09/23/2025HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
09/19/2025Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
12/18/2024Lighting controlsEDWIN HOPKINSenergy_progress
12/18/2024Insulation placement and R valuesEDWIN HOPKINSenergy_progress
12/18/2024Fenestration air leakageEDWIN HOPKINSenergy_progress
12/18/2024Exterior lighting powerEDWIN HOPKINSenergy_progress
12/18/2024Fenestration and door U-factor and product ratingsEDWIN HOPKINSenergy_progress
12/18/2024Interior lighting powerEDWIN HOPKINSenergy_progress
10/14/2024FinalEDWIN HOPKINSprogress
10/09/2024Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
10/09/2024Energy Code Compliance InspectionsEDWIN HOPKINSprogress
10/09/2024Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
10/09/2024Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
10/03/2026M01409841-I1Request digital key ↗
08/25/2026M01124841-I1Request digital key ↗
08/25/2026M01124841-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/22/2026M01409841-P1Open ↗
10/03/2026M01409841-I1Open ↗
08/25/2026M01124841-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01124841-I1Open ↗
09/01/2026M01124841-I1Open ↗
08/27/2026M01124841-S3Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M01124841-I1Open ↗
08/27/2026M01124841-S3Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026M01124841-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026M01124841-I1Open ↗
08/13/2026M01124841-S2Open ↗
08/13/2026M01124841-S1Open ↗
Showing 3 of 4 on file for this type